Emirates Iron and Steel: Near-Miss ID No: Incident ID No: Date: Location: Company: Completed By: Mr. Danish Iqbal

A pump malfunctioned at the SMP-3 site near the weigh bridge at the EISC-WTP3 company, causing water to spread across the area. To prevent further overflow, operators started a second pump and increased the water flow. The water level was brought under control. An investigation found low flow from one of the pumps caused the rising water level. Corrective actions will be taken to prevent future issues.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

Emirates Iron and Steel: Near-Miss ID No: Incident ID No: Date: Location: Company: Completed By: Mr. Danish Iqbal

A pump malfunctioned at the SMP-3 site near the weigh bridge at the EISC-WTP3 company, causing water to spread across the area. To prevent further overflow, operators started a second pump and increased the water flow. The water level was brought under control. An investigation found low flow from one of the pumps caused the rising water level. Corrective actions will be taken to prevent future issues.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

EMIRATES IRON and STEEL

Near-Miss ID
5679
No:
Date:

21/07/2015

Company:

EISC-WTP3

HS Event Description

It has been observed that


in the SMP-3 Near the
Weigh Bridge WTP DC-W3
Pump malfunction and a
lot of water spread in all
area Material handling
stored the material it may
damage all the storage
material and also affect
the weigh Bridge.

Incident ID No:
Location :

SMP-3 Near Weigh Bridge

Completed by: Mr. Danish Iqbal

Action Taken to Prevent Reoccurrence

As informed by E&A team, there was


problem of low flow from one of the
pump which was in operation and level
was rising. For controlling level after
overflow, operator has started second
pump and increased water flow. After
some time water level has come down.

Action By
Department

WTP3

Close out Date

25.08.2015

CLOSE OUT PICTURES & OTHER EVIDENCES TO BE ATTACHED;


BEFORE

Note: This is an internal document used by the HSD to receive the required information which will be uploaded in
the HSE Portal as per procedure

EMIRATES IRON and STEEL

Note: This is an internal document used by the HSD to receive the required information which will be uploaded in
the HSE Portal as per procedure

EMIRATES IRON and STEEL

Note: This is an internal document used by the HSD to receive the required information which will be uploaded in
the HSE Portal as per procedure

EMIRATES IRON and STEEL

Note: This is an internal document used by the HSD to receive the required information which will be uploaded in
the HSE Portal as per procedure

You might also like