0% found this document useful (0 votes)
50 views

Calculation Flexible Pipe

This document contains calculations to check the flexibility of several internal piping sections for a cryogenic tank project. It analyzes Pipes A, B/F, and E/I/J, which are 1" Schedule 40 stainless steel pipes designed for a temperature of -320°F. For each pipe, it calculates the pipe length, expected deflection, maximum allowable deflection, and ratio to ensure the pipe is flexible enough for the design. It finds the piping is sufficiently flexible and safe based on the size and shape for all analyzed pipes.

Uploaded by

maspanuci
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Calculation Flexible Pipe

This document contains calculations to check the flexibility of several internal piping sections for a cryogenic tank project. It analyzes Pipes A, B/F, and E/I/J, which are 1" Schedule 40 stainless steel pipes designed for a temperature of -320°F. For each pipe, it calculates the pipe length, expected deflection, maximum allowable deflection, and ratio to ensure the pipe is flexible enough for the design. It finds the piping is sufficiently flexible and safe based on the size and shape for all analyzed pipes.

Uploaded by

maspanuci
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

PT.

SAMATOR
DIV. GAS ENG

PROJECT
LOKASI
SUBJECT
SECTION

: CRYOGENIC TANK (3000 GL)


: PT. PAL SAMATOR
: FLEXIBLE PIPE CALCULATION
: INTERNAL PIPING

NO

: 311-1

TGL

: 20/6/2000

REV

:0

PAGE

:1

FLEKSIBILITAS PIPA A
Pipa 1 Sch. 40 SUS 304
Temperatur perencanaan 320F = -196
Nominal diameter = 1
Y = 200 + 250 = 450
X = 2000 1480 = 520
Z = 552
= x2 + y2 + z2

= (450)2 + (520)2 + (552)2


= 881,819 ft = 268,778 M
e

= -3,806 per 100 ft


= -0,03806 inc. per ft
= -0,12486

= Le
= 268,778 X 0,12486
= 33,560 inc.
= 852,415 mm

= 250 + 552 + 4541 + 2000 +4541 + 1480 +200


= 13564 mm
= 13,564 m
0.03

(0.3048) DE
25.4(U-L)2

(0,3048)2 X 1 X 0,12486
25,4 (13,564 268,778)2

4,7867 X 10-5

# Jadi jalur pipa cukup fleksibel dan bentuk serta ukuran cukup aman.

COMPUTED
1.
2.
3.

CHECK
1.

APPROVED
1.

PT. SAMATOR
DIV. GAS ENG

PROJECT
LOKASI
SUBJECT
SECTION

: CRYOGENIC TANK (3000 GL)


: PT. PAL SAMATOR
: FLEXIBLE PIPE CALCULATION
: INTERNAL PIPING

NO

: 311-1

TGL

: 20/6/2000

REV

:0

PAGE

:2

FLEKSIBILITAS PIPA B & F


Pipa 1 Sch. 40 SUS 304
Temperatur perencanaan 320F = -196
Nominal diameter = 1
Y = 4541 + 250 200 = 4591
X = 550 154

= 396

Z = 308
L

= x2 + y2 + z2
= (396)2 + (4591)2 + (308)2

= 4618,329 ft = 1407,667 M
e

= -3,806 per 100 ft


= -0,03806 inc. per ft
= -0,12486

= Le
= 1407,667 X 0.12486
= 175,761 inc.
= 4464,336 mm

= 250 + 550 + 4541 + 308 +200


= 5849 mm
= 5,849 m
0.03

(0.3048) DE
25.4(U-L)2
=

(0,3048)2 X 1 X 4464,336
25,4 (5,849 1407,667)2

8,30941 X 10-6

# Jadi jalur pipa cukup fleksibel dan bentuk serta ukuran cukup aman.

COMPUTED
1.
2.
3.

CHECK
1.

APPROVED
1.

PT. SAMATOR
DIV. GAS ENG

PROJECT
LOKASI
SUBJECT
SECTION

: CRYOGENIC TANK (3000 GL)


: PT. PAL SAMATOR
: FLEXIBLE PIPE CALCULATION
: INTERNAL PIPING

NO

: 311-1

TGL

: 4/5/2000

REV

:0

PAGE

:3

FLEKSIBILITAS PIPA E, I & J


Pipa 1 Sch. 40 SUS 304
Temperatur perencanaan 320F = -196
Nominal diameter = 1
Y = 4541 + 250 200 = 4591
X = 750 344,4 = 405,6
Z = 688,8
L

= x2 + y2 + z2
= (405,6)2 + (4591)2 + (688,8)2

= 4660,068 ft = 1420,389 M
e

= -3.806 per 100 ft


= -0.03806 inc. per ft
= -0.12486

= Le
= 4,660 X 0.12486
= 177,350 inc.
= 4504,684 mm

= 250 + 866 + 4541 + 688,8 +200


= 6546 mm
= 6,546 m
0.03

(0.3048) DE
25.4(U-L)2
=

(0.3048)2 X 1 X 0.12486
25,4 (6,546 1420,389)2

8,24248 X 10-6

# Jadi jalur pipa cukup fleksibel dan bentuk serta ukuran cukup aman.