Crashing: Paths Expected Duration 2 Critical Paths Action

The document presents a project with multiple activities and critical paths. It evaluates crashing certain activities to reduce the project duration. Specifically: - The original project has a normal cost of $3,600 and critical paths of A-D and B-D, with expected durations of 11 and 13 weeks. - Crashing activity B once reduces the expected duration to 11 weeks at a cost of $50. Crashing both B and C reduces the expected duration to 11 weeks at a cost of $150. - Crashing both D and E reduces the expected duration to 10 weeks, with a total crashing cost of $550 and overall project cost of $4,150.

Uploaded by

mahendra_dulawat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views3 pages

Crashing: Paths Expected Duration 2 Critical Paths Action

The document presents a project with multiple activities and critical paths. It evaluates crashing certain activities to reduce the project duration. Specifically: - The original project has a normal cost of $3,600 and critical paths of A-D and B-D, with expected durations of 11 and 13 weeks. - Crashing activity B once reduces the expected duration to 11 weeks at a cost of $50. Crashing both B and C reduces the expected duration to 11 weeks at a cost of $150. - Crashing both D and E reduces the expected duration to 10 weeks, with a total crashing cost of $550 and overall project cost of $4,150.

Uploaded by

mahendra_dulawat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Activity

A
B
C
D
E

Normal Time
6
8
4
5
8

Original
A-D
B-D
C-E

11
13
12

Normal Cost
$900.00
$300.00
$500.00
$900.00
$1,000.00
$3,600.00

Total allowable
Crash time
1
2
1
2
3

Crash Cost
$1,000.00
$400.00
$600.00
$1,200.00
$1,600.00

Crash cost/day
$100.00
$50.00
$100.00
$150.00
$200.00

Crash By

Crashing Cost
0
2
1
1
1

0
100
100
150
200
550

Total

CRASHING
Step 1: Crash B once (cost $50)
Paths
A-D
B-D
C-E

Crash Time
5
6
3
3
5

Expected Duration
11
12
12

2 critical paths

Step 2: Crash B(cost $50) &C(cost $100) once


Paths
Expected Duration
A-D
11
B-D
11
C-E
11
Step 2: Crash D(cost $150) &E(cost $200) once
Paths
Expected Duration
A-D
10
B-D
10
C-E
10
Normal Project Cost
Total Cashing cost=
Total Cost

$3,600.00
$550.00
$4,150.00

Path
A-D
B-D
C-E

Length
11
13
12

Crash B
11
12
12

Action
Crash B
Crash B & C
Crash D& E

Marginal cost
50
150
350

Total Crash Cost


50
200
550

Crash B & C
11
11
11

Crash D & E
10
10
10

Activity
A
B
C
D
E
F

Immediate
Predecessor.

Normal
Time(weeks)
10
8
10
7
10
3

__

A
B
A
D
C, E

Normal
Cost
30
120
100
40
50
60

Total

Crash
Cost
70
150
160
50
75
95

400

Path
A-B-C-F
A-D-E-F

Length

Crash B

Action
Crash B
Crash F
Crash F

Marginal Cost Total Crash Cost


15
15
17.5
32.5
17.5
50

31
30

Crash
Time(weeks)
8
6
7
6
8
1

30
30

Crash F Crash F
29
29

Total Project Cost = Total Normal cost + Total Crash cost

28
28

450

Allowable
Crash time
2
2
3
1
2
2

Crash Cost
/week
$
$
$
$
$
$

20.00
15.00
20.00
10.00
12.50
17.50

C
F

A
D

B(3)

F(4)

G(5)

D(5)

A(7)

C(4)

E(2)

Activity

Normal Time

Crash
Time

A
B
C
D
E
F
G

7
3
4
5
2
4
5

6
2
3
4
1
2
4
$35,000

Action
Crash A
Crash C
Crash F
Crash F

Marginal
Cost
$1,000
$1,200
$1,500
$1,500

Total Crash
Cost
$1,000
$2,200
$3,700
$5,200

Total Project Cost = Total Normal cost + Total Crash cost

$40,200

Normal
Cost
$7,000
5,000
9,000
3,000
2,000
4,000
5,000

Crash Cost
$8,000
7,000
10,200
4,500
3,000
7,000
8,000

Cost/Day
$1,000
2,000
1,200
1,500
1,000
1,500
3,000