100% found this document useful (1 vote)
5K views

Lunch Time Notice

The document outlines the lunch times and durations for different shifts of ACWA PIPE maintenance staff. The first shift from 6 AM to 6 PM has a first break from 11:45 AM to 12:15 PM for most staff, and the second shift from 6 PM to 6 AM has a lunch break from 12 PM to 12:30 AM. Staff are asked not to eat lunch at their workplace and any changes to the schedule must be approved by their Engineer.

Uploaded by

raza514
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
5K views

Lunch Time Notice

The document outlines the lunch times and durations for different shifts of ACWA PIPE maintenance staff. The first shift from 6 AM to 6 PM has a first break from 11:45 AM to 12:15 PM for most staff, and the second shift from 6 PM to 6 AM has a lunch break from 12 PM to 12:30 AM. Staff are asked not to eat lunch at their workplace and any changes to the schedule must be approved by their Engineer.

Uploaded by

raza514
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Subject: Lunch Time and Duration

Dear All,
This is to inform all the ACWA PIPE maintenance staff that as per the company policy following lunch timings will be followed,

SHIFTS AND LUNCH TIMES


1ST break
(11:45 am 12:15 pm) (Fabricators, Electricians, machinist and
mechanics)
SHIFT (6:00 AM 6:00 PM)
2nd break
(12:00pm 12:15 pm) (1 x Responsible person)

2ND SHIFT (6:00 PM 6:00 AM)

( 12:00 pm 12:30 am)

Also kindly refrain from having lunch at your workplace. We hope that this will be followed strictly. Any changes in this schedule shall
be reviewed and approved by your Engineer. As in the past, if you are not able to take a break at the specific time listed due to work in
progress, you must notify your Engineer.
Your cooperation with this regard is expected and will be highly appreciated.

Maintenance Department

You might also like