0% found this document useful (0 votes)
79 views

3WLA Piping PDF

This document outlines the planned start and finish dates for piping and painting work for projects at 3 WLA locations. It includes the scheduled dates for welder qualifications, pipe fabrication, pipe supports fabrication, painting, and pipe erection on racks for each area between October 2015 and June 2016.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views

3WLA Piping PDF

This document outlines the planned start and finish dates for piping and painting work for projects at 3 WLA locations. It includes the scheduled dates for welder qualifications, pipe fabrication, pipe supports fabrication, painting, and pipe erection on racks for each area between October 2015 and June 2016.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

3 WLA PIPING & PAINTING WORK

Start

Finish

BL Project Start

BL Project
Finish

Welder Qualifications
Prepartory Works for Pipe Fabrication

02-Mar-15 A
02-Mar-15 A
18-Aug-15 A

1-Dec-15
1-Dec-15
19-Oct-15

2-Mar-15
2-Mar-15
18-Aug-15

17-Nov-15
17-Nov-15
30-Sep-15

UTA - A/G Piping Fabrication


PGA - A/G Piping Fabrication
GP1 - A/G Piping Fabrication
ICR - A/G Piping Fabrication
ECA - A/G Piping Fabrication

04-Oct-15 A
03-Oct-15 A
12-Sep-15 A
01-Sep-15 A
12-Sep-15 A

9-Apr-16
14-Feb-16
22-Aug-16
10-Feb-16
28-Aug-16

7-Oct-15
7-Oct-15
4-Oct-15
27-Aug-15
19-Oct-15

6-Apr-16
11-Feb-16
22-Aug-16
7-Feb-16
22-Aug-16

ICR - A/G Piping Supports Fabrication


GP1 - A/G Piping Supports Fabrication

22-Oct-15
29-Oct-15

23-Mar-16
13-Jan-16

21-Oct-15
28-Oct-15

19-Mar-16
13-Jan-16

UTA - A/G Piping Painting


PGA - A/G Piping Painting
ICR - A/G Piping Painting
GP1 - A/G Piping Painting

25-Oct-15
25-Oct-15
15-Oct-15
19-Oct-15

1-May-16
16-Mar-16
31-Jul-16
22-Sep-16

25-Oct-15
25-Oct-15
3-Oct-15
19-Oct-15

23-Apr-16
29-Feb-16
17-Jul-16
6-Sep-16

ICR - A/G Piping Erection on Rack - LTCS


ICR - A/G Piping Erection on Rack - SS

15-Oct-15
25-Oct-15
15-Oct-15

13-Jun-16
13-Jun-16
12-Jun-16

7-Oct-15
24-Oct-15
7-Oct-15

11-Jun-16
11-Jun-16
2-Jun-16

Activity ID
COMMON AREA (CMA)
Piping
Welder Qualificatios
PFCMACPF130AA
PFCMACPF130AB
Pipe Fabrication
PFCMACPF130A
PFCMACPF130B
PFCMACPF130E
PFCMACPF130J
PFCMACPF130M
Pipe Supports Fabrication
PFCMACPF130T
PFCMACPF130U
Painitng
Piping
PFCMACPT100A
PFCMACPT100D
PFCMACPT100G
PFCMACPT100I
INTERCONNECTING PIPERACK (ICR)
Piping
PFICRCPI020A
PFICRCPI020B

Activity Name