Production Plan: Bajaj Auto Ltd. Chakan Plant
Production Plan: Bajaj Auto Ltd. Chakan Plant
Chakan Plant
Model
Pulsar 150 UG4.5
Pulsar 180 UG4
Pulsar 220 SF
Pulsar 220 S
PULSAR 200NS
AVENGER 220
KTM 125 MY14
KTM 200 MY14
KTM 390 MY 14
RC 390 ( KT06)
RC 200 ( KT05)
RC 125 ( KT04)
domestic
50000
10000
4000
2232
3554
1175
315
71276
Working days
26
Export
5256
1534
772
5668
846
1040
980
1000
810
20
806
18732
Total
50000
15256
5534
772
7900
4400
1040
2155
1315
810
20
806
90008
Product wise
70790
7900
4400
6146
89236
Daily DOM
1923
385
154
0
86
137
0
45
12
0
0
0
2741
Daily EXP
Total daily
0
202
59
30
218
33
40
38
38
31
1
31
720
1923
587
213
30
304
169
40
83
51
31
1
31
3462
DAILY TOTAL
3462
Pulsar 150
UG4.5
x1
x2
x3
x4
x5
x6
x7
x8
x9
x10
1
1
1
1
1
587
Pulsar 180
UG4
213
Pulsar 220
SF
30
Pulsar 220 S
304
PULSAR
200NS
169
AVENGER
220
40
KTM 125
MY14
83
KTM 200
MY14
1
1
1
4
1
4
51
31
1
RC 200
( KT05)
31
RC 125
( KT04)
Total Req.
Weight
1
4
1
4
1
4
1
4
2752
1923
1923
829
304
169
1923
1923
236
946
0.236
0.725
0.585
0.716
0.717
0.762
0.122
0.433
0.220
0.114
No of Parts
per Bin
Nos/Bin
30
14
8
14
20
14
45
10
50
100
Bin Dimension
Wt of
Length Width Height empty Wt per Bin
Bin
Kg/Bin
Kg/Bin
Cu. M / Bin
0.4
0.6
0.6
0.6
0.6
0.6
0.4
0.6
0.4
0.3
0.3
0.4
0.4
0.4
0.4
0.4
0.3
0.4
0.3
0.2
0.1
0.14
0.2
0.14
0.2
0.14
0.08
0.2
0.16
0.05
0.75
1
1
1
1
1
0.75
1
0.75
0.5
7.84
11.15
5.68
11.02
15.35
11.67
6.23
5.33
11.77
11.89
0.012
0.0336
0.048
0.0336
0.048
0.0336
0.0096
0.048
0.0192
0.003
Nos. / day
92
137
240
59
15
12
43
192
5
9
805
Total Vol
Total Wt
Cu. M
Kg
1
5
12
2
1
0
0
9
0
0
30
719
1532
1365
653
233
141
266
1026
56
112
6102
Vehicle Data
TATA 909
TATA 709
TATA ACE
L (m)
B (m)
H (m)
4.381
3.833
2.14
2.042
2.057
1.43
2.13
2.13
1.65
Permissible Wt
(in Kg)
6000
3000
1000
Trip Cost
Rs/trip
1800
1500
1000
Objective Function
Trip Cost
Truck Type
Decision Variable - No of trucks of
each type
1800
y1
1500
y2
1000
y3
x1
x2
Decision Variable and Constraints pertaining to Truck Type1
x1y1
x2y1
Decision Variable - No of Bins of
96
100
each type
Weight Constraint
7.84
11.15
Volume Constraint
0.012
0.0336
x3
x3y1
177
5.68
0.048
96
137
240
Condition
Min Req. Constaint
Max Req. Constaint ( +5% tol.)
92
96
137
144
240
252
2 <=
100
ation cost)
x4
x5
x6
x7
x8
x9
x10
x4y1
x5y1
x6y1
x7y1
x8y1
x9y1
x10y1
43
11.02
0.0336
15.35
0.048
11.67
0.0336
6.23
0.0096
5.33
0.048
11.77
0.0192
11.89
0.003
x4y2
x5y2
x6y2
x7y2
x8y2
x9y2
x10y2
59
15
12
192
11.02
0.0336
15.35
0.048
11.67
0.0336
6.23
0.0096
5.33
0.048
11.77
0.0192
11.89
0.003
x4y3
x5y3
x6y3
x7y3
x8y3
x9y3
x10y3
11.02
0.0336
15.35
0.048
11.67
0.0336
6.23
0.0096
5.33
0.048
11.77
0.0192
11.89
0.003
12
43
192
12
13
43
45
192
202
5
5
9
10
15
>Min, <Max
59
15
62
16
LHS
RHS
3138 <= 6000 (Total Wt loaded in vehicle is less than max. permissible)
13 <= 19 (Total Vol loaded in vehicle is less than max. allowable)
LHS
RHS
3000.00 <= 3000 (Total Wt loaded in vehicle is less than max. permissible)
16.79 <= 17 (Total Vol loaded in vehicle is less than max. allowable)
LHS
RHS
0 <=
0 <=
0
0
x. permissible)
ax. allowable)
x. permissible)
ax. allowable)
x. permissible)
ax. allowable)
pply is allowed)
Output
Vehicle Selection
Vehicle
Type
TATA 909
TATA 709
TATA ACE
Tag
Total No Trips
y1
y2
y3
1
1
0
Sl. No
Part No
Tag
1 52DH0177
2 52DH0695
3 52DJ0412
4 52JC0163
5 52JL0013
6 52JM0013
7 DH101898
8 DH161410
9 JG113009
10 JG113800
x1
x2
x3
x4
x5
x6
x7
x8
x9
x10
Loading Patter
(Nos of Bins per
Part Desc
SF:BALANCER IDLER HOLDER WITH BEAR
COVER LHRR MOONLIGHT K1
GRAB HANDLE KIT BLACK LH/RH WITH B
LH RR COVER ASSLY K2/K3 MOONLIGHT
GRAB HANDLE WITH TPT N WASHER JL
COVER LH RR WITH BOLT FOR JM
INTAKE MANIFOLD K1(UG5)
GRAB HANDLE ASSY
CHANGE LEVER
DUMBLE SPACERS FOR STEPHOLDER
No of
Bins
(Min)
92
137
240
59
15
12
43
192
5
9
No of
Bins
(Max)
96
144
252
62
16
13
45
202
5
10
TATA 909
96
100
177
0
0
0
43
0
0
0
Loading Pattern
(Nos of Bins per trip)
TATA 709 TATA ACE
0
37
64
59
15
12
0
192
5
9
0
0
0
0
0
0
0
0
0
0
Total
Shipped
96
137
240
59
15
12
43
192
5
9