100% found this document useful (3 votes)
360 views

Pile Cap Reinforcement

This pdf will help you design consideration about pile caps & piles.

Uploaded by

KhinSander
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (3 votes)
360 views

Pile Cap Reinforcement

This pdf will help you design consideration about pile caps & piles.

Uploaded by

KhinSander
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 11
SECTION FIVE PILECAP REINFORCEMENT BALCONY SPANDREL PANELS SECTION FIVE : PILECAP REINFORCEMENT This Section enables engineer to specify prefabricated reinforcement details for reinforced concrete pilecaps for single pile to 5-pilegroup. The pilecaps include those on precast concrete driven piles ond bored piles. Design pile capacity is based on pile material strength. Engineer shall use his own discretion when soil parameters governing the design of ple capacity. Engineer shall liaise with fabricators for feasible cage. When machine fabrication is not possible for reinforcement bar above 16mm diameter or due to their bors arrangement, manual fabrication could be adopted 5.1 Design Considerations 1. Annotation for pilegroup reference number with its specific ype, size and number of piles are shown in the following examples Example 1]: 1P1S0 from Pilecap Design Tble ‘RPI’, where, 1RP = Denotes single pile for precast reinforced concrete driven pile 150 = Denotes 150mm x 150mm precast einforced concrete driven pile size Exemple (2): SBP450 from Pilecop Design Table ‘8P1’, where, SBP — Denotes 5 Filegroup for bored pile 450 ~ Denotes 450mm diame! bored pile size 2. Pile working capacity based on material strength is used in the pilecap design. (i) For Grode 45 Precast Reinforced Concrete Driven Piles, Pile Werking Capacity fin kN) = (45]N/mm? x (Pile Areo}mm? x (10%) kN. 4 li) For Grode 35 Bored Piles Pile Working Capacity (in kN) = (35]N/mmé x (Pile Area}mm? x (10%) kN. 5 3. Load factor 1.5 to pile working capacity is adopted in the pilecap design 4. Piles spacings of 3.0 and 2.5 times are adopted for precost reinforced concrete driven pile and bored pile respectively subject to engineer's requirement. 5. Pile penetration of 100mm and 125mm are used in the pilecap design for precast reinforced concrete driven piles ond bored piles respectively unless otherwise required by engineer. Individual pile deviation from its true position is token to be 75mm in the design. Concrete covers to all sides and from pile cutoff level to neorer reinforcement are taken as 50mm unless otherwise specified by engineer. 8. Steel reinforcement of f, 460 N/mm? and concrete characteristic srength, fa, 35 N/mm’ are adopted in the design. The use of other grade of concrete and/or larger concrete covers are subjected to engineer's requirement such as when severe exposure is to be met. 9. Provisional of 0.13% of concrete sectional orea of pilecap for top layers of reinforcement and pile’s reinforcement conchorage length are subjected to Engineer's requirement, 10. Horizontal binder reinforcement is token as 25% of the main reinforcement areas of pilecap. 11, Engineer shall corry out his own check to ensure design shear stress along column perimeter is not exceeding 0.8 Jf. or 5 N/mm’, whichever the lesser. Recommended minimum crifical column perimeter shown in the design tables shall be taken os a guide. 58 os [feet tin serene) Hh Example ‘2’ : Typical Pilecap Sectional Detail with Slab or Beam Case Together Example ‘1’ : Typical Pilecap Sectional Detail with Slab or Beam on Top (1) Provision of Top Layers of Reinforcements (Ti and 12) and Pile’s Reinforcement Anchorage Length (L) are subjected to Engineer's requirement. (2) Conerete Covers, Ci and C2 = 50 mm. = 100 mm (for Precast Reinforced Concrete Driven Pile). (3) Pile Penetration, = 125 mm (for Bored Pile). 5.3 Satndard Nota aes ingle Pile And 2 Pilegroup nO 1 to) > fren 1 ton) ‘REINF 81 (bottom) ‘REM Bia (bottom) + ‘RENE T2 (top) ON TD T]] Cree ton) [ofr be feton) dL 1p + 2 roe 9 f a) ec | owe 2 4 “aE “RENE B3 (BINDERS) ot PREM 8 (Ono) 4 —RENF Bto (Sed Loyer) row 81 4 TENE 5 Cd tow) | Tt —} reno (toe) 0 ‘ ry {is AE ' |- 2 WS PLE NOTES (1) Provision of Top Layers of Reinforcements (Ti and 12) and Pile’s Reinforcement Anchorage Length (L) are subjected to Engineer's requirement. (2) Concrete Covers, C1 and C2 = 50 mm. (3) Pile Penetration, P = 100 mm (for Precast Reinforced Concrete Driven Pile) = 125 mm (for Bored Pile) 9 fone 1 (os) —EBrH fy fom Botan) A [IN tm) eee O SS: Bn S08 2 (ton) AO 81 (ton) 4 - ROW Ba Gon) 0 - RENE 94 (vtion) 1 : £08 81 ton) fo 33 | PoE RE cea =O | pe . » fe fe a apa a 8, T + na (oe) ne 3 (ces) 8 Bia (0 La) AO 9 + 2 (ao) or te OM Bia (0 Lay pre Osa A006 2 (om) OE BF (te) rm Tyas FE 7705. Pe NOTES (1) Provision of Top Layers of Reinforcements (T1 and 72) and Pile’s Reinforcement Anchorage Length (1) are subjected to Engineer's requirement. (2) Comerete Covers, Ci and C2 = $0 mm. (3) Pile Penetration, P = 100 mm (for Precast Reinforced Concrete Driven Pile). = 125 mm (for Bored Pilel. EER Doric ace iis Notes ate EH Sn) fave Bie (ton) wea EERE, ON 83 (once) RENE 820 (4 Loy) {#08 Bie (4 Le) RENE 82 (26 ley) {ABE BI (1H ae) 5 NOS. PLE) (1) Provision of Top Layers of Reinforcements (T1 and T2) and Pile's Reinforcement Anchorage Length (L) are subjected to Engineer's requirement, (2) Concrete Covers, C1 and C2 = 50 mm. (3) Pile Penetration, P = 100 mm {fr Precast Reinforced Concrete Driven Pile). = 125 mm (for Bored Pile). Clea Siz ab SUC AvE Sue ae Siz au Ose aes Ost aur 0s¢ ade os aie Osea 002 aus (002 aur (002 ave 007 ake 007 at SL as SL aie SLL ave SLi aie StL au Ost aus Ost at Ost ake Ost ae [uns pay sovouiog awe | vara X_]_ INA Abode) wuinjo> wnwuy SDIeg WeWeD1OjuN Bunpomy dnosBoyg Ost ait Sous 3Iy dnosBalg SH lld N3AMIG 313ADNOD GIIYOINITA 1SVITUd UOI STIVING dVDaTId 4O 1NGIHDS #1d¥ FTaVL Per escer soe ror roroc me ey Riel? Mr Teale. Osc] 058] Osee| DarIT O50 aS B2LZ 0521 osze| osze| 0216 Osy ay 02a ori ozoe| see ‘oreo Osh aE Er ort] 006 | O57 0957 O50 aie SUL wee ‘008 | 006 | 006 ose ‘Ser 0952] 0580 (0006 targa 07 ais BILL ‘21 0g0| 0802 ooze Or ar 02s ‘00P1 | 0061 0500 Ors or ae S18) Sav | osci 058 | D507) 09 ‘319 Ste] 008 | O58 | 058 oar Selee ‘oz o0¥e| o0re| (0062 Earn ‘00r | 0021] OS61 | OS6r| i) 0219 SG ost] 07a 0861] Ovi ‘aust SE5 | oor [ose] 0a | os6r| OSE fe ‘07 | 008 | 008 | 008 Ea ast Te (05 | oar [oort| O0€z) OOEE| 0069 Ose aS ‘Stist 525 | oor [oort | 0s@1 Osar| ig Ose ar m9 525 | Oov [oozi| Oezi | Oser| Ory OSE aE ‘oust a oct} 008 | O68 Oe ae a Szist Dor | 008 | 008 Ose aL 059) ort oa1z| 0012] DOE aE Szigt or ort} oazt} oozt O06 aur w9 Or 851) OOZT “O0E due ‘OUT or ‘08 | OOLT OIE aT (wu) pbey soroueg | CLee cajuey | yao Eu zara 1a 48 ‘008 | 008, oT 4 aA ‘wuinjo> wnwuly SHDIAG HBUISDIONIOY [wu s1jeu0a0g dosayig INA) Ab0d05 Burpogy dnosBong Ove aut e5u019j0y daoBajg Sd N3AIUG 319YINOD GIYOINITA 1SVIIUd NOs STIVLI dvDITId 40 IINGIHDS 'Gdu aTaVL ooze fooze 008 48s lovee oee 008 aa lavoe ore 008 dae fooet oe 008 a8z 08 [00e1 eels Doce 1.959} 008 {oes joo} ope 008 28 foo (000 485 cence loort [000 loooe (004 aa CELE ae jo00e (00 ae Ze oz [o00e 02 ae ELL zeL0e poz ooze 02 gat [o0ee ore 1009 48S TELL fooaz 092 000 ear 76 loave 0092 008 a8e Tel oor 082 009 az enor por oor 008 dar Sele pose oose (005 485 a pee lovee 005 dar Ea lorie looez 005 a8e see foot ooEz 0s aa eug looor oor St6T foose. 082. 00s aa Os 28s zoe lace ooze Osh aah cas jose jooez O57 ae Ty cae [ooor joo Osr aa {wu p,bay sereueg ‘wuinjo> wsnusiyy z1gee fe eae vase [ocaquou] ca suey Say a 18 ey ‘00h 2 a[A O00 | X_|_ (Ny) Appede Sydieg wewer10juIey (ww) s19jewDuog dosapa ~ auton snoiny osr ar "SH ld GIYOG YOA STIVIIG dvdaTid 4O FINGAHDS !1da ITV cock as oz! da 02T dae uel ae oz ast OTT 8s Onl ay O01 dae oor das 00T dar (0001 da ‘001 daz (001 da wu) poy jeune | cles | Liyiea | Casey | vajwee | ocaweE Pre ww | ame (Na) Aipodoy, UUIA\O> wnWUrYy SpOi9g jowers0juIEy (wiuu) s9jouo10g dorajig Buryoj dnosBeyg S1ld G3xOs AOS STVLIG dA 4O F1NGIHDS ‘7d ITAVL

You might also like