0% found this document useful (0 votes)
81 views1 page

Jhlasalle 102243 Partitions

This document outlines specifications for a sliding partition system for a proposed two-storey school in Banawang, Bataan, Philippines. It includes requirements for fire, structural and seismic performance as well as submittal requirements including shop drawings, product information, samples, and a mock-up. The contractor is to propose the specific sliding partition system to be used.

Uploaded by

Ponz Madiano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

Jhlasalle 102243 Partitions

This document outlines specifications for a sliding partition system for a proposed two-storey school in Banawang, Bataan, Philippines. It includes requirements for fire, structural and seismic performance as well as submittal requirements including shop drawings, product information, samples, and a mock-up. The contractor is to propose the specific sliding partition system to be used.

Uploaded by

Ponz Madiano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROPOSED TWO-STOREY JAIME HILARIO INTEGRATED SCHOOL - LA

SALLE
DIVISION
10 - SPECIALTIES
SECTION 10 22 43 - Sliding Partitions
June 2013

Project
:
Location :

Proposed Two-Storey Jaime Hilario Integrated School - La Salle


Banawang, Bagac, Bataan

DIVISION

10

SECTION 10 22 43

SPECIALTIES
-

Sliding Partitions

PART 1 GENERAL
1.1

PROJECT INCLUDES:

A. Sliding Partition System (to be proposed by contractor)


1.2

QUALITY ASSURANCE
A

Fire, structural and seismic performance shall meet the requirement of


building code and local authorities.

Comply with the applicable provisions and recommendations

PART 2 SUBMITTALS
A.

Submit shop drawings and complete product information.


shall include:

Shop drawings

1. Partition layout indicating dimensions.


2. Anchorage and connection details.
3. Other details necessary
B.

Submit samples of finishes for Architects selection.

C.

Submit mock-up of Sliding Partition System unit for approval.

D.

Submit specifications.

End of Section 10 22 43

Sliding Partitions
10 22 43

Page 1 of 1