The RO plant water treatment procedure involves cleaning the NaCl drum, refilling it with 5kg of NaCl and stirring for 15 minutes in brine and slow mode. The filter cylinder handle is then moved to fast rinse for 1 minute, back wash for 2 minutes by powering up the motor, and this 1-2 minute process is repeated 3 times. Finally, the handle is moved to service mode and the full process should be done monthly, with filter changes every 3 months and brine solution waste every 45 days.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
182 views
Plant Water Treatment Procedure
The RO plant water treatment procedure involves cleaning the NaCl drum, refilling it with 5kg of NaCl and stirring for 15 minutes in brine and slow mode. The filter cylinder handle is then moved to fast rinse for 1 minute, back wash for 2 minutes by powering up the motor, and this 1-2 minute process is repeated 3 times. Finally, the handle is moved to service mode and the full process should be done monthly, with filter changes every 3 months and brine solution waste every 45 days.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
RO plant water treatment procedure
Clean the drum of NaCl
Refill the drum with 5kg NaCl and stirrer it Move the handle of filter cylinder to (brine & slower) option up to 15 mints After 15 mints move the handle of cylinder to (fast rinse)option for 1 mint After 1 mint move the handle of cylinder to(back wash) option for 2 mints and power up the motor Repeat 1&2 mint process for three times After repeating, move the handle of cylinder to (service)mode option. Water treatment process must be done once in a month, filter should be changed after three months, brine solution should be wasted after 45 days