How Is School Adequacy Determined?

School adequacy is determined annually for each school level (elementary, middle, high) by cluster area. It is based on comparing projected school capacity from existing and planned schools with projected enrollment over the next 5 years based on factors like births, aging population, housing, and migration. If projected enrollment exceeds 120% of capacity, a moratorium is placed on new development. If it exceeds 105% but is less than 120%, a school facility payment is required from new developments. The methodology uses student address data and parcel information to estimate student generation rates from different housing types.

Uploaded by

Planning Docs
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

How Is School Adequacy Determined?

School adequacy is determined annually for each school level (elementary, middle, high) by cluster area. It is based on comparing projected school capacity from existing and planned schools with projected enrollment over the next 5 years based on factors like births, aging population, housing, and migration. If projected enrollment exceeds 120% of capacity, a moratorium is placed on new development. If it exceeds 105% but is less than 120%, a school facility payment is required from new developments. The methodology uses student address data and parcel information to estimate student generation rates from different housing types.

Uploaded by

Planning Docs
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

How is School Adequacy Determined?

School adequacy is measured for each school level by high


school cluster.

School facility adequacy is based on projected school capacity


compared to projected enrollment.

Projected capacity measures existing and planned school capacity.


Existing school capacity is defined as MCPS program
capacity.
Planned school capacity is the capacity funded in the 6-year
CIP.

Projected enrollment is based on several factors:


Births in the County.
Aging of the school-age population.
Migration of residents into and out of the County.
Housing (new housing and the resale of existing homes).
Forecast 5 years into the future.

When projected enrollment exceeds projected capacity (termed


utilization level), either a payment is required for development to
proceed or a moratorium is imposed.

If projected enrollment 5 years in the future exceeds 120 % of


projected capacity (existing and planned), a moratorium is placed on
the approval of new residential development.
Senior or age-restricted housing, and development of no more
than 3 residential units are exempt from a moratorium.
If projected enrollment 5 years in the future exceeds 105 % of
projected capacity but does not exceed 120%, a School Facility
Payment is required for each school level over 105 %. The payment
rates vary by school level based on construction costs and by
dwelling unit type.

Test for adequacy is conducted annually at all three school levels


(elementary, middle and high) for each school cluster area

Student Generation Rates are an estimate of the number of students


generated by different housing types.
New methodology developed in cooperation between Montgomery
County Public Schools (MCPS) and Montgomery County Planning.
Two major inputs:

Student addresses with grade-level information attached


(confidential information removed).
Parcel File with residential structure information.

What can be changed in the 2016 Subdivision Staging Policy ?