100% found this document useful (1 vote)
248 views

04 P&ID CVC Separator

This document describes the protection system and ESD control system for a CVC area. The CVC separator is designed for 50 psig and 300°F but operates at 5 psig and 227°F. In normal conditions, vapor and liquid flow rates and temperatures are listed. During an ESD event, the 30" CVC line's built-up pressure reaches 130 psig. Safety valves close while bypass lines open to release upstream pressure downstream.

Uploaded by

hariridk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
248 views

04 P&ID CVC Separator

This document describes the protection system and ESD control system for a CVC area. The CVC separator is designed for 50 psig and 300°F but operates at 5 psig and 227°F. In normal conditions, vapor and liquid flow rates and temperatures are listed. During an ESD event, the 30" CVC line's built-up pressure reaches 130 psig. Safety valves close while bypass lines open to release upstream pressure downstream.

Uploaded by

hariridk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PROTECTION SYSTEM

SET @ 15 PSIG
18 PCV
(FO)

CVC SEPARATOR
Design : 50 psig / 300 deg F
Operating : 5 psig / 227 deg F

(FO)

18 GAF-2

10 GAF-2 (NO)

18 GAF-2

PSH
30X24

10 GAF-2 (NO)

SET @ 6 PSIG
10 PCV

24 GAF-3 (NC)

20 GAF-3
30X24

RUPTURE DISC 20 GAF-3


24 GAF-3

NO

LXH

CVC VENT STACK


DIM. : 36 DIA x 72-0 H

LSH

CVC
SEPARATOR

LSL

LXL

VENT TANK
DIM. : 21-6 DIA x 16-0 H
CAP. : 1000 BBLS

LXLL

To Prod. Gath. Line


To Fin Fan Cooler
FLUID SUMP PUMP

From casing wells

To Production Gathering Line

NOTES

CVC PUMP

REV

DESCRIPTION

BY

APPD

DATE

DWG No.
ESD Control System at CVC Area 6

Sheet
No.

Ref. DRWG.
Drawn

Date

Checked

Date

Approved

Date

Proj.
No.

CVC COOLER

30 CVC line

CVC SEPARATOR
Design : 50 psig / 300 deg F
Operating : 5 psig / 227 deg F
LXH

I/P

PY
LSH
SOV

PI

CVC
SEPARATOR

LSL

LXL

LXLL

From casing wells

30GAF-3

30 ESD BFF

2 6

4GAF-2

4GAF-2

4GLF-2

4BAF-2

This by pass line is used to release


pressure from upstream to down
stream ESD

CVC PUMP

14 8

NOTES

REV

DESCRIPTION

BY

APPD

DATE

DWG No.
ESD Control System at CVC Area 6

Sheet
No.

Ref. DRWG.
Drawn

Date

Checked

Date

Approved

Date

Proj.
No.

CVC COOLER

Normal Condition
Vapor : 175,505 lb/hr
Liquid : 109,010 lb/hr
Temp. : 227 deg F
Pressure : 5 psig

LXH

I/P

PY
LSH

30 CVC line

CVC SEPARATOR
Design : 50 psig / 300 deg F
Operating : 5 psig / 227 deg F

SOV
PI

CVC
SEPARATOR

LSL

LXL

LXLL

30GAF-3

OPEN

OPEN

CLOSE

CVC PUMP

From casing wells


2 6

XGAF-2

30 ESD BFF

XGAF-2

CLOSE

CLOSE

XBAF-2

XGLF-2

CLOSE

CLOSE

This line is not used any more

14 8

NOTES

REV

DESCRIPTION

BY

APPD

DATE

DWG No.
ESD Control System at CVC Area 6

Sheet
No.

Ref. DRWG.
Drawn

Date

Checked

Date

Approved

Date

Proj.
No.

CVC COOLER

ESD Closed Condition


Built up pressure : 130 psig

30 CVC line

CVC SEPARATOR
Design : 50 psig / 300 deg F
Operating : 5 psig / 227 deg F
LXH

I/P

PY
LSH
SOV

PI

CVC
SEPARATOR

LSL

LXL

LXLL

OPEN

CVC PUMP

OPEN

2 6

CLOSE

XGAF-2

From casing wells

30GAF-3

30 ESD BFF

XGAF-2

OPEN

CLOSE

XBAF-2

XGLF-2

OPEN

OPEN

This by pass line is used to release


pressure from upstream to down
stream ESD

This line is not used any more

14 8

NOTES

REV

DESCRIPTION

BY

APPD

DATE

DWG No.
ESD Control System at CVC Area 6

Sheet
No.

Ref. DRWG.
Drawn

Date

Checked

Date

Approved

Date

Proj.
No.

You might also like