Hyundai SJP For Modification of Shut Down Console

The safe job plan outlines modifications to a shutdown console located at Berth 35 of Shuiaba Port. It involves replacing tiles, installing a switch, terminal block, and input module. Hazards include opening the wrong panel, hand injuries, damage to existing wiring and tiles, electric shock, and trip hazards. The plan specifies obtaining a safe work permit, coordinating with supervisors, checking for damage to tools, ensuring power is off, wearing protective equipment, and maintaining good housekeeping.

Uploaded by

arunmiranda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

Hyundai SJP For Modification of Shut Down Console

The safe job plan outlines modifications to a shutdown console located at Berth 35 of Shuiaba Port. It involves replacing tiles, installing a switch, terminal block, and input module. Hazards include opening the wrong panel, hand injuries, damage to existing wiring and tiles, electric shock, and trip hazards. The plan specifies obtaining a safe work permit, coordinating with supervisors, checking for damage to tools, ensuring power is off, wearing protective equipment, and maintaining good housekeeping.

Uploaded by

arunmiranda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Safe Job Plan

Unit : DO MTO
WO #
1
Issued by : Ariel Cantero
Equipment ID : Others
Location : Shuiaba Port Berth 35
E. Start : 01.08.2010

Priority : Urgent
Date

01.08.2010

Equipment Name :
L. Finish :

Scope of Work

: Modification of Shut Down Console

Job Scope

: Replacing tiles and install switch and install terminal block, input module

Sr.
No.
1
2

Execution by
Unit Contact
Contracts

: DO MTO Dept
: PAC
: HDEC

Steps

Hazards

Apply and obtain


SWP

-NA

Opening of
existing shut
down console

- Opening of wrong panel


- Hand injury

Hazard Control
- Fill in the STAC
- Work to be carried out on the project
will be in accordance with the SWP.
- Coordinate to Equate Supervisor /
operator prior to opening the panel.

Replacement of
tiles

- Damage to existing
wirings, tiles, etc.

Installation of
switch, terminal
block and input
module.

- Electric shock

House keeping

- Sharp edges

- Wear hand gloves


- Check hand tools, screw drivers, etc for
any signs of damages and tear.
- Only authorized persons to do the job.
- Ensure that adjacent tiles/lamps will not
be damage.
- Check power supply, continuity, etc.
using multi tester.
- Wear proper hand protections.
- Double check the location for the new
switch slots.
- Use leather gloves

Closing of
Permit

- Trip hazards
- NA

- Maintain good housekeeping


- NA

- Damage to existing
shut down console.