Rs Concrete Pumping Method Statement
Rs Concrete Pumping Method Statement
Page 1
Method Statement
Check wire safety lanyards are attached between end of boom (knuckle bend) and first flexible pipe.
Remove steel and rubber pipes (necessary to reach pour stating point) from bed of pump, and carry to layout position.
Layout necessary pipes in approximate assembly locations.
Join pipes together using couplings with rubber sealing rings.
Position any mobility pans under couplings (as necessary) to aid with hose movements during pour. Fix
suitable rope handling cord onto last section of pipework ready for work to commence.
Once all hoses have been connected, conduct a final walk-through check of all hoses and couplings starting
at point of pour and finishing at pump hopper.
Acquire 50kg of cement (client to supply) for every 20m of pipeline to be used, for pipe grouting, and
position by hopper prior to delivery lorry arrival.
Priming hoses
On arrival of 1st delivery lorry, mix up grout for lining pump hoses.
Empty a bag of cement into bucket containing approx 20lts of water and mix using a small paddle to
combine water and cement into a flowable grout.
Pour mixture into top of connecting knuckle on rear of hopper.
Repeat above steps for remaining cement.
During works
Reverse concrete delivery lorry up to hopper ready for discharge.
Ensure that hopper grid is in lowered position, prior to approach of mixer lorry, and at all times during
discharge and pumping operations.
Allow delivery vehicle to agitate mixer drum for a couple of minutes to avoid initial aggregate separation
on discharge.
Discharge concrete into hopper to check slump and suitability of concrete prior to starting to pump
through hoses.
Establish a suitable position of work to be able to see concrete discharge into hopper and point of
delivery from hose. This may involve the use of the remote control pack. Should a remote control pack be
used then any other operating controls, mounted on the pump body, must be disabled. Commence
pumping of concrete at a suitable rate to allow for site operators to spread concrete; and for lorry to
discharge concrete at a rate to keep hopper full.
Until concrete is flowing smoothly out of the end of the delivery hose, or when a blockage occurs in the
boom pipeline, all personnel should remain clear of the delivery hose and the placing boom. (The danger
zone is the area around the delivery hose in which the delivery hose can strike out. The diameter of the
zone is twice the length of the delivery hose).
If a blockage occurs during the pour, the concrete pump operator must stop pumping immediately and
instruct personnel to move to a safe position before attempting to remove the blockage.
If the concrete pump operator needs to open the delivery pipeline to clear a blockage, he must first release
the pressure inside the pipeline as much as possible, e.g. by reversing the pumping action. The pipeline
must be treated as being pressurised at all times. Appropriate and adequate eye protection must be worn
when opening the pipeline.
The hirer is to ensure that site personnel DO NOT under any circumstance open or attempt to open the
pipeline under pressure.
Use horn to signal to concrete lorry driver to stop discharge if the need arises to move hoses, disconnect
hoses, or to stop pour for any other reason.
Move boom as necessary whilst making suitable progress across the pour area.
Page 2
Method Statement
On completion of lorry discharge, lower boom to allow end of delivery hose to rest on floor.
At the end of discharge of each load remove any disconnected hoses and wash out immediately to avoid
concrete drying inside hoses and pipes.
If the concrete pump has to be left unattended, the operation of the boom and pump must be isolated.
Between concrete lorry deliveries
Agitate the contents of the hopper should the need arise long intervals between delivery vehicles, rise in
ambient temperature, etc.
On completion of works
Concrete in the hopper should be discharged until the only a small amount is left in the hopper (just
covering the ram inlet chambers)
The pressure in the pipeline should be released by retracting concrete into the hopper.
The access point in the rear knuckle (immediately after the hopper) should be opened, a wetted sponge
ball inserted into the line, and the access cover re-secured.
A cage, or protective back board, should be erected at the end of the delivery hose (to receive and confine
the cleaning ball).
The end of the discharge hose should be secured to avoid any whiplash.
All laying gang members should be moved away from the discharge hose, to a safe area.
The cleaning ball should then be advanced through the remaining pipes and hose, at reduced engine revs,
until it emerges at the discharge point.
The ball should then be recovered and thoroughly cleaned and washed off.
All hoses should be thoroughly washed out and stored on the lorry bed.
All couplings should be cleaned, washed and stored on the lorry bed.
The boom should then be retracted and stored on the purpose-made cradle on the lorry bed.
A suitable site for emptying the remaining concrete from the hopper should be identified, and the pump
moved to this location.
The retaining lever on the lower door of the hopper is then released, and the door swung away to allow
the remaining concrete to be discharged from the hopper.
Flush out all the intake rams, pistons and thoroughly rinse all concrete and grout from the hopper. Once
fully flushed, close the lower door of the hopper and secure with the retaining lever.
Ensure all pipes, clips, hoses, wash out lines sole plates are stowed in their respective areas on the lorry
bed, and ready for road travel.
Complete client receipt and present to clients representative.
Sign out (if required) from site and return to depot.
Signature______________________________ Name___________________________ Date___________
Site___________________________________________