TA15 - Scope of Work TA15 - Scope of Work TA15 - Scope of Work TA15 - Scope of Work

This work order provides details for opening, cleaning, and inspecting a caustic wash vapor scrubber (FL DESC: CAUSTIC WASH VAPOR SCRUBBER) located at FUNCT LOCATION: QC2-14-34-95-3401. The scope of work involves 31 tasks including pre-shutdown activities like submitting rigging and safety plans, shutdown activities like isolating and blinding the unit, removing internals for cleaning and inspection, carrying out any repairs recommended, and post-shutdown activities like reinstalling insulation and closing the work permit. The contractor and Qchem personnel are assigned responsibilities for various tasks. Equipment needs including scaffolding, cranes, insulation and testing/

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

TA15 - Scope of Work TA15 - Scope of Work TA15 - Scope of Work TA15 - Scope of Work

This work order provides details for opening, cleaning, and inspecting a caustic wash vapor scrubber (FL DESC: CAUSTIC WASH VAPOR SCRUBBER) located at FUNCT LOCATION: QC2-14-34-95-3401. The scope of work involves 31 tasks including pre-shutdown activities like submitting rigging and safety plans, shutdown activities like isolating and blinding the unit, removing internals for cleaning and inspection, carrying out any repairs recommended, and post-shutdown activities like reinstalling insulation and closing the work permit. The contractor and Qchem personnel are assigned responsibilities for various tasks. Equipment needs including scaffolding, cranes, insulation and testing/

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TA15 - Scope of work

TANO:
T15Q2N7080
NOTIFICATION: 10135791
WORK ORDER: 6007080

FUNCT LOCATION: QC2-14-34-95-3401


FL DESC:
CAUSTIC WASH VAPOR SCRUBBER
JOB DESCRIPTION: CLM-RBI-INT-EXT

Job Details: OPEN,CLEAN AND INSPECT

TaskID

Task

Notes

1-Preshutdown
1
Carry out JSA

Resp
Qchem/Contractor

Rigging plan and method statement submit by


Contractor /approved by Qchem

ID 750 & height 16650

Qchem/Contractor

Remove Insulation

Blinding/Inspection

Contractor

Blinding/Inspection

Contractor

2-Shutdown
3
Erect Scaffolding

N2 Purging

Qchem/Contractor

Verify LT&T & Obtain Permit for Blinding

Qchem/Contractor

Remove Required instrument connections

Qchem

Mechanical Isolation and Blinding

Remove pipe joint with safety shield

10

Open all Manway's and vent flanges

11

Provide Hole watch

Contractor

12

Arrange internal Lighting

Contractor

13

Install Air movers

Contractor

14

Erect Internal Scaffolding (As Required)

15

Remove Internal Tray and grid /packing

16

Internal Cleaning of Column

Column cleaning with hydrojetting gun

Contractor

17

Internal Inspection by Qchem

ASR as per ERG

Qchem/ERG

18

Carry out Internal Repairs as Required

As per ERG Recommendation

Contractor

19

Need to make required clamp/bots

ASR as per ERG

Contractor

Monday, March 03, 2014

As per Qchem Isolation/Blinding list-Use Crane As


Required

Contractor

Contractor

12"x150#; 12"x150#; 4"x150#; 4"x150#

Inspection/Cleaning

Contractor

Contractor

Contractor

Page 1 of 2

TaskID

20

Task
Replace missing clamp/bots and inspect the
tightness of other bolts

Notes

21

Reinstate the internal Tray & grid /packing

22

Final Inspection by Qchem

23

Remove Internal Scaffolding

Contractor

24

Boxup Manway & Vent flanges with new Gasket

Contractor

25

Carry out De-Blinding

Contractor

26

Refix removed instrument connections

Qchem

27

Leak testing with Nitrogen

28

boxup Pipe joint with new GSKT

ASR as per ERG

Resp
Contractor

Contractor

Contractor to assist Qchem

Contractor to assist Qchem

Qchem/Contractor

Qchem/Contractor

Contractor

3-Postshutdown
29 Reinstall Insulation

Contractor

30

Remove External Scaffolding

Contractor

31

Carry out House keeping

Contractor

32

Close Work permit

Qchem/Contractor

Other Services

Equipment

UOM Qty

Service

UMO Qty

Testing/Inspection UMO Qty

Forklift

Scafolding

Crane

Insulation

Boom Truck

Bolt torquing

Painting

Monday, March 03, 2014

Remarks