Construction of Multi-Purpose Building, Barangay Mahayahay, Iligan City
Construction of Multi-Purpose Building, Barangay Mahayahay, Iligan City
TABLE
OF
CONTENTS
ARCHITECTURAL
LAND USE AND ZONING:
A-1
PERSPECTIVE VIEW,
TABLE OF CONTENTS
LOCATION MAP
SITE DEVELOPMENT PLAN
A-2
A-3
ROOF PLAN
REFLECTED CEILING PLAN
LONGITUDINAL SECTION
SCHEDULE OF DOORS & WINDOWS
ARCHITECTURAL:
STRUCTURAL
THIS SITE
S-1
FOUNDATION PLAN
SECOND FLOOR FRAMING PLAN
COLUMN DETAIL
WALL FOOTING DETAIL
ZOCALO FOOTING DETAIL
SCHEDULE OF BEAMS
SCHEDULE OF SLABS
S-2
TRUSS DETAIL
EAVES DETAIL
ROOF FRAMING PLAN
ROOF BEAM LAYOUT PLAN
CONNECTION DETAIL
FASCIA FRAME DETAIL
DR. UY
HOSPITAL
STRUCTURAL:
ELECTRICAL:
UCCP NURSERY
KINDERGARTEN
SCHOOL
ILIGAN CITY
NATIONAL HIGH
SCHOOL
ILIGAN CITY
CENTRAL
SCHOOL
PLUMBING
P-1
ICNHS
-ANNEX
BRGY. MAHAYAHAY
CONSTRUCTION OF
MULTI-PURPOSE
BUILDING
P-2
BRGY. TAMBACAN
EXISTING
BRGY. HALL
ILIGAN
CAPITOL
COLLEGE
SANITARY:
COVERED COURT
MECHANICAL:
TAMBACAN
ELEM. SCHOOL
ELECTRICAL
E-1
THIS SITE
FIRE DEPT
NTS.
LOCATION MAP
SCALE
PROJECT NAME :
SHEET CONTENT:
CHECKED BY:
NTS.
SUBMITTED BY:
RECOMMENDING APPROVAL:
SHEET NO.
APPROVED BY:
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
PERSPECTIVE VIEW
TABLE OF CONTENTS
LOCATION PLAN
SITE DEVELOPMENT PLAN
A
ICEL URSULA L. IGLUPAS - VELARDE
ARCHITECT II
ROEL A. LLAUDER
ENGINEER II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
1
8
10.50
3.50
2.00
3.50
1.50
W
2
1.75
W
2
TOP OF ROOF
BEAM
1.75
1.00
3.50
HEAD, ARCHITECTURAL
SECTION
W
3
9
10
D
5
W
1
3.00
7
6
W
4
2ND FLR. FINISH
FLOOR LINE
1.80
11
12
13
7.60
W
6
8
DATE
3.00
1.20
14
DN
16
D
3
D
1
3.00
W
2
W
4
GROUND FINISH
FLOOR LINE
D
1
0.60
BRGY. CAPTAIN'S
OFFICE
3.00
EXISTING BRGY.
HALL
6.00
15
W
1
1.20
W
4
3.50
1/100 MTS.
3.50
10.50
TOP OF ROOF
BEAM
3.00
1.00
SCALE
7.60
W
3
W
2
W
2
3.50
3.50
1.50
W
2
1.75
1.75
W
5
W
5
10
PWD CR
FEMALE
PWD CR
MALE
D
4
D
2
W
2
3.00
2.00
D
2
8
W
5
W
5
GROUND FINISH
FLOOR LINE
0.60
2.00
3.00
10.50
3.50
D
4
6.00
1
UP
EXISTING BRGY.
HALL
1/100 MTS.
1.00
W
2
3.00
OFFICE AREA
W
4
D
1
3
TOP OF ROOF
BEAM
1.20
TOP OF ROOF
BEAM
1.00
1.00
UP
3.50
3.50
3.50
3.00
W
6
W
2
SESSION HALL
1/100 MTS.
3.00
3.00
SCALE
7.60
7.60
3.00
10.50
W
2
GROUND FINISH
FLOOR LINE
OFFICE AREA
0.60
0.60
GROUND FINISH
FLOOR LINE
SCALE
CROSS SECTION
1/100 MTS.
SCALE
PROJECT NAME :
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
LOCATION: BRGY. MAHAYAHAY, ILIGAN CITY
SHEET CONTENT:
GROUND FLOOR PLAN
SECOND FLOOR PLAN
FRONT ELEVATION
REAR ELEVATION
LEFT ELEVATION
RIGHT ELEVATION
CROSS SECTION
CHECKED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
1/100 MTS.
SHEET NO.
APPROVED BY:
A
ICEL URSULA L. IGLUPAS - VELARDE
ARCHITECT II
ROEL A. LLAUDER
ENGINEER II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
2
8
1.15
10.50
1.15
3.50
3.50
1.15
3.50
3.00
SLOPE
HEAD, ARCHITECTURAL
SECTION
W
2
1.15
W
3
5 SETS
ROOF PLAN
SCALE
1/100 MTS.
3.50
3.50
1.15
W
4
1 SET
3.50
10.50
DATE
3.00
SLOPE
6.00
EXISTING BRGY.
HALL
W
5
2 SETS
2 SETS
JALOUSIE WINDOW
WITH CLEAR GLASS
W
6
2 SETS
JALOUSIE WINDOW
WITH CLEAR GLASS
1.15
10.50
3.50
3.50
3.50
2.00
1.50
1.75
1.75
1.20
1
STAIRWELL
1
4"
1.80
3.00
3.00
6.00
EXISTING BRGY.
HALL
D
1
1 SET
D
2
2 SETS
D
4
2 SETS
D
5
W
1
1 SET
1 SET
1.20
3.50
3.50
3.50
SCALE
10.50
1/40 MTS.
1/100 MTS.
10.50
3.50
2.00
TOP OF ROOF
BEAM
3.50
1.50
1.75
1.75
1.00
3.50
AIR VENT
3.00
2.00
3.00
7.60
SESSION HALL
3.00
1
4 " THK. HARDILITE WITH METAL
FURRING CEILING JOIST spcd @
0.60m BOTHWAYS & HANGER spcd.
@ EVERY 1.20m BOTHWAYS
2
3.00
EXISTING BRGY.
HALL
GROUND FINISH
FLOOR LINE
OFFICE AREA
3.50
3.50
0.60
6.00
1.00
STAIRWELL
LONGITUDINAL SECTION
3.50
SCALE
1/100 MTS.
10.50
1/100 MTS.
PROJECT NAME :
SHEET CONTENT:
CHECKED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
SHEET NO.
APPROVED BY:
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
ROOF PLAN
REFLECTED CEILING PLAN
SCHEDULE OF DOORS &
WINDOWS
ARCHITECT II
ROEL A. LLAUDER
ENGINEER II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
3
8
0.30
10.50
3.50
1.50
1.75
1.75
ZOCALO
0.20
W1
W1
0.05M. THK
GRAVEL BED
ZOCALO
ZOCALO
3.50
FOUNDATION PLAN
SCALE
3.50
0.45
0.60
0.45
1.50
3.50
2B1
3.50
1.50
2GB1
2B1
EDGE SUPPORT
S2
BOT. BARS:
TOP BARS:
150mm O.C.
3.00
S1
2B2
2B2
2B2
2B2
STAIRWELL
PLAN
MID-SPAN
BOT. BARS:
150mm/300mm O.C.
1.50
C2F2
150mm O.C.
150mm/300mm O.C.
2GB1
NGL
2B3
2B3
S1
BOT. BARS:
TOP BARS:
C
BOT. BARS:
1/100 MTS.
0.05M. THK
GRAVEL BED
150mm O.C.
SECTION
EDGE SUPPORT
3.50
DEF. RSB
150mm O.C.
LONG SPAN
10.50
BOT. BARS:
150mm O.C.
S2
3.50
TOP BARS:
0.15
2B2
2B1
2B3
3.50
MID-SPAN
150mm O.C.
1.20
S1
TOP BARS:
2CB1
2B1
2CB1
2CB1
2B1
S1
S2
2B2
2B2
S2
3.00
EDGE SUPPORT
S2
EARTH FILL
1/100 MTS.
SHORT SPAN
0.40
6.00
2B1
spcd. @ 0.60m. OC
FFL
SCALE
2B1
EXISTING BRGY.
HALL
INSTALLED EVERY 3
PILES OF CHB
MATTING BARS @
EQUAL SPACED B.W.
C1F1
S1
TOP BARS:
S2
0.60
SHORT SPAN
0.60
2.00
0.45
3.50
MATTING BARS @
EQUAL SPACED B.W.
SCHEDULE OF SLAB
DESCRIPTION
10.50
0.60
0.30
1.20
0.30
1/10 MTS.
0.45
SCALE
0.30
1.20
DEF. MATTING
BARS @ EQUAL
SPACED B.W.
SECTION
3.50
10.50
1/100 MTS.
1.15
0.30
1.20
3
C1F1
ZOCALO
DEF. MATTING
BARS @ EQUAL
SPACED B.W.
SPACED 0.15m
W1
4" CHB
W1
1.50
C1F1
0.35
C1F1
SPACED @ 0.30m.
C2F2
0.15
C2F2
DATE
NGL
0.35
C2F2
3.00
EXISTING BRGY.
HALL
HEAD, STRUCTURAL
SECTION
NGL
0.30
6.00
1.00
W1
W1
FFL
EARTH FILL
NGL
0.20
W1
FFL
0.40
0.20
2.00
W1
4" CHB
W1
3.00
W1
4" CHB
1
C1F1
W1
APPROVED BY:
C1F1
W1
W1
0.40
C1F1
W1
5 @ 0.10m. , 3 @ 0.15m. ,
REST @ 0.25m O.C.
1.20
2.00
3.50
1.50
3.50
4" CHB
RSB SPACED
@ 0.30m.
0.30
MID-SPAN
TOP BARS:
150mm O.C.
BOT. BARS:
150mm O.C.
150mm O.C.
150mm O.C.
DEPTH
HANDRAIL
0.20m. O.C.
STAIR LANDING
PLAN
SPACED @ 0.30m.
4 @ 50mm, 5 @ 100mm
L/4
W1
SPAN
L/4
L/5
SCALE
1/10 MTS.
2
1
SCALE
20cm
1.40
0.40
SIDE ELEVATION
L/5
25cm
1/20 MTS.
F.L.
PROJECT NAME :
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
LOCATION: BRGY. MAHAYAHAY, ILIGAN CITY
SHEET CONTENT:
PREPARED BY:
FOUNDATION PLAN
2ND FLR FRAMING PLAN
COLUMN DETAIL
WALL FOOTING DETAIL
SCHEDULE OF BEAM
ZOCALO DETAIL
SCHEDULE OF SLAB
DESIGNED BY:
CHECKED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
SHEET NO.
APPROVED BY:
EFREN A. TULOD
ENGINEER II
ROEL A. LLAUDER
ENGINEER II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
4
8
10.50
3.50
3.50
2.00
1.15
3.50
1.50
10.50
3.50
1.75
1.15
3.50
3.50
1.75
1
4"
3B1
APPROVED BY:
1
1.20
1.15
1
STAIRWELL
3B3
3B3
3B1
3B1
6.00
HALF TRUSS 1
HALF TRUSS 1
HALF TRUSS 1
HALF TRUSS 1
6.00
EXISTING BRGY.
HALL
S1
BASE PLATE
SCALE
1/20 MTS.
1.15
3B3
3.50
DATE
3.00
3B1
S2
3.00
S2
3B2
S2
3GB1
3B2
3B2
3B2
3.00
3B1
HEAD, STRUCTURAL
SECTION
WITH LOCKNUT
AND WASHER
3B3
6.00
S2
3B1
3.00
1.80
S2
0.2
3.00
3GB1
S2
3B3
S2
3B2
3B2
3B2
3.00
3B3
3B1
3.50
3.50
10.50
1/100 MTS.
3.50
3.50
1.15
0.41
3.50
10.50
1.15
1/100 MTS.
SCREEN
(WIRE MESH)
1/4" HARDIFLEX
ROOF
EAVES
LINE
10.50
3.50
3.50
3.50
RB1
RB1
0.10
0.11
0.10
EXISTING BRGY.
HALL
3.50
RB1
3.50
3.50
3.00
RB1
RB1
1/40 MTS.
1" X 1"
WOODEN
STICK
1-2"x2"x 5mm
ANGLE BAR (TOP
CHORD)
ridge line
10.50
12mm X
3500mm
CEMENT
FACSIA
BOARD
1.50
0.60
0.30
0.30
top of beam
0.30
0.50
0.30
1.00
1/100 MTS.
1.00
SCALE
RB1
RB1
RB1
SCALE
RB1
1/5 MTS.
3.00
6.00
RB1
RB1
RB1
RB1
SCALE
0.30
ceiling line
DEPTH
BASE
1/20 MTS.
4 @ 50mm, 5 @ 100mm
and REST @ 200mm UP TO MIDSPAN
SCALE
1/10 MTS.
1/20 MTS.
PROJECT NAME :
SHEET CONTENT:
PREPARED BY:
ROOF PLAN
ROOF FRAMING PLAN
CONNECTION DETAIL
AIR VENT DETAILS
FASCIA FRAME DETAIL
EAVES DETAIL
DESIGNED BY:
CHECKED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
SHEET NO.
APPROVED BY:
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
LOCATION: BRGY. MAHAYAHAY, ILIGAN CITY
EFREN A. TULOD
ENGINEER II
ROEL A. LLAUDER
ENGINEER II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
5
8
0.10
WLR
WC
LAV
LAV
0.40
FD
WC
WWS
0.60
CO CO
SPS
IN
OUT
0.10
0.10
0.40
0.10
HEAD, SANITARY
SECTION
GRAVEL BASE
0.60
EXISTING BRGY.
HALL
EXISTING BRGY.
HALL
DATE
1.50
0.10
3.90
1.00
0.10
1.00
0.10
1/100 MTS.
1/100 MTS.
0.10
SCALE
0.10
1/20 MTS.
PLUMBING LEGEND
SV
MH
MH
MH
FD
FLOOR DRAIN
WC
WATER CLOSET
CO
CLEAN OUT
KS
KITCHEN SINK
LAV
LAVATORY
URI
URINALS
VTR
FAUCET
CB
TO DRAINAGE
CO
CO
CO
WWS
TO DRAINAGE
SPS
FD
50 x 50
MANHOLE
INLET
50 x 50
MANHOLE
50 x 50
MANHOLE
WC
URI
EXISTING BRGY.
HALL
0.10
FD
WC
OUTLET
SV
SEPTIC VAULT
MH
MANHOLE
WWS
SPS
WLR
0.50
0.50
0.50
50 x 50
MANHOLE
50 x 50
MANHOLE
50 x 50
MANHOLE
0.10
INLET
0.45
0.40
0.35
WATER LINE
SCALE
1.30
CB
GATE VALVE
1/100 MTS.
GV
GV
M
FROM CITY
WATER MAIN
LEACHING
CHAMBER 1
WLR
WC
WC
LEACHING
CHAMBER 2
2.30
2.50
CB
1.10
TO DRAINAGE
CB
PLUMBING SPECIFICATION
URI
EXISTING BRGY.
HALL
0.10
1
2
0.10
1.20
0.10
ALL SOIL , WASTE, AND VENT PIPES SHALL BE PVC SERIES 900
MATERIAL STANDARD ASTM D2466.
1.00
3.60
1.00
1/100 MTS.
PROJECT NAME :
SCALE
SHEET CONTENT:
PREPARED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
1/20 MTS.
SHEET NO.
APPROVED BY:
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
LOCATION: BRGY. MAHAYAHAY, ILIGAN CITY
P
ICEL URSULA L. IGLUPAS - VELARDE
ARCHITECT II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
6
8
HEAD, SANITARY
SECTION
DATE
1/60 MTS.
1/60 MTS.
PLUMBING LEGEND
FD
FLOOR DRAIN
WC
WATER CLOSET
CO
CLEAN OUT
LAV
LAVATORY
URI
URINALS
VTR
FAUCET
SV
SEPTIC VAULT
MH
MANHOLE
WWS
SPS
WLR
GV
1/60 MTS.
1/60 MTS.
PROJECT NAME :
SHEET CONTENT:
PREPARED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
SHEET NO.
APPROVED BY:
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
LOCATION: BRGY. MAHAYAHAY, ILIGAN CITY
PLUMBING LEGENDS
GROUND PLUMBING ISO
SECOND PLUMBING ISO
GROUND WATERLINE ISO
SECOND WATERLINE ISO
P
ICEL URSULA L. IGLUPAS - VELARDE
ARCHITECT II
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
7
8
ACU 2
HP
360W
360W
360W
APPROVED BY:
EXISTING BRGY.
HALL
ACU 2
HP
LO
360W
HEAD, ELECTRICAL
SECTION
PANEL
BOARD
360W
DATE
CO (CT)
1.10
KILOWATT
HOUR METER
0.30
SCALE
CO
GROUND FLOOR LINE
ELECTRICAL LEGENDS
ACU 2
HP
PB
RISER DIAGRAM
SCALE
360W
NTS.
ACU 2.0 HP
ACU
360W
CT
360W
EXISTING BRGY.
HALL
ACU 2
HP
FLOURESCENT WITH
REFLECTOR, 2-40 WATTS
ELECTRICAL SPECIFICATIONS
PL 25 W
PINLIGHT, 25 WATTS
360W
360W
2 - 40W
1/100 MTS.
S1
S2
S3
OR HIGHER.
PL 25 W
PL 25 W
2 - 40W
2 - 40W
S2
S2
SCALE
2 - 40W
2 - 40W
PANEL BOARD
CIRCUIT BREAKER
PL 25 W
2 - 40W
EXISTING BRGY.
HALL
S3
PL 25 W
1/100 MTS.
2 - 40W
S2
S2
CIRCUIT
NO.
1/100 MTS.
85 AT
15 AT
LIGHTING
C1
C2
20 AT
PB
CONVENIENCE
PL 25 W
15 AT
LIGHTING
20 AT
C3
C4
CONVENIENCE
PL 25 W
30 AT
2 - 40W
30 AT
PL 25 W
S2
ACU 2.0 HP
S1
C5
C6
ACU 2.0 HP
S1
30 AT
ACU 2.0 HP
30 AT
C7
C8
ACU 2.0 HP
30 AT
EXISTING BRGY.
HALL
SPARE
2 - 40W
2 - 40W
DESCRIPTION
S1
S2
S3
C.O.
PROTECTION
C1
LIGHTING
420 W
230 V
1.826 A
15 AT
1
2
C2
10
LIGHTING
555 W
230 V
2.413 A
15 AT
1
2
C3
CONVENIENCE
1800 W
230 V
7.826 A
20 AT
1
2
C4
CONVENIENCE
2160 W
230 V
9.391 A
20 AT
1
2
C5
2 HP ACU
3660 W
230 V
15.913 A
30 AT
1
2
C6
2 HP ACU
3660 W
230 V
15.913 A
30 AT
1
2
C7
2 HP ACU
3660 W
230 V
15.913 A
30 AT
1
2
C8
2 HP ACU
3660 W
230 V
15.913 A
30 AT
1
2
C9
SPARE
3660 W
230 V
15.913 A
30 AT
1
2
C9
2 - 40W
TOTAL
S2
SWITCHES
L.O.
29
23,315 W
101.021 A
S2
GROUND
PL 25 W
NTS.
1/100 MTS.
PROJECT NAME :
SHEET CONTENT:
PREPARED BY:
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
SHEET NO.
APPROVED BY:
CONSTRUCTION OF MULTI-PURPOSE
BUILDING, BARANGAY MAHAYAHAY,
ILIGAN CITY
LOCATION: BRGY. MAHAYAHAY, ILIGAN CITY
LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION
MUSTAPHA D. DERON
OIC - ASST. DISTRICT ENGINEER
8