M - HW - Pipework INSPECTION CHECKLIST

This document is a hot water plumbing inspection checklist for a project. It lists items that will be checked, including preparatory work like submitting materials and shop drawings, installation details like using the correct materials and pipe supports, and completion items like testing instruments. The checklist will be checked by the main contractor, verified by the client's consultant, and acknowledged by the ER/ERA to confirm everything conforms to specifications.

Uploaded by

mandelaria01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
293 views

M - HW - Pipework INSPECTION CHECKLIST

This document is a hot water plumbing inspection checklist for a project. It lists items that will be checked, including preparatory work like submitting materials and shop drawings, installation details like using the correct materials and pipe supports, and completion items like testing instruments. The checklist will be checked by the main contractor, verified by the client's consultant, and acknowledged by the ER/ERA to confirm everything conforms to specifications.

Uploaded by

mandelaria01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Contractor

Company
LOGO

Client :
HOT WATER PLUMBING INSPECTION CHECKLIST

Project Title :
Type of Work :
Location :

No.
A

Clients
Consultant

Remarks

Preparatory
Approved material submission inclusive of accessories

2.

Approved Method Statement

3.

Endorsed Construction

4.

Approved Shop Drawing

Installation

1.

Correct material and accessories

2.

Actual piping isometric and drain outlets against shop drawing

3.

Correct adequate pipe support

4.

Correct type of valve installed

5.

Correct schedule, sizes and type of piping

6.

7.

Adequate branch reinforcement, pipe support and


spacing/bedding as per specs

8.

Proper joint and watertight

9.

Vertical or horizontally aligned

10.

Correct sealant used as per specs

11.

Pressure test

Date :

Main
Contractor

Items To Be Checked

1.

RFWI No :

Ref. Drawing No :

Correct pipe fitting materials and its orientation installed

Completion

1.

Testing instrument calibrated (to show certificate) - to be


checked before testing

2.

No damages to the pipe installed.

Status of Inspection
We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document.
Checked By
Main-Contractor

Verified By
Clients Consultant

Acknowledged By
ER/ERA

Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable , X = Not Acceptable, - = Not Applicable