03 Survey Proposal Template
03 Survey Proposal Template
Survey Proposal
For
[Insert name of project]
Project Purpose
Insert
Description of Project
Insert (if applicable, include linear feet of route)
Scope of Project
The following Tasks/Subtasks are included in this proposal. The Surveyor is responsible for all
work of their subconsultants/subcontractors to meet the requirements of the Surveyors proposal.
The County requires the subconsultants/subcontractors proposals attached to the Surveyors
proposal.
Subtask 332
Boundary Survey for Acquisition Purposes
Provide a Boundary Survey for fee simple property and/or easements including all improvements
to the site for acquisition by Orange County and shall be prepared on an 8 x 11 sheet(s) with
a 1" x 3" blank space in upper right hand corner for recording in the Official Records of Orange
County. The Survey along with the Survey Map Report and/or legal description (see Example 1,
Boundary Survey for Acquisition) shall be submitted to use in parcel acquisitions and shall the
minimum requirements of the following:
A.
Minimum Technical Standards (MTS)
B.
Meet 2011 Minimum Standard Detail requirements for ALTA/ACSM Land Title
Surveys that does not include Table A items
C.
Meet Orange County Real Estate Management requirements
The Boundary Survey shall be certified to Orange County and First American Title Insurance
Company and use the MTS certification statement (see General Requirements) and the
ALTA/ACSM certification statement: This is to certify that this map or plat and the survey on
which it is based were made in accordance with the 2011 Minimum Standard Detail
Requirements for ALTA/ACSM Land Title Surveys, jointly established and adopted by ALTA and
NSPS, and includes no Table A items. The field work was completed on ___________.
The area of the parcel being surveyed is estimated to be insert acres.
Subtask 333
Wetlands Boundary Survey
The Surveyor shall subcontract or flag by in-house staff the wetland boundaries. Wetlands
delineation shall be determined using the Florida Unified Wetland Delineation Methodology
detailed in Chapter 62-340, of the Florida Administrative Code (F.A.C.) and according to the
U.S. Army Corps of Engineers Regional Supplement to the Corps of Engineers Wetland
Delineation Manual: Atlantic and Gulf Plain Region, most current version.
Provide a Boundary Survey for the Wetlands which shall be conducted in accordance with the
MTS. The wetland perimeter being surveyed is estimated to be insert linear feet.
Subtask 341
Right-of-Way Locations
Existing plats and land records containing the project right-of-ways shall be obtained and
reviewed. Sufficient monumentation will be recovered, field located and verified in order to
calculate and determine the right-of-way lines through the project area, as well as any platted
easements adjacent to the right-of-ways. The right-of-ways will be monumented at each block
corner, angle point, and the beginning and end of each curve. This task will require setting or
recovering approximately insert # of monuments. Found or set monuments for right-of-ways,
easements and lot lines shall be adequately depicted on the Topographic Survey. Sufficient
dimensions will be shown to support the location of the right-of-way lines relative to the survey
control baselines. Reference point details will be included in the CADD files provided.
Any major discrepancy between field monumentation and the right-of-way established by the
surveyor shall be noted on the survey and described within the Surveyors Report. The Surveyor
shall notify the Utilities Project Manager in writing the effect of the discrepancy.
Page 2 of 16
OCU CIP Survey Proposal Template
Subtask 351
Topographic Survey
Provide a Topographic Survey (see Example 3 Topographic Survey for Design) for [describe
the limits of the survey]. The survey shall be conducted in accordance with the MTS and meet
the requirements of the following Table 1 Minimum Survey Accuracies, whichever is more
stringent. The Surveyor shall prepare a Topographic Survey to provide Utilities with sufficient
data to design a proposed water, reuse, force and/or gravity main and/or pump station
constructed within existing and/or proposed right of way, easement or site. The construction
corridor referenced herein (limits of the Topographic Survey) is defined as the area to be
impacted by construction of the proposed improvements. Other factors outside the construction
corridor shall be surveyed to support ancillary activities, such as maintenance of traffic (MOT),
etc.
The horizontal and vertical spatial relationship of the above ground natural or man-made features
lying within the limits of survey defined will be established and mapped. Elevations shall be
taken along the route at 100 foot intervals and at apparent high and low points. Spot elevations
shall be taken as necessary to identify significant elevation changes occurring within the limits of
survey. Trees having a diameter of six (6) inches (measured three feet above the ground level)
lying within the limits of survey, shall be located. Monuments shall be set for bench marks
outside the limits of construction at intervals not to exceed 1,400 feet. The location of
benchmarks shall be coordinated with the design such that a minimum of one monumented
bench mark is located within the limits of each sheet of the construction plans. The Topographic
Survey shall be shown on 24 x 36 drawings at a scale of 1 = 20.
Page 3 of 16
OCU CIP Survey Proposal Template
Table 1
Minimum Survey Accuracies Per Asset
(Proposed and Existing Water, Wastewater, Reclaimed Water)
Horizontal
Accuracy
(feet)
0.01
Elevation
Accuracy
(feet)
0.01
N/A
Survey Monuments
0.1
0.1
0.1
0.1
0.1
N/A
N/A
N/A
N/A
N/A
Operating Nut
Valve Enclosure
Valve Enclosure
Register
Top of Meter Box
0.1
0.1
0.1
0.1
N/A
0.01
Manholes
Manhole
System Valves
Fittings and end of the
pipe if plugged.
Piping at 100 max
intervals
Restrained Pipe
Connections
Bore & Jack Casing
Directional Drilling
0.1
0.1
0.1
0.1
0.01
0.01
0.1
0.1
Top of well
Top of Clean-out
Top Center of Wet Well and Pipe
Inverts
Top Center of Cover and pipe inverts
Pipe Inverts
Operating Nut and Valve Body
Top of Fitting
0.1
0.1
Top of Pipe
0.1
0.1
0.1
0.1
N/A
0.01
0.1
0.1
0.1
0.1
Limits
Pipe Invert
Top of Casing at Limits of Casing
Top of connection fitting for the
beginning and end of HDPE or PVC
pipe
Top of pipe or top and center of
structure
Asset/Location
Baseline Control
Locational Accuracy
Property and Easement
Corners
Hydrants
Blow off Valves
Air Release Valves
Master Meters
Meter Box or Curb Stop
if box does not exist
Well
Lateral Clean-out
Pump Station
* Shall conform to the requirements of the Chapter 5J-17 Minimum Technical Standards,
FAC for a boundary survey and certified by a Surveyor.
Page 4 of 16
OCU CIP Survey Proposal Template
Subtask 352
Collection and Depiction of Existing Subsurface Utility Data
Surface appurtenances of utilities such as water meters, hydrants, valves, sanitary lateral cleanouts, utility poles, guy poles and anchors, junction boxes, and transformers shall be located
within the limits of the proposed topographic corridor. Utility poles with direction of overhead
lines shall be shown on the Topographic Survey. Sanitary and drainage structures and shall be
located with rim and invert elevations, size, and material. The size, material, and the direction of
sewer pipes shall be located. The Surveyor shall investigate any utility systems within or
crossing the Topographic Survey area.
Surveyor shall request utility locates from the Sunshine State One Call Service. Surveyor shall
submit verification that Sunshine One was notified as follows.
A.
Utilities listed with match design ticket provided by SSOCOF One Call.
B.
Copies of letters to utilities sent requesting markups
C.
Follow-up with utilities that did not respond by date requested verified
The Surveyor shall locate the marked utilities performed by the Utility Company representatives
and designate on the Topographic Survey the respective CI / ASCE 3802 Subsurface Utility
Quality Level B through D Indexes.
The Surveyor shall use ground penetrating radar and electronic line locating equipment to
determine the horizontal location of the existing utilities for Quality Level A utilities not under
roadway pavement. The utilities shall then be verified by some excavation means to verify the
type of utility and size and establish the vertical elevation of the utility. Surveyor has made an
allowance of insert # Verified Vertical and Horizontal (VVh) locations for Utility Quality Level
A and insert # ground penetrating radar cross sections at the following locations. See attached
drawing for the location of the GPR cross section locations.
A.
Ground penetrating radar shall be used for the full width of the right-of-way to locate all
utilities at minimum cross section intervals of 300 or before and after each road intersection
whichever is appropriate. VVhs shall be performed for all utilities located.
B.
Proposed pipe crossings of existing utilities
C.
Proposed pipe connections to existing utilities
All existing utilities shall be shown on the Topographic Survey in accordance with the CI/ASCE
38-02, ASCE Standard Guideline for the Collection and Depiction of Existing Subsurface Utility
Data. The date of the field work shall be depicted with the Subsurface Utility Data. All existing
utilities shall be identified with a utility quality level by the appropriate abbreviation and legend.
Show on all of the Topographic Survey drawings the following tables:
A.
Table 2 - CI / ASCE 3802 Subsurface Utility Quality Level Indexes
B.
Table 3 Legend and Abbreviations
C.
Table 4 Utility Quality Level A Horizontal and Vertical Example
D.
The drawing note: This drawing was prepared in conformance with ASCE standard
CE/ASCE 38-02 American Society of Civil Engineers Standard Guideline for the Collection
and Depiction of Existing Subsurface Utility Data.
.
Page 5 of 16
OCU CIP Survey Proposal Template
Table 2
CI / ASCE 3802 SUBSURFACE
UTILITY QUALITY LEVEL INDEXES
1. Quality Level A (QLA): Utility information which has been visually verified,
survey located (both horizontally and vertically) and accurately reduced onto
these drawings. This is typically shown as a HV verification excavation hole.
2. Quality Level B (QLB): Utility information derived by marking the
approximate surface horizontal location of utility using electronic methods.
Marking is subsequently field survey located and accurately reduced onto
these drawings.
3. Quality Level C (QLC): Utility information obtained as below for quality
level D, plotted to correlate with surface utility features which have been field
verified, survey located and accurately reduced onto these drawings. Included
in this category are aerial utility information and utility depictions, which in
the professional opinion of the subsurface utility engineer, represent the most
probable approximate horizontal location, type and / or existence of a utility.
4. Quality Level D (QLD): Utility information plotted on the drawing based
solely on record information, individual recollections or the existence of
utility service. It shall be noted that all information shown (other than at test
hole locations, see QLA above) with reference to a utilities size, capacity,
material composition, condition or service status shall be considered QLD
even though the utility may be plotted and labeled QLC or QLB.
Table 3
LEGEND AND ABBREVATIONS
=
=
=
=
=
=
--FM-=
--RWM-=
--UT-=
--OH TEL
=
--UFOC-=
--UE-=
--OH ELEC-- =
--GAS-=
QLB
QLC
QLD
--WM---SAN-CO
Quality Level B
Quality Level C
Quality Level D
Water Main
Sanitary Sewer
San. Clean-Out
WW Force Main
Reclaimed WM
Buried Telephone
Overhead Telephone
Buried Fiber Optic Cable
Buried Elect. Cable
Overhead Elect. Cable
Gas Main
Page 6 of 16
OCU CIP Survey Proposal Template
Table 4
UTILITY QUALITY LEVEL A
HORIZONTAL AND VERTICAL EXAMPLE
Horizontal Elevation Utility
Size &
Coordinates
(ft)
Owner Material
N 1363520
Florida
HV-1
110
2" galv
E 2221723
Gas
N 1363521
HV-2
108
AT&T 1" cable
E 2221724
N 1363520
HV-3
106
OCU
6" PVC
E 2221727
Survey field work for VVh locations was performed on date
Location ID
Subtask 361
Survey Control and Baselines
The Surveyor shall prepare a survey control drawing for the baseline horizontal and vertical
controls. Tie Orange County GIS control points to the baseline established along the route. The
baseline shall be referenced to permanent monumentation located outside the limits of
construction at the beginning and end of the route, at angle points, and at intervals not to exceed
1200 feet. A table shall provide state plane coordinates with elevations (x, y, z) at all changes in
baseline direction. Baseline turning points shall be labeled on the design drawings to identify
these points referenced in the survey control drawing table. The table shall include the type of
monument set. Iron pins are required when setting the baseline in easements or rights-of-way
without pavement. The survey control drawing shall state what horizontal and vertical datum
used and shall contain adequate graphical or written descriptions of the locations, construction
and marking of all marks used or set and shall explain methods employed in the survey and
adjustment. Two horizontal and vertical datum are required for horizontal and vertical controls.
The Surveyors name, registration number, and the date the survey was performed shall be
labeled on the survey control drawing.
A.
Baselines shall be parallel to the right-of-way and monumented at the beginning and end
of the project and at all changes in direction.
B.
Enough corners shall be found to determine the right-of-ways and these monuments shall
be indicated on the survey.
C.
GPS surveyed control baselines shall meet these post processed GPS survey
specifications using the kinematic survey method. Kinematic GPS surveys make use of two
or more GPS units. At least one GPS unit is set up over a known (reference) station and
remains stationary, while other (rover) GPS units are moved from station to station. These
surveys can be either continuous or stop and go. Stop and go station observation periods
are of short duration, typically under two minutes.
1. Minimum number of reference stations to control the project is 3rd order or better
2. Minimum number of check stations is 2
3. Maximum distance between the survey project boundary and the network reference
control stations is 6 miles.
4. Maximum PDOP during station occupation is 5.
5. Minimum observation time on station is 5 epochs
6. Minimum number of satellites observed simultaneously at all stations is 5 (100% of time)
Page 7 of 16
OCU CIP Survey Proposal Template
State plane coordinates with elevations (x, y, z) shall be provided for all of the items listed in
Table 1 Minimum Survey Accuracies Per Asset.
CAD Templates
If the Surveyor is contracted in-house design by Utilities, the Surveyor shall request a current
version of Utilities AutoCAD Template for preparing final documents. The digital file submitted
will match Orange County Utilities In-House CAD Standards including but not limited to: Linetype Files, Hatch Patterns, Symbol Library, Layer names, and the "stb" and "ctb" files.
Surveyor Map Report
Provide a Survey Map Report which will meet or exceed MTS. The survey report should, at the
very least, provide a clear, complete, and concise summery of work performed to prepare the
survey. The Report shall include, but not be limited to: Scope, project location, survey
equipment/software, survey data resources, field monumentation and any boundary
discrepancies, relative positional accuracy of measurements, flood statement, subsurface utility
locates, ownership and encumbrances, jurisdictional wetland boundaries, horizontal and vertical
control, accuracies obtained for the survey traverse and surveyor's certificate (see Example 2,
Survey Map Report).
In lieu of a Survey Map Report, information in the report shall be listed on the survey map as
Surveyors Notes.
MTS Certification Statement
All survey deliverables shall be certified to Orange County and use the following certification:
This Survey was performed in accordance with the Minimum Technical Standards as set forth
by the Florida Board of Professional Surveyors and Mappers, Chapter 5J-17, Florida
Administrative Code, Pursuant to Section 472.027, Florida Statutes.
Deliverables
A.
A single PDF file for data collected, control, title search of public records, last deeds
of records or other data utilized in the Survey work effort.
B.
Submit three (3) signed and sealed paper copies and electronic AutoCAD and PDF
files of the Topographic and Boundary Survey.
C.
Submit three (3) signed and sealed paper copies and electronic AutoCAD and PDF
files of the Boundary Survey.
D.
Submit four (4) signed and sealed paper copies of the Temporary Construction
Easement and an electronic PDF file.
E.
One (1) signed paper copy of MTS Survey Checklist completed.
F.
One (1) signed and sealed paper copy of Survey Map Report and electronic PDF file.
G.
(Applicable when Utilities in-house forces are performing the construction.) Submit (3)
copies signed and sealed paper copies of the As-built Survey
1.
Provide a complete set of scans signed and sealed by the Surveyor. Include a
TIFF image for each sheet and a complete set in a single Adobe PDF file
2.
Provide one hard copy and a CD of an Excel file of the As-built Coordinate Asset
Tables. The Surveyor shall provide a signed and sealed report as set forth in
paragraph 5J-17.051(3)(b)14.b., F.A.C.
3.
Provide the AutoCAD file in .dxf or .dwg format
Page 9 of 16
OCU CIP Survey Proposal Template
If the County has any review comments, the Surveyor shall address those comments and
resubmit.
SURVEY SCHEDULE
The work effort described herein will be completed in insert calendar days after purchase order
has been delivered. Exhibit A Survey Schedule which lists each task/subtask with milestones.
Assume a Utilities review time of one (1) week for each submittal.
COMPENSATION
Surveyor will perform the services described herein for a lump sum fee of insert $. A cost
breakdown is provided in Exhibit B, Survey Budget Detail. The fee is separated into tasks
described below.
Page 10 of 16
OCU CIP Survey Proposal Template
Page 12 of 16
OCU CIP Survey Proposal Template
Exhibit A
Survey Schedule
Page 13 of 16
OCU CIP Survey Proposal Template
Exhibit B
Budget Detail
Note: All subconsultants/subcontractors fees shall be included in the budget
detail sheets.
Page 14 of 16
OCU CIP Survey Proposal Template
(If applicable)
Insert
Subconsultant Proposal(s)
Note: The Surveyor is responsible for all work of their subconsultants to meet
the requirements of the Surveyors proposal. The County requires the
subconsultants/subcontractors proposals attached to the Surveyors proposal.
Page 15 of 16
OCU CIP Survey Proposal Template
Page 16 of 16
OCU CIP Survey Proposal Template