Road Management System Project (RMS) Deliverables

The key Road Management System Project deliverables include: - A study of skills and competencies needed for asset management and recommendations to meet future needs. - A review of the current road maintenance model and a recommendation for a best practice model. - A comprehensive capacity building and training plan for key staff. - An inventory and condition survey of all roads and a classification and numbering system. - Traffic surveys and a national traffic demand model. - An integrated RMS software and hardware solution implemented across client locations. - A multi-year asset management plan and 5-year work program for each region.

Uploaded by

equinox
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
196 views1 page

Road Management System Project (RMS) Deliverables

The key Road Management System Project deliverables include: - A study of skills and competencies needed for asset management and recommendations to meet future needs. - A review of the current road maintenance model and a recommendation for a best practice model. - A comprehensive capacity building and training plan for key staff. - An inventory and condition survey of all roads and a classification and numbering system. - Traffic surveys and a national traffic demand model. - An integrated RMS software and hardware solution implemented across client locations. - A multi-year asset management plan and 5-year work program for each region.

Uploaded by

equinox
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

The key Road Management System Project (RMS) deliverables will be as following:

A Sectorial Study of Skills and Competencies in Oman for Asset Management and

RMS Implementation and a strategy for meeting the future needs;


A Review of the current operating and procurement model for road maintenance and

recommendations on a preferred best practice model for MOTC;


The preparation and implementation of a Comprehensive Capacity Building and

Technology Transfer Plan including Mentoring and Training of key MOTC Staff in
Implementation Unit;
A populated database inventory and condition survey of all MOTC Road Network

Assets;
A road classification and numbering system and a location referencing system for the

Oman Road Network;


A survey of traffic demand, including axle load surveys, on the Oman road network and

the development of a National Traffic Demand Model to support the requirements of


the RMS;
A permanent network of counters for monitoring of long term traffic demands and trends

across the Oman road network;


An integrated RMS software and hardware solution implemented tested and validated to

clients satisfaction across all client locations;


The RMS to include a Pavement Management System, Bridge Management System,

Traffic Analysis Module and Strategic Planning Module as core elements in addition
to other modules and features;
A Multi Annual asset management plan for the maintenance of the MOTC Road Network

and a 5 year programme of works for each regional department;


Handover including a documentation record of all technical decision making information

requirements and all management and operational processes including the Road
Maintenance Manual, to be provided in both Arabic and English.
This list of key deliverables is for guidance only and is not exhaustive of all contract
deliverables.
The consultant shall complete the bill of quantities and schedule of services to include for all
deliverables required to complete the contract services.