L Attemptanyfourparts: (A) (B)
L Attemptanyfourparts: (A) (B)
com
uptuonline.com
Printed Pages : 2
EIVIT5O2
B.Tech.
I Total Marks : 50
Time:2HoursJ
Note
Attemptanyfourparts:
3x4=12
(a)
(b)
List the various methods of measurement of productivity and discuss any one
method.
(c)
(d)
(e)
(0
6x2=12
2, Attempt any two parts
' (a) Draw and discuss the usefulness of multiple activity charfwith an example.
:
(b)
What is work sampling ? And how it works in industry ? Discuss a few application
of this technique.
(c)
2178
uptuonline.com
http://www.UPTUonline.com
P'T'o'
uptuonline.com
3.
uptuonline.com
(a)
parts.
7 x 2 = 14
Draw the flow process chart of the following activities of a steno typist
Officer calls the steno typist into his chamber for dictation. The steno typist picks up
pad and pencil walks to the offer's room l0 metres away, waits for 3 minutes as the
officer is taking over the phone. After the phone call officer gives dictation for
10 minutes and steno takes it. She walks back to her place, prepares for typing,
(walks to the officer 3 minutes) types the letter (10 minutes) checks up and makes
the necessary correction (2 minutes), walks to the officer's room wait for 2 minutes
on'the letter
as he is preoccupied with other work, get the signature of the officer
(f minute; waltcs back to her seat, put the letter in the envelope (2 minutes) write the
address (3 minutes) put them in the out try and office copy in the office file.
(b)
List the different time recording techniques in time study and explain any
one
method.
(c)
4.
(a)
(b)
Standard Time
(c)
StandardAllowances
(d)
SIMO Chart
(e)
Travel Chart
2L78
uptuonline.com
http://www.UPTUonline.com
4x3=12