2015 - 09 Local
2015 - 09 Local
No.
Position
Firm
Calendar
Calendar
Schedule
Schedule
Tentative Schedule
B0
Co-Project Director
HDK
Toha Karta
B1
Co-Project Manager
HDK
Sudarminto
B2
Co-Site Manager
HDK
Eko Sutrisno /
Herry Suseno
Tentative Schedule
B3-1
Geologist C
HDK
Suyoko /
Wicaksono HS
Tentative Schedule
B3-2
Geologist D
HDK
B4-1
Geotechnical Engineer C
HDK
B4-2
Geotechnical Engineer D
HDK
Wiryono S.
B5
Seismic Engineer B
HDK
B6
Hydrologist B
HDK
B7-1
Hydraulic Engineer C
HDK
Catur Putrantono /
Indro Harry Djatmiko
B7-2
Hydraulic Engineer D
HDK
Mudjali, Ir.
11
12
2
1
3
2
4
3
5
4
6
5
7
6
8
7
9
8
10
9
Commencement of Services
Local Engineer
B8
2013
2012
IK
Actual Schedule
Tentative Schedule
Actual Schedule
Actual Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
11
10
11
12
12
12/17
Position
Local Engineer
Hydraulic Structures Engineer B
B8
Firm
Calendar
Calendar
Schedule
Schedule
IK
HDK
Suwahno / Sutanto
HDK
M. Arif Paputungan, ST /
Abdul Mukti
HDK
Gogma Pakpahan, ST
HDK
Fachrudin Leddy
HDK
P. Harianja /
Asmadi Suharno Bambang
HDK
Pieter Manurung
HDK
Ir. M. Zaini /
Hisbaruddin
B11
Structural Engineer B
Pump/Turbine Engineer B
11
12
2
1
3
2
4
3
5
4
6
5
7
6
8
7
9
8
10
9
Commencement of Services
IK
B9
2013
2012
B14
HDK
Alice Hutabarat
B15
Transmission Engineer B
HDK
Ir. Sardian /
Joko Siswandi
B16
HDK
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
11
10
11
12
12
12/17
Position
Firm
Calendar
Calendar
Schedule
Schedule
IK
Tri Rachmanto /
Benyamin Galla Rombe
Tentative Schedule
HDK
Mahyudi /
Yahya Purba / Suramto
Tentative Schedule
HDK
Tentative Schedule
HDK
Agus Sutiyanto
HDK
Kris Setianto /
Syaiful Mujahidin / Maurits Jaya
Suherman
Tentative Schedule
IK
Tentative Schedule
IK
HDK
HDK
Yayok Sutaryo
Cost Engineer B
B18
Contract Engineer B
B19
Environmental Engineer B
B21
B23
Waterways Engineer B
B24
Grouting Engineer B
B25
B26
11
12
2
1
3
2
4
3
5
4
6
5
7
6
8
7
9
8
10
9
Commencement of Services
Local Engineer
B17
2013
2012
IK
HDK
IK
Setyo Adiwidjono
Ir. Akhmad Masrukan
AM. Murtado
Actual Schedule
Actual Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Actual Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
11
10
11
12
12
12/17
Position
Local Engineer
B26 Mechanical Erection Supervisor B
Firm
Calendar
Calendar
Schedule
Schedule
IK
AM. Murtado
HDK
Ir. Hisbarudin
B28
HDK
B29
HDK
Imran Saing
B30
Laboratory Engineer B
HDK
Jaya Santoso, ST
B31
QA/QC Engineer B
HDK
Ikhsan Natsir, ST
HDK
HDK
B33
Claims Engineer B
HDK
B34
Home-Office Coordinator
HDK
Jerry Simanungkalit
Total
A
c
t
u
a
11
12
2
1
3
2
4
3
5
4
6
5
7
6
8
7
9
8
10
9
Commencement of Services
B27
Note:
2013
2012
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
Tentative Schedule
Actual Schedule
11
10
11
12
12
12/17
13
14
2015
10
11
15
16
17
18
19
20
21
22
23
12
24
1
25
2
26
3
27
4
28
5
29
6
30
7
31
2016
8
32
9
33
10
34
35
11
36
12
37
1
38
2
39
2017
10
11
12
40
41
42
43
44
45
46
47
48
49
50
51
52
53
5
54
6
55
7
56
2018
8
57
9
58
10
59
11
60
12
61
62
2
63
3
64
65
4
66
5
67
10
11
12
68
69
70
71
72
73
74
75
13
14
2015
10
11
15
16
17
18
19
20
21
22
23
12
24
1
25
2
26
3
27
4
28
5
29
6
30
7
31
2016
8
32
9
33
10
34
35
11
36
12
37
1
38
2
39
2017
10
11
12
40
41
42
43
44
45
46
47
48
49
50
51
52
53
5
54
6
55
7
56
2018
8
57
9
58
10
59
11
60
12
61
62
2
63
3
64
65
4
66
5
67
10
11
12
68
69
70
71
72
73
74
75
13
14
2015
10
11
15
16
17
18
19
20
21
22
23
12
24
1
25
2
26
3
27
4
28
5
29
6
30
7
31
2016
8
32
9
33
10
34
35
11
36
12
37
1
38
2
39
2017
10
11
12
40
41
42
43
44
45
46
47
48
49
50
51
52
53
5
54
6
55
7
56
2018
8
57
9
58
10
59
11
60
12
61
62
2
63
3
64
65
4
66
5
67
10
11
12
68
69
70
71
72
73
74
75
13
14
2015
10
11
15
16
17
18
19
20
21
22
23
12
24
1
25
2
26
3
27
4
28
5
29
6
30
7
31
2016
8
32
9
33
10
34
35
11
36
12
37
1
38
2
39
2017
10
11
12
40
41
42
43
44
45
46
47
48
49
50
51
52
53
5
54
6
55
7
56
" " : Marked are home office support provided on the basis free-of-charge by the Consultants.
No man-month is allocated and will be mobilized upon request as their input are required by the Project Manager.
2018
8
57
9
58
10
59
11
60
12
61
62
2
63
3
64
65
4
66
5
67
10
11
12
68
69
70
71
72
73
74
75
2018
1
75
76
77
78
79
80
No. of Trips
Home
Local Engineer
Field
Total
69.00
69.00
D
F
S
D
24.00
-
54.50
54.50
7.90
40.00
40.00
22.50
24.00
24.00
6.00
16.00
16.00
6.20
16.00
16.00
6.20
6.00
6.00
6.20
12.00
12.00
12.00
23.50
25.00
13.00
7.50
7.50
55.10
55.10
2018
1
75
76
77
78
79
80
Home
Local Engineer
Field
No. of Trips
Total
D
F
S
D
17.60
-
33.17
33.17
12.50
38.00
38.00
44.50
44.50
7.10
14.00
14.00
25.50
25.50
26.00
26.00
3.50
30.00
30.00
13.50
35.50
35.50
7.50
19.50
19.50
24.00
24.00
23.50
23.50
13.00
2018
1
75
76
77
78
79
80
No. of Trips
Home
Local Engineer
Field
Total
56.00
56.00
D
F
S
D
12.00
-
28.00
28.00
16.00
33.27
33.27
17.50
48.45
48.45
25.00
30.50
30.50
8.80
20.00
20.00
3.00
28.00
28.00
33.00
33.00
40.00
40.00
27.00
27.00
27.00
27.00
32.00
32.00
Manager.
2018
1
75
76
77
78
79
80
No. of Trips
Home
Local Engineer
Field
Total
30.00
30.00
24.00
24.00
18.00
18.00
43.00
43.00
46.00
46.00
16.00
16.00
16.00
16.00
D
F
S
D
2.30
-
18.00
18.00
1251.49
1516.29
Staff Input
No.
Name
Position
Firm
Calendar
Schedule
Assistance Engineer-1
11
12
1
1
2
2
3
3
4
4
5
5
6
6
2014
7
7
8
8
9
9
Commencement of Services
Sub Professional
S1
2013
2012
Sinotech
10
10
11
11
12
12
12/17
1
13
14
3
15
4
16
5
17
6
18
7
19
2015
8
20
21
9
22
10
23
11
24
12
25
1
26
2016
2017
10
11
12
10
11
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
12
49
50
51
52
53
54
6
55
7
56
2018
8
57
9
58
10
59
11
60
12
61
1
62
2
63
3
64
4
65
5
66
6
67
7
68
69
2019
8
9
70
10
71
11
72
73
12
74
2
75
3
76
4
77
5
78
79
80
Sub-Professional
Home
Field
Total
D
F
S
D
Tentative Schedule
49
49
Memorandum No. 2
50
50
Memorandum No. 3
S2
Assistance Engineer-2
TBN
Sinotech
59
59
Tentative Schedule
49
49
Memorandum No. 2
41
41
41
41
Memorandum No. 3
S3
Assistance Engineer-3
Suharyanto Apriono
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
58.5
58.5
67.5
67.5
Memorandum No. 3
S4
Assistance Engineer-4
Taat
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
55.5
55.5
Memorandum No. 3
S5
Assistance Engineer-5
TBN
Sinotech
64.5
64.5
Tentative Schedule
32
32
Memorandum No. 2
32
32
Memorandum No. 3
S6
Inspectors1-10 (Group-1)
TBN
Sinotech
32
32
Tentative Schedule
360
360
Memorandum No. 2
360
360
Memorandum No. 3
Inspectors11-20 (Group-2)
TBN
Sinotech
360
360
Tentative Schedule
460
460
Memorandum No. 2
460
460
Memorandum No. 3
Inspectors21-25 (Group-3)
TBN
Sinotech
460
460
Tentative Schedule
140
140
Memorandum No. 2
140
140
Memorandum No. 3
Inspectors26-28 (Group-4)
TBN
Sinotech
140
140
Tentative Schedule
66
66
Memorandum No. 2
66
66
Memorandum No. 3
Inspectors29-30 (Group-5)
TBN
Sinotech
66
66
Tentative Schedule
46
46
Memorandum No. 2
46
46
Memorandum No. 3
S7
Surveyor-1
TBN
Sinotech
46
46
Tentative Schedule
30
30
Memorandum No. 2
30
30
Memorandum No. 3
Surveyor-2
TBN
Sinotech
30
30
Tentative Schedule
30
30
Memorandum No. 2
30
30
Memorandum No. 3
Surveyor-3
TBN
Sinotech
30
30
Tentative Schedule
34
34
Memorandum No. 2
34
34
Memorandum No. 3
Surveyor-4
Siswoyo
Sinotech
34
34
Tentative Schedule
11
11
Memorandum No. 2
11
11
Memorandum No. 3
S8
Laboratory Technician-1
TBN
Sinotech
20
20
Tentative Schedule
43
43
Memorandum No. 2
43
43
Memorandum No. 3
Laboratory Technician-2
TBN
Sinotech
43
43
Tentative Schedule
43
43
Memorandum No. 2
43
43
Memorandum No. 3
Laboratory Technician-3
TBN
Sinotech
43
43
Tentative Schedule
43
43
Memorandum No. 2
43
43
Memorandum No. 3
Laboratory Technician-4
TBN
Sinotech
43
43
Tentative Schedule
31
31
Memorandum No. 2
31
31
Memorandum No. 3
Laboratory Technician-5
TBN
Sinotech
31
31
Tentative Schedule
31
31
Memorandum No. 2
31
31
Memorandum No. 3
Total
No. of Trips
31
31
1,641
1,641
Staff Input
No.
Name
Position
Firm
Calendar
Schedule
Support Staff
O-1
Office Manager
2013
2012
11
12
1
1
2
2
3
3
4
4
5
5
6
6
2014
7
7
8
8
9
9
Commencement of Services
Ratih Prasetyowati
Sinotech
10
10
11
11
12/17
12
12
1
13
14
3
15
4
16
5
17
6
18
7
19
2015
8
20
9
21
10
22
23
11
24
12
25
1
26
2
27
3
28
4
29
2016
30
31
32
33
34
10
35
2017
2018
11
12
10
11
12
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
10
59
11
60
12
61
1
62
2
63
3
64
4
65
5
66
6
67
7
68
8
69
9
70
10
71
11
72
12
73
1
74
2
75
3
76
4
77
5
78
6
79
7
80
Supporting Staff
Home
Field
Total
D
F
S
D
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-2
Bilingual Secretary-1
Nikita Natalia
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-3
Bilingual Secretary-2
Marilin H /
Suherlina A
Sinotech
Tentative Schedule
47
47
Memorandum No. 2
47
47
56
56
Memorandum No. 3
O-4
Accountant/Book Keeper
Erry Ariandi
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
57.5
57.5
66.5
66.5
Memorandum No. 3
O-5
CAD Operator-1
Zaki Mubarak /
Rahmad Hidayat
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-6
CAD Operator-2
Rizal Novik /
Rendi Nurhakim
Sinotech
Tentative Schedule
57
57
Memorandum No. 2
57
57
66
66
Memorandum No. 3
O-7
CAD Operator-3
TBN
Sinotech
Tentative Schedule
48
48
Memorandum No. 2
40
40
40
40
Memorandum No. 3
O-8
CAD Operator-4
TBN
Sinotech
Tentative Schedule
11
11
Memorandum No. 2
11
11
11
11
Memorandum No. 3
O-9
Computer Operator
Risa Amalia /
Endah Zuchria A
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-10
Computer/IT Specialist
Rr. Anisha /
Eka N P
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-11
Office Boy-1
Rahmat Sobar
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-12
Office Boy-2
Sinotech
Tentative Schedule
53
53
Memorandum No. 2
58
58
67
67
Memorandum No. 3
O-13
Office Boy-3
TBN
Sinotech
Tentative Schedule
46
87
Memorandum No. 2
41
41
41
41
Memorandum No. 3
O-14
Office Guard-1
Basuki
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-15
Office Guard-2
Parno
Sinotech
Tentative Schedule
59
59
Memorandum No. 2
59
59
68
68
Memorandum No. 3
O-16
Office Guard-3
TBN
Sinotech
Total
Tentative Schedule
46
46
Memorandum No. 2
46
46
46
46
1277.5
1277.5
Memorandum No. 3
No. of Trips