Perhitungan Bore Pile

The document calculates the bearing capacities of 8 piles based on their design parameters and soil properties. It determines the skin resistance and end bearing capacity for each pile, then calculates the ultimate and allowable bearing capacities. The ultimate capacity is the sum of the skin and end resistances, while the allowable capacity divides the ultimate by a factor of safety. Finally, it calculates the group efficiency and resulting group capacity of the 8 piles together.

Uploaded by

Fitri Yani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
152 views

Perhitungan Bore Pile

The document calculates the bearing capacities of 8 piles based on their design parameters and soil properties. It determines the skin resistance and end bearing capacity for each pile, then calculates the ultimate and allowable bearing capacities. The ultimate capacity is the sum of the skin and end resistances, while the allowable capacity divides the ultimate by a factor of safety. Finally, it calculates the group efficiency and resulting group capacity of the 8 piles together.

Uploaded by

Fitri Yani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

I.

Perhitungan
I.1 Desain Data

Parameter Bore Pile


Fs = 3
Parameter Tanah
NSPT Pile 1-8 = 17,5

Komponen Skin Resistance (Qs)


Qs adalah Daya dukung akibat adhesi tanah dengan tiang (skin resistance)
Qs1 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17.5
= 51,928Ton
Qs2 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17,5
= 51,928Ton
Qs3 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17,5
= 51,928Ton
Qs4 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17,5
= 51,928Ton
Qs5 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17,5
= 51,928Ton
Qs6 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17,5
= 51,928Ton
Qs7 = keliling lingkaran x tinggi x 0,2 x nilai NSPT
= x 1,35 x 3,5 x 0,2 x 17,5
= 51,928Ton
Qs8 = keliling lingkaran x tinggi x 0,2 x nilai NSPT

= x 1,35 x 3,5 x 0,2 x 17,5


= 51,928Ton
Qb total = 51,928 x 8 = 415,422 Ton

Komponen ujung fondasi (Qb)


Qb adalah Daya dukung oleh dasar tiang (base)
Qb1 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb2 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb3 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb4 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb5 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb6 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb7 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb8 = Luas Lingkaran x (375 + 10(N-15))
= 0,25 x x 1,352 x (375 + 10(17,5-15))
= 572,265Ton
Qb total = 572,265x 8 = 4578,12 Ton

efisiensi pile group (eg)


(n - 1)m + (m-1)n
eg = 1
90.m.n
= 1 - tan-1 (1350/3070) x

( 41 ) x 2+ ( 21 ) x 4
90 x 4 x 2

= 0,670

Daya dukung batas (ultimate) (Qu)

Qu1 = Qs1 + Qb1


= 51,928+ 572,265
= 624,19275 Ton
Qu2 = Qs2 + Qb2
= 51,928+ 572,265
= 624,19275 Ton
Qu3 = Qs3+ Qb3
= 51,928+ 572,265
= 624,19275 Ton
Qu4 = Qs4 + Qb4
= 51,928+ 572,265
= 624,19275 Ton
Qu5 = Qs5 + Qb5
= 51,928+ 572,265
= 624,19275 Ton
Qu6 = Qs6 + Qb6
= 51,928+ 572,265
= 624,19275 Ton
Qu7 = Qs7 + Qb7
= 51,928+ 572,265
= 624,19275 Ton

Qu8 = Qs8 + Qb8


= 51,928+ 572,265
= 624,19275 Ton
Daya dukung ijin (allowable) (Qa)
Qa1 = Qu/Fk
= 624,19275/3
=208,06425
Qa2 = Qu/Fk
= 624,19275/3
=208,06425
Qa3 = Qu/Fk
= 624,19275/3
=208,06425
Qa4 = Qu/Fk
= 624,19275/3
=208,06425
Qa5 = Qu/Fk

= 624,19275/3
=208,06425
Qa6 = Qu/Fk
= 624,19275/3
=208,06425
Qa7 = Qu/Fk
= 624,19275/3
=208,06425
Qa8 = Qu/Fk
= 624,19275/3
=208,06425
Daya dukung Pile Group
Qag pile (1-8) = eg . Qa
= 0,67 x 208,06425
= 139,403
Qag pile total = 139,403 x 8 =1115,224 Ton