Internal Project Progress Report: Mhivpl / PMF / XXX

This internal project progress report provides an update on the status of a project. It indicates that the project objectives, assumptions, and deliverables have not changed. While there are no major issues currently, the project may be impacted by external factors. The report notes that the approved budget is not expected to be overrun and projected savings should still be realized. An explanation is provided for any "yes" responses. The report also includes sections on achievements, change requests, risk analysis, planned activities, and project milestones.

Uploaded by

Anoop Sankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views2 pages

Internal Project Progress Report: Mhivpl / PMF / XXX

This internal project progress report provides an update on the status of a project. It indicates that the project objectives, assumptions, and deliverables have not changed. While there are no major issues currently, the project may be impacted by external factors. The report notes that the approved budget is not expected to be overrun and projected savings should still be realized. An explanation is provided for any "yes" responses. The report also includes sections on achievements, change requests, risk analysis, planned activities, and project milestones.

Uploaded by

Anoop Sankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Issue Date: 01 Jan 2014

Rev 0

MHIVPL / PMF / xxx

Internal Project Progress Report


Summary
Period:

To:

Report Date:

Project name:

Client:

Project Manager:

Project Start Date:


Expected Completion:
Project Status
Yes No Status Summary ( explain if "Yes" is checked)
Phase & Project Plan (General):
1. Have the objectives in the Phase or Project Plan changed?
2. Have the assumptions in the Phase or Project Plan changed?
3. Have the deliverables in the Phase or Project Plan changed?
4. Are there any major issues?
5. Is the project impacted by external factors?
Deliverables:
6. Will the deliverables fail to meet specifications?
7. Are there deliverables not envisaged earlier?
Activities / Effort
8. Are there any problems affecting the project team's ability to perform the work?
9. Does the actual time expended to date vary significantly ( > 10%) from the project plan?
Resourcing
10. Are there resourcing problems?
Schedule
11. Is the estimated schedule about to be missed?
Budget / Savings
12. Will the approved budget be overrun?
13. Will the projected savings not be realized?
Change Requests
14. Are there significant ( > 25%) changes to Scope requested?
Explanation of checked items:
For every item ticked "Yes", give a brief explanation.

MPG Hotels Infrastructure Ventures Pvt. Ltd.

Page 1 of 2

Issue Date: 01 Jan 2014


Rev 0

MHIVPL / PMF / xxx

Achievements
Major Activity

Status & Expectations

Change Request Analysis


Major Change Requested

Impact

Risk Analysis
Risk

Contingency

Major Activity

Expected Milestone/ Achievement

Planned Activities

Project Milestones
Project Milestones ( Consistent
with high level project plan
summary)

Completion Date

Reason for variance

Target
RevisedActual
(Baselin
e)

Issued By:

MPG Hotels Infrastructure Ventures Pvt. Ltd.

Page 2 of 2