CCI Valve Technology AB: Quality Control Plan

This document is a quality control plan for a dump tube being produced for Descon Engineering FZE for the Bhikki CCPP project. It outlines the inspection procedures and standards that will be followed during design, material selection, manufacturing, assembly, testing, packaging and shipping. Key points include: design and calculations will follow the applicable directive and standards, raw materials will undergo receiving inspection, welding will be qualified and inspected according to applicable standards, non-destructive testing including radiographic, ultrasonic and magnetic particle inspection will be performed according to control plans and applicable standards, final inspection will ensure compliance with orders, and packaging and shipping procedures will be followed. Customer notification is required 2 weeks prior to test dates.

Uploaded by

Humayun Nawaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views3 pages

CCI Valve Technology AB: Quality Control Plan

This document is a quality control plan for a dump tube being produced for Descon Engineering FZE for the Bhikki CCPP project. It outlines the inspection procedures and standards that will be followed during design, material selection, manufacturing, assembly, testing, packaging and shipping. Key points include: design and calculations will follow the applicable directive and standards, raw materials will undergo receiving inspection, welding will be qualified and inspected according to applicable standards, non-destructive testing including radiographic, ultrasonic and magnetic particle inspection will be performed according to control plans and applicable standards, final inspection will ensure compliance with orders, and packaging and shipping procedures will be followed. Customer notification is required 2 weeks prior to test dates.

Uploaded by

Humayun Nawaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

A

2009-04-02

1st Issue

HrM

REV

DATE

DESCRIPTION

SIGN

APPLICABLE FOR TAG.NO.:

CCI SERIAL NO.:

HP-DT

299356.40

LP-DT

299356.80

CCI Valve Technology AB


PREPARED BY

DATE

HrM

2009-04-02

CHECKED BY

DATE

DsE

2009-03-03

Quality Control Plan


DOCUMENT NUMBER:

QCP299356-2

Quality Control Plan


CCI ref.
Customer
Project
Product
Document:

Vo299356
Descon Engineering FZE
Bhikki CCPP / PO: 0002528
Dump Tube

Document No.
Revision:
Page

QCP299356-2
A
2 of 3

Inspection by:

I = Internal record
R = Record to customer
C = Certificate of Compliance
3.2/3.1/2.2 = According to EN 10204

1 = Authorized Inspector
2 = Buyers Inspect.
3 = Customer
* = Subsupplier

H = Hold point
W = Witness point
D = Review of documents

Document

Procedure / Standard

Process / Activity

Inspection by

CCI 1 2 3

1. Contract Review
1.1

Order handling

PL 010

2. Design activities

KO 001

2.1

Design & calculations

Design code / Directive 97/23/EC

EN 12516-2

2.2

Technical File

Directive 97/23/EC

KOI 090

2.3

Hazard Category

Directive 97/23/EC

2.4

Drawings for approval

3. Material
3.1

Pressurized materials

Mechanical properties / chemical analysis

EN

3.2

Order raw material

Receiving inspection

INI 050

4. Manufacturing

3.1
I

PR001

4.1

Machining

4.2

Welding

In-Process Inspection

PRI 070

I
I

Welding procedure qual.

EN 15614-1 / EN 288-3

4.3

Welders qualification

EN 287-1 / EN 1418

4.4

PWHT

WPS / PR 303

PRI 351 (EN 12517)

PRI 352 (EN 1712)

4.5
4.6
4.7

NDT

Weld joints

(Extend of testing according


RT examination
to "Controlplan NDT")
UT examination (on welds not accessible
for RT)

4.8

MT examination (on all welds)

PRI 353 (EN 1291)

4.9

NDT operator qualification

EN 473

5. Assembly / Testing
5.1

PR 100
Visual & dimensional
check

5.2

Painting and preservation

5.3

Document check

5,4

Final inspection

Complete Dump Tube

Certified drawing

Quality control plan

KM 050

Compliance with the order

6. Packaging

SK 020

7. Shipping

SK 010

Issue 0/2001-11-27

1 of 2

dok-36776_1510269_258.xls

Quality Control Plan


CCI ref.
Customer
Project
Product

Vo299356
Descon Engineering FZE
Bhikki CCPP / PO: 0002528
Dump Tube

Notes
Invite customer 2 weeks prior to test date(s).

Document No.
Revision:
Page

QCP299356-2
A
3 of 3