This document contains overcurrent protection settings for two pieces of equipment in the 220/33/11kV Zakher Grid substation: a 220kV bus coupler and a 120MVA transformer feeder. It provides the device names, manufacturer and model references, current transformer ratios, protection characteristics and settings, and time dial and time current curves showing the expected tripping times for various fault levels.

Uploaded by

joshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Case 1

This document contains overcurrent protection settings for two pieces of equipment in the 220/33/11kV Zakher Grid substation: a 220kV bus coupler and a 120MVA transformer feeder. It provides the device names, manufacturer and model references, current transformer ratios, protection characteristics and settings, and time dial and time current curves showing the expected tripping times for various fault levels.

Uploaded by

joshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Amps X 100 BB-1A (Nom. kV=220, Plot Ref.

kV=220)
.5

10

30

50

100

300

500

1K

3K

5K

1K

10K
1K

500

500

300

300

100

100

50

50

30

30

D12-RP - P
OC1
220kV Bus Coupler
ABB
REF 615
CT Ratio 3000:1
IEC - Normal Inverse
Pickup = 1.2 (0.3 - 5 xCT Sec)
Time Dial = 0.49
3x = 3.09 s, 5x = 2.1 s, 8x = 1.62 s

10

D05-RP - P
OC1

.5

.5

120MVA Transformer Feeder


ABB
REF615
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 0.8 (0.3 - 5 xCT Sec)
Time Dial = 0.31
3x = 1.95 s, 5x = 1.33 s, 8x = 1.02 s

.3

.1

.3

.1

.05

.05

.03

.03

.01
.5

10

30

50

100

300

500

1K

3K

Amps X 100 BB-1A (Nom. kV=220, Plot Ref. kV=220)


N7733 ZAKHER GRID
Project:
Location:
Contract:
Engineer:
Filename:

220/33/11kV Zakher Grid


Zakher Area of Al Ain
N7733
JM
C:\ETAP 1250\N7733\N7733.OTI

CASE-1.1
Date:
SN:
Rev:
Fault:
Circuit:

18-01-2016
LARSENTRN2
Base
Phase
120MVA T/F , 220kV B/C

5K

.01
10K

ETAP Star 12.5.0C