0% found this document useful (0 votes)
25 views

Projects Review Schedule

The document outlines the schedule for senior project reviews over six days of the week. It assigns batches of projects to specific days for review between 11AM and 12PM. Students must submit weekly progress reports signed by their guides, as any batch without a signed report will be disqualified from review. Each successful review carries marks.

Uploaded by

Satya Narayana
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Projects Review Schedule

The document outlines the schedule for senior project reviews over six days of the week. It assigns batches of projects to specific days for review between 11AM and 12PM. Students must submit weekly progress reports signed by their guides, as any batch without a signed report will be disqualified from review. Each successful review carries marks.

Uploaded by

Satya Narayana
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SeniorProjectsReviewSchedule(AY201516)

Batches17

:Monday

Batches814

:Tuesday

Batches1521

:Wednesday

Batches2228

:Thursday

Batches2835

:Friday

Batches3642

:Saturday

PRCwillreviewtheprojectsbetween11AMand12PMofthedesignateddays.
Students must submit weekly progress report duly signed by their respective
guides.Unsignedweeklyprogressreportbyabatchwilldisqualifythebatchfrom
review.
Eachsuccessfulreviewcarriesmarks.

You might also like