Introduction
The following Level 2, Fitness-For-Service assessment was carried out on A Plant Production Platf
1234, LP Separator, Nozzle: N-01, in accordance with API 579-1, Part 5, for Type 'B' pressurized c
subject to local metal loss resulting from internal corrosion, using the methods outlined in API 57
A region of local internal corrosion was found in the NPS-14, Schedule 140 nozzle during inspecti
pressure vessel (see inspection data).
The vessel was constructed to the ASME B&PV Code, Section VIII, Division 1, 1988 edition and is
fatigue service.
A Level 2 assessement was performed because the corrosion is at a major structural disconitnuit
nozzle.
The assessement was performed, to determine if the vessel is acceptable for continued operatio
Limit Analysis Method. This method is effective for evaluating a region of local metal loss at nozz
average thickness is used to represent the metal loss in the nozzle reinvorcement zone (see Figu
A.7).
The zone for thickness averaging has been calculated in accordance with API 579-1, Part 4, parag
details of which can be found in Appendix 1 of this report.
Summary
The area reinforcement calculation using the limit analysis approach is acceptable based on the
corroded dimension of the nozzle configuration and the stated design conditions.
The Level 2 Assessment criteria are satisfied.
The vessel is acceptable for continued operation.
ABC-1234
Vessel
A Plant
Equipment:
Date:
LP Separator
5th September 2014
Nomenclature
cn
LOSSn + FCAn.
cs
LOSSs + FCAs.
d1
d2
di
dm
nozzle or branch pipe mean diameter corrected for LOSS and FCA as applicable.
do
outside diameter of the nozzle corrected for LOSS and FCA as applicable.
D
Di
Do
Dm
vessel or run pipe mean diameter corrected for LOSS and FCA as applicable.
nominal inside shell diameter, not corrected for LOSS and FCA.
Lv
dimension to define the width of the reinforcement zone (see Figure 4.9).
LOSSn metal loss in the nozzle from prior periods of operation equal to the nominal (or furnished
available) minus the minimum measured thickness at the time of the inspection.
LOSSs metal loss in the shell from prior periods of operation equal to the nominal (or furnished th
available) minus the minimum measured thickness at the time of the inspection.
P
Rs
Sn
Sv
nozzle
tam
shell
tam
inside radius of small cylinder at a conical transition corrected for LOSS and FCA as applica
t
te
shell thickness.
tr
tn
furnished nozzle wall thickness (see Figures A.6 and A.7) For an integrally reinforced noz
tp
furnished wall thickness of the pipe section for an integrally reinforced nozzle (see Figure A.7).
tv
tstd
UTS
YS
yield stress.
ABC-1234
Vessel
A Plant
Equipment:
Date:
LP Separator
5th September 2014
Notes
YES or NO
Negligible
0.375
in
See Limitations (x
A Plant
Equipment:
Date:
ABC-1234
Vessel
LP Separator
5th September 2014
Inspection Data
A sketch of the nozzle and metal loss are shown below.
CL
1.25"
0.375"
Metal Loss
0.60"
The average nozzle thickness in the nozzle reinforcement
zone is 0.875 in.
The corrosion is uniform for all inspection planes.
A Level 2 assessment is performed as per API 579-1 paragragh 5.4.3.5 because the corrosion is a
discontinuity (a nozzle). The assessment procedure in Part 4, paragraph 4.4.3.3. is used.
From the inspection data:
0.875 in
nozzle
tam
0.600 in
tshell
am
Required
thickness of shell:
tr
0.320 in
Do Di 2t
60.250 in
D Di 2(LOSSs FCSs)
60.725 in
Dm
Do D
2
API 579-1 R
Dm
Do D
2
14.000 in
do
12.500 in
d do 2t
nozzle
am
dm
do d
2
2FCAn
13.250 in
A Plant
Equipment:
Date:
ABC-1234
Vessel
LP Separator
5th September 2014
(ii)
350 F
800 F
YES
YES
With, YS = minimum specified yield strength, and UTS = minimum specified ultimate tens
YS =
UTS =
38000 psi
70000 psi
YES
(iii)
YES
(iv)
with
0.2182
dm
Dm
if
dm
Dm
or if
dm
Dm
and
t
then
0.5
Dm
t
then
0.5
Dm
Dm
t
101.2083
FALSE
100
TRUE
250
YES
(v)
YES
(vi)
YES
with
cn LOSSn FCAn
0.125 in
YES
9.6673 in
(ix)
d1 =
d2 =
14.000 in
12.75 in
Required spacing =
40.125 in
d d
3 1 2
2
Does the spacing meet minimum
requirements:
YES
YES
Is vessel cylindrical:
YES
YES
If L <
L=
nozzle
0.5 dmtam
nozzle
m am
0.5 d t
Is L <
NO
nozzle
0.5 dmtam
tn (or tp) =
(x)
LP Separator
5th September 2014
(viii)
ABC-1234
Vessel
A Plant
Equipment:
Date:
1.250 in
0.875 tstd =
0.875 in
nozzle
0.5 dmtam
0.3281 in
Is tn > 0.875std
through an axial length of :
YES
1.7025 in
nozzle
0.5 dmtam
(xi)
YES
NO
ABC-1234
Vessel
A Plant
Equipment:
Date:
LP Separator
5th September 2014
Assessment Procedure
API 597-1
with,
cn LOSSn FCAn
nozzle
tam
cn
shell
tam
cs
0.750 in
0.475 in
shell
tam
cs
nozzle
tam
cn
0.125 in
1.579 in
1/2
tnozzle c
d
n
am
2 2 m
shall
1.25
t shell c
D
t
c
m
am
s
s
am
2.95
3/2
1/2
tr
d tnozzle c
am
n
1 m
nozzle
Dm tam cs
nozzle
A tam cn 228
tnozzle c
am
s
2
108 228
where,
d
m
Dm
Dm t cs
(A.110)
nozzle
tam
cn dm
B 155
shell
D
tam cs m
0.93 0.005
2
dm
228 152
Dm
tr
shell
c
am
s
(A.111)
d
m
Dm
Dm t cs
(A.112)
A = 162
nozzle
tam
cn
for
shall
am
t
B = 210
nozzle
tam
cn
for
shall
am
shall
am
t
B = 318
cs
nozzle
tam
cn
for
A = 54
cs
cs
nozzle
tam
cn
for
shall
am
cs
(A.113)
1.0
(A.114)
1.0
(A.115)
1.0
(A.116)
1.0
A Plant
Equipment:
Date:
ABC-1234
Vessel
LP Separator
5th September 2014
with
nozzle
tam
cn
shell
tam
cs
1.579 in
A=
54
B=
318
d
m
Dm
t c
D
m
s
3/2
d
2 2 m
Dm
tnozzle c
am
n
2.4671 in
1/2
t shall c 1.25
am
s
3/2
1/2
nozzle
dm
t
cn
am
nozzle
Dm tam cs
t shell c
s
2.95 am
2.7715
4.3721
nozzle
nozzle
1.0478
d
2
m
108 228
228 152
Dm
YES
nozzle
nozzle
d
108 2 228 m
228 152
Dm
tam cs
0.6358
YES
Analysis Results
The area reinforcement calculation using the limit analysis approach is acceptable based on the
dimension of the nozzle configuration and the stated design conditions.
The Level 2 Assessment criteria are satisfied.
The vessel is acceptable for continued operation.
API 579-1 Fitness-For Service Assessment
Plant ID
Equipment Number:
Equipment Type:
A Plant
Equipment:
Date:
ABC-1234
Vessel
LP Separator
5th September 2014
dm
Nozzle
Reinforcement
Zone
tr
n
tn
Vessel
tr
Ln
Metal Loss
Dm
Lv
Lv
Figure A.7, Nozzle Parameters (Integrally Reinforced Nozzle Neck) - Limit Load Ana
CL
dm
tr
n
tr
n
tp
Nozzle
Reinforcement
Zone
tn
L
Vessel
Ln
tr
Metal
Loss
Ln
Dm
Lv
Lv
Integrally Reinforced Nozzle
A Plant
Equipment:
Date:
ABC-1234
Vessel
LP Separator
5th September 2014
Appendix 2
Figure 4.9, Zone for Thickness Averaging - Nozzles and Fabricated Branch Connect
CL
Reinforciment
Zone
Nozzle
Reinforcing Pad
tn
Ln
te
di
tv
Lni
Lv
with
di =
14.000 in
Lv
Shell
tn =
tv =
te =
1.250 in
0.600 in
0.000 in
Lv = max [di, (di/2 + tn + tv)], thickness averaging zone in the horizontal direction.
Lno = min [2.5tv, (2.5tn + te)], thickness averaging zone in the vertical direction.
Lni = min [2.5tv, 2.5tn], thickness averaging zone in the vertical direction on the inside of the she
Lv =
Lno =
Lni =
14.0 in
1.5 in
1.5 in
Page 1
A Plant
5th September 2014
sment was carried out on A Plant Production Platform, ABCe with API 579-1, Part 5, for Type 'B' pressurized components
al corrosion, using the methods outlined in API 579-2, 5.6.
Page 2
A Plant
5th September 2014
res A.6 and A.7) For an integrally reinforced nozzle (see Figure A.7),
Page 3
A Plant
5th September 2014
Page 4
A Plant
5th September 2014
Page 5
A Plant
5th September 2014
Page 6
A Plant
5th September 2014
Page 7
A Plant
5th September 2014
API 597-1 Reference
(A.110)
(A.111)
(A.112)
(A.113)
(A.114)
(A.115)
(A.116)
Page 8
A Plant
5th September 2014
fied.
eration.
Page 9
A Plant
5th September 2014
Page 10
A Plant
5th September 2014
Appendix 2