0% found this document useful (0 votes)
153 views

Contract Change Order Format

This 3 sentence summary provides the key details from the contract change order document: The contract change order modifies an existing construction contract between a contractor and owner for a property located at a specified address. It requests specific price increases and decreases totaling a net change to the contract price. The owner or contractor requested the changes and the contract completion date is adjusted based on the impact of the changes.

Uploaded by

Congson Jeff
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views

Contract Change Order Format

This 3 sentence summary provides the key details from the contract change order document: The contract change order modifies an existing construction contract between a contractor and owner for a property located at a specified address. It requests specific price increases and decreases totaling a net change to the contract price. The owner or contractor requested the changes and the contract completion date is adjusted based on the impact of the changes.

Uploaded by

Congson Jeff
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Contract Date: ______________________

Project Manager: _________________________

Contract #: _________________________

Contractor License #: ___________________

CONTRACT CHANGE ORDER


Date: _______________________________

Change Order No: _________________________

Further to the contract dated the ______ day of ______________________, ___________ (the Contract)
between ______________________________ (the Contractor) and __________________________________
(the Owner) with a Contract Price of $_____________________ on the property located at
_________________________________________________________________________ (the Property) , the
Contract is hereby modified and amended as follows:
Change Requested:

Price
Increase/Decrease
$
$
$
$
$
$
$
$
$
$
$

Total Amount of Contract Price Increase/Decrease (including labor &


materials):

-2The above change(s) were requested by the owner/contractor (choose one) for the following reason(s):

The Contract completion date shall be extended/reduced (choose one) by _________ days as a result of this
Change Order. The Contract completion date is now the _____ day of _____________________, _________.

This Change Order is governed by the Contract and is incorporated therein.

Approved by Contractor and Owner this ______ day of ______________________, __________

Contractor

Print Name

Owner

Print Name

You might also like