0% found this document useful (0 votes)
15 views

Place Visited Start Date Start Time End Date End Time Total HR Purpose Bus/Train Amount

The document appears to be a log of work-related visits made between November 1st and 30th. It lists place visited, start and end dates and times, total hours, and purpose for each visit. Locations include Sattenapally, TummalaCheruvu, Gurajala, Macherla, Piduguralla, Jahnpahad, Rajupalem, and Vishnupuram. The purposes involved tasks like locator work, pipeline work, PE, splicing, cable pulling, and OTDR reports. The total hours worked was 2100 with additional auto and phone expenses. The log was prepared by P. Hemanthkumar and marked as restricted.

Uploaded by

Hemanth Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

Place Visited Start Date Start Time End Date End Time Total HR Purpose Bus/Train Amount

The document appears to be a log of work-related visits made between November 1st and 30th. It lists place visited, start and end dates and times, total hours, and purpose for each visit. Locations include Sattenapally, TummalaCheruvu, Gurajala, Macherla, Piduguralla, Jahnpahad, Rajupalem, and Vishnupuram. The purposes involved tasks like locator work, pipeline work, PE, splicing, cable pulling, and OTDR reports. The total hours worked was 2100 with additional auto and phone expenses. The log was prepared by P. Hemanthkumar and marked as restricted.

Uploaded by

Hemanth Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PLACE VISITED

START DATE

START TIME

END DATE

Sattenapally
Sattenapally
TummalaCheruvu- Sattenapally
Sattenapally
Gurajala
Macherla
TummalaCheruvu
Sattenapally
Macherla
***No WorK***
***No WorK***
Sattenapally PE
***No WorK***
Macherla-Peddavura
***No WorK***
Piduguralla
Piduguralla
Pidugurallla
***No WorK***
Macherla-Jahnpahad
Jahnpahad
Rajupalem
Vishnupuram(RTA Check Post)
Vishnupuram(RTA Check Post)
Sattenapally & Vishnupuram
***No WorK***
Gurajala-Jahnpahad
Piduguralla & Rentachintala
Chowtapapayapalem
Sattenapally

1/11/2015
2/11/2015
3/11/2015
4/11/2015
5/11/2015
6/11/2015
7/11/2015
8/11/2015
9/11/2015
10/11/2015
11/11/2015
12/11/2015
13/11/2015
14/11/2015
15/11/2015
16/11/2015
17/11/2015
18/15/2015
19/11/2015
20/11/2015
21/11/2015
22/11/2015
23/11/2015
24/11/2015
25/11/2015
26/11/2015
27/11/2015
28/11/2015
29/11/2015
30/11/2015

9:00AM
9:00AM
9:00AM
9:00AM
9:30AM
8:30AM
10:30AM
9:00AM
9:00AM

1/11/2015
2/11/2015
3/11/2015
4/11/2015
5/11/2015
6/11/2015
8/11/2015
8/11/2015
9/11/2015
10/11/2015
11/11/2015
13/11/2015
13/11/2015
14/11/2015
15/11/2015
16/11/2015
17/11/2015
19/15/2015
19/11/2015
20/11/2015
21/11/2015
22/11/2015
23/11/2015
24/11/2015
26/11/2015
26/11/2015
27/11/2015
28/11/2015
29/11/2015
30/11/2015

9:00AM
8:30AM
8:30AM
9:00AM
10:00PM
8:30AM
9:00AM
9:00AM
9:00AM
9:00AM
9:00AM
9:00AM
9:00AM
9:30AM
8:30AM

END TIME TOTAL HR

BUS/TRAIN

7:00PM
6:00PM
10:00PM
6:30PM
6:00PM
5:00PM
7:30AM
6:30PM
5:00PM

75
75
150
75
75
75
150
75
75

Locator at Sattenapally for reliance work


Sattenapally & Tummala Cheruvu Work
Tummalacheruvu work & Sattenapally Cut(vennadevi)
Locator at Sattenapally for reliance work
Gurajala water pipeline work
Locator at macherla defence work
PE at tummala cheruvu
Sattenapally Work
Locator at mahcerla

7:00AM

150

Anupalem JCB work & Sattenapally PE

5:30PM

75

Locator at Peddavura & Macherla

5:00PM
5:30PM
7:00AM

75
75
75

Cable Cut at Piduguralla


Cable Pulling at piduguralla
PE at Piduguralla

7:00PM
5:00PM
5:00PM
6:00PM
6:00PM
5:00AM

75
Macherla Locator, cable cut at vishnupuram n jahnpahad
75
Jahnpahad 48 Splicing & Chamber work
75
Chambers Work at Piduguralla & Rajupalem
75
Cable Pulling Work at RTA Check Post
75
Cable Pulling Work at RTA Check Post
150
48 Splicing at Vennadevi & OTDR reports at Sattenapally ,PE at Vishnupuram

6:00PM
6:00PM
5:30PM
6:30PM

75
75
75
75

TOTAL HR(DA)
Bus bill total
Auto BILL
Phone Bill
TOTAL
PREPARED BY
P.HEMANTHKUMAR

PURPOSE

OTDR reports at Srinagar Jahnpahad Gurajala


Piduguralla OTDR &rentachintala Chambers
Cable cut b/w Piduguralla - Sattenapally
Locator at Sattenapally for reliance trench work

2100
0
200
250

2550
APPROVED BY

Restricted

AMOUNT

AUTHORIZED BY

You might also like