Office Move Plan

This Gantt chart outlines the tasks and timeline for remodeling and moving the office space of a company called PE - Working with Reports over 106.5 days from February 1st to June 28th, 2016. The project includes planning phases, remodeling the existing space which involves demolition, construction and installation of walls, electrical, data lines, doors and fixtures over 42.5 days. It then includes a 14 day moving phase to move office and server room equipment and furniture to the remodeled space and testing systems. The chart lists 42 tasks and provides details on task durations, dependencies and resource assignments to complete the project.

Uploaded by

haymanezzeldin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views10 pages

Office Move Plan

This Gantt chart outlines the tasks and timeline for remodeling and moving the office space of a company called PE - Working with Reports over 106.5 days from February 1st to June 28th, 2016. The project includes planning phases, remodeling the existing space which involves demolition, construction and installation of walls, electrical, data lines, doors and fixtures over 42.5 days. It then includes a 14 day moving phase to move office and server room equipment and furniture to the remodeled space and testing systems. The chart lists 42 tasks and provides details on task durations, dependencies and resource assignments to complete the project.

Uploaded by

haymanezzeldin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

ID

Task
Mode
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Task Name

Duration

Start
Jan 24, '16 Finish
S

Jan 31, '16


S M T

Feb 7, '16
S M T

PE - Working with Reports 2013


106.5 daysMon 2/1/16Tue 6/28/16
Planning
47 days
Write proposal
1.5 days
Hire architect
2 days
Locate new site
10 days
Present proposal
4 days
Corporate approval
1 day
Negotiate new lease
4 days
Finalize drawings
10 days
Select subcontractors
10 days
Hire mover
3 days
Submit drawings
8 days
Permits received
0 days
Planning Phase Complete 0 days
Remodeling
42.5 days
Demolition of existing space3 days
Frame interior walls
4 days
Install electrical
6.5 days
Install voice and data lines 3 days
Finish walls
10 days
Install doors and hardware 3 days
Paint
4 days
Install carpet: office space 5 days
Install vinyl: server room 3 days

Project: PE - Working with Report


Date: Sat 2/20/16

Mon 2/1/16 Tue 4/5/16


Mon 2/1/16 Tue 2/2/16
Mon 2/1/16 Tue 2/2/16
Wed 2/3/16 Tue 2/16/16
Wed 2/17/16Mon 2/22/16
Tue 2/23/16 Tue 2/23/16
Wed 2/24/16Mon 2/29/16
Tue 3/1/16 Mon 3/14/16
Fri 3/11/16 Thu 3/24/16
Tue 3/22/16 Thu 3/24/16
Fri 3/25/16 Tue 4/5/16
Tue 4/5/16 Tue 4/5/16
Tue 4/5/16 Tue 4/5/16
Mon 4/11/16Wed 6/8/16
Mon 4/11/16Wed 4/13/16
Thu 4/14/16 Tue 4/19/16
Fri 4/15/16 Mon 4/25/16
Mon 4/25/16Thu 4/28/16
Thu 4/28/16 Thu 5/12/16
Tue 5/10/16 Fri 5/13/16
Fri 5/13/16 Thu 5/19/16
Fri 5/13/16 Fri 5/20/16
Fri 5/20/16 Wed 5/25/16

Sandra Westring,John Benoy

Br

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 1

ID

Task
Mode
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Task Name

Duration

Start
Jan 24, '16 Finish
S

Final trim and fixtures


5 days
Test systems
2 days
Touch-up
3 days
Remodeling Phase Complete0 days
Moving
14 days
Office Space
8.5 days
Disconnect
2 days
computers/equip.
Disassemble furniture
2 days
Move
4 hrs
furniture/equip./boxes
Reassemble furniture
2 days
Reconnect
2 days
computers/equip.
Office Space Moving
0 days
Phase Complete
Server Room
5.5 days
Disconnect server
2 days
Move server
4 hrs
Reconnect server
2 days
Test server
1 day
Server Room Moving
0 days
Phase Complete
Project Complete
0 days

Project: PE - Working with Report


Date: Sat 2/20/16

Jan 31, '16


S M T

Feb 7, '16
S M T

Wed 5/25/16Wed 6/1/16


Wed 6/1/16 Fri 6/3/16
Fri 6/3/16 Wed 6/8/16
Wed 6/8/16 Wed 6/8/16
Wed 6/8/16 Tue 6/28/16
Wed 6/8/16 Mon 6/20/16
Wed 6/8/16 Fri 6/10/16
Fri 6/10/16 Tue 6/14/16
Tue 6/14/16 Tue 6/14/16
Wed 6/15/16Thu 6/16/16
Fri 6/17/16 Mon 6/20/16
Mon
Mon 6/20/16
6/20/16
Tue 6/21/16 Tue 6/28/16
Tue 6/21/16 Wed 6/22/16
Thu 6/23/16 Thu 6/23/16
Thu 6/23/16 Mon 6/27/16
Mon 6/27/16Tue 6/28/16
Tue 6/28/16 Tue 6/28/16
Tue 6/28/16 Tue 6/28/16

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 2

Feb 14, '16


S M T

Feb 21, '16


S M T

Feb 28, '16


S M T

Mar 6, '16
S M T

Mar 13, '16


S M T

Ron Berglund[50%],Thomas Peterson,Jennifer McGill


John Smith[50%],Jennifer McGill[50%]
Brian Sampson,John Smith
Brian Sampson,John Smith
Brian Sampson

El

Project: PE - Working with Report


Date: Sat 2/20/16

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 3

Feb 14, '16


S M T

Project: PE - Working with Report


Date: Sat 2/20/16

Feb 21, '16


S M T

Feb 28, '16


S M T

Mar 6, '16
S M T

Mar 13, '16


S M T

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 4

Mar 20, '16


S M T

Mar 27, '16


S M T

Apr 3, '16
S M T

Apr 10, '16


S M T

Apr 17, '16


S M T

Apr 24, '16


S M

JoAnn Feith,Brian Sampson


Jennifer McGill
John Benoy
4/5
4/5
Carpenters
Carpenters

Ele

Project: PE - Working with Report


Date: Sat 2/20/16

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 5

Mar 20, '16


S M T

Project: PE - Working with Report


Date: Sat 2/20/16

Mar 27, '16


S M T

Apr 3, '16
S M T

Apr 10, '16


S M T

Apr 17, '16


S M T

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 6

Apr 24, '16


S M
Ca

Apr 24, '16


M T

May 1, '16
S M T

May 8, '16
S M T

May 15, '16


S M T

May 22, '16


S M T

Electricians
Data[50%],Electricians[50%]
Carpenters
Carpenters
Paint[50 Gallon],Painters
Carpenters
Carpenters

Project: PE - Working with Report


Date: Sat 2/20/16

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 7

May 29, '16


S M T

Apr 24, '16


M T

May 1, '16
S M T

Project: PE - Working with Report


Date: Sat 2/20/16

May 8, '16
S M T

May 15, '16


S M T

May 22, '16


S M T

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 8

May 29, '16


S M T

ay 29, '16
T

Jun 5, '16
S M T

Project: PE - Working with Report


Date: Sat 2/20/16

Jun 12, '16


S M T

Jun 19, '16


S M T

Jun 26, '16


S M T

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 9

Jul 3, '16
S M T

ay 29, '16
T

T
F
S
Carpenters
Data

Jun 5, '16
S M T

Jun 12, '16


S M T

Jun 19, '16


S M T

Jun 26, '16


S M T

Carpenters[50%],Painters[50%]
6/8

Data
Movers
Travel[$1,500.00],Movers
Movers
Data
6/20

Data
Travel[$750.00],John Benoy,John Smith
Data
Data
6/28
6/28

Project: PE - Working with Report


Date: Sat 2/20/16

Task

Inactive Task

Start-only

Split

Inactive Milestone

Finish-only

Milestone

Inactive Summary

Deadline

Summary

Manual Task

Progress

Project Summary

Duration-only

Manual Progress

External Tasks

Manual Summary Rollup

External Milestone

Manual Summary
Page 10

Jul 3, '16
S M T

You might also like