The project implementation committee meeting discussed providing design details from HCC to CRN, including cooling tower drawings, chiller and pump equipment drawings, mechanical pump installation drawings, substation trench and equipment dimension details, and DG set equipment dimensions and weight information.

Uploaded by

rameshav
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Drawings List

The project implementation committee meeting discussed providing design details from HCC to CRN, including cooling tower drawings, chiller and pump equipment drawings, mechanical pump installation drawings, substation trench and equipment dimension details, and DG set equipment dimensions and weight information.

Uploaded by

rameshav
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

During PIC meeting for finalising the structural Designs M/s.

CRN wante
1 Cooling Tower -

Chillers and Pump equipments OEM drawings and other de

2 Mechanical pumps installation drawings and details 3 Sub station - trenches - equipment dimensions etc.
4 DG set - Equipments

gns M/s. CRN wanted the following Details from M/s. HCC