The project implementation committee meeting discussed providing design details from HCC to CRN, including cooling tower drawings, chiller and pump equipment drawings, mechanical pump installation drawings, substation trench and equipment dimension details, and DG set equipment dimensions and weight information.
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
36 views
Drawings List
The project implementation committee meeting discussed providing design details from HCC to CRN, including cooling tower drawings, chiller and pump equipment drawings, mechanical pump installation drawings, substation trench and equipment dimension details, and DG set equipment dimensions and weight information.