WBS

This document outlines the work breakdown structure for a project with the code LIS-02. It details the project implementation and execution which is broken down into phases including procurement, site preparations, execution by drive, substantial completion and maintenance period. The execution drive is further broken down for each section including works like temporary works, pipe jacking, manholes etc.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views

WBS

This document outlines the work breakdown structure for a project with the code LIS-02. It details the project implementation and execution which is broken down into phases including procurement, site preparations, execution by drive, substantial completion and maintenance period. The execution drive is further broken down for each section including works like temporary works, pipe jacking, manholes etc.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LIS - 02

PACKAGE LIS-02
IMPLEMENTATION
0

LIS - 02.1
GENERAL

LIS - 02.2
PROCUREMENT-GENERAL
0

LIS - 02.3
EXECUTION

LIS - 02.1.1
CONTRACTUAL
MILESTONES

LIS - 02.2.1
MATERIALS
0

LIS - 02.1.2
SITE PREPRATIONS
& UTILITY

LIS - 02.4
SUBSTANTIAL
COMPLETION
0

LIS - 02.3.1
EXECUTION-GENERAL
0

LIS - 02.1.3
INTERFACE ISSUES

LIS - 02.2.3
SUB CONTRACTORS
0

LIS - 02.3.1.2
SURVEY WORKS
AND

LIS - 02.1.4
PERMITTING &
APPROVALS
0

LIS - 02.2.3.1
GEOTECHNICAL
INVESTIGATION

LIS - 02.3.1.3
DESIGN CRITERIA &
OTHER GENERAL
0

LIS - 02.1.5
OFFICES &
TEMPORARY
0
LIS - 02.1.6
INSURANCES
0

LIS - 02.2.3.2
PRE & POST SURVEY
WORKS
0

LIS - 02.3.2
DRIVE 01-ALL LINES
UPSTREAM OF SH 32
0

LIS - 02.2.3.4
UTILITY DIVERSION
WORKS

LIS - 02.2.3.5
TEMPORARY
WORKS

LIS - 02.3.2.3
MANHOLE

LIS - 02.1.9
METHOD
STATEMENTS
0

LIS - 02.2.4
PRECAST
SEGMENTS
0

LIS - 02.1.10
OVERALL TESTING
AND

LIS - 02.3.3
DRIVE 02-FROM SH
32 TO SH 21
0

0
LIS - 02.1.11
OTHER
CONTRACTUAL

LIS - 02.3.3.1
TEMPORARY WORK
SHAFTS
0

LIS - 02.3.3.2
PIPE JACKING
0
LIS - 02.3.3.3
MANHOLE
0
LIS - 02.3.4
DRIVE 03-FROM SH
21 TO SH 11
0

LIS - 02.3.4.1
TEMPORARY WORK
SHAFTS
0
LIS - 02.3.4.2
PIPE JACKING
0
LIS - 02.3.4.3
MANHOLE
0
LIS - 02.3.5
DRIVE 04-FROM SH
11 TO WS 07 & SH
0

LIS - 02.3.5.1
TEMPORARY WORK
SHAFTS
0
LIS - 02.3.5.2
PIPE JACKING
0
LIS - 02.3.5.3
MANHOLE
0

WBS Code
WBS Name
At Completion Labor
Units

LIS - 02.4.3
PERMANENT ROUTE
MARKER
0
LIS - 02.4.4
FLOW METER
INSTALLATION

LIS - 02.4.5
SNAGLIST
CLEARENCE

LIS - 02.4.6
AS BUILT DRAWING

LIS - 02.3.2.2
PIPE JACKING

LIS - 02.1.8
PROJECT
ASSURANCES

LIS - 02.3.2.1
TEMPORARY WORK
SHAFTS
0

LIS - 02.1.7
BONDS AND
GUARANTEES

LIS - 02.4.2
DESIGN
-PERMANENT

0
0

LIS - 02.2.3.3
MATERIAL TESTING
LABORATORY

LIS - 02.5.1
FINAL HAND OVER
0

LIS - 02.3.1.1
COORDINATION AND
DATA COLLECTION
0

LIS - 02.4.1
MISCELLANEOUS
WORKS

LIS - 02.2.2
PLANT & EQUIPMENT
0

LIS - 02.5
MAINTENANCE
PERIOD