Time Table Update
Time Table Update
STATUS
DESCRIPTION
STRUCTURAL DESIGN
Dellosa Design
Zamil Structural (for excavation purposes)
DONE (29 Apr '15)
Zamil Structural (for qoutation purposes)
with qoutation..
Zamil Structural (for AWI approval)
Dellosa Design Permits
DONE.
Electron Electrical Permits
DONE.
SITE DEVELOPMENT
Site Preparation (completion)
DONE (01 May'15)
Drainage
Culvert Box/Bridge
DONE.
Road to GTC
Concrete pavement in front of storage
Perimeter Fence & Gate
BUILDING
Fabrication of Rebars @ GL A-J/1-15
Footings & Column GL A-J/1-15 Pouring of concrete
Installation of Formworks for 2nd Lift of Column GL D & H/1-15
Installation of Anchor bolt of Column @GL A, B, D, H & J/1-15
Tie Beam, Ret. Wall & Slab-On-Grade @ GL A-C/1-15
03.25
1
Structure (Zamil)
June 23,2015: Made Call to Joel Velasco
Anchor Bolt Setting (Tradebay)
Erection and Installation (Tradebay)
Roofings Metalplus (Tradebay/Technotrade)
PU Panel
Ex works by CARSTEN
PU Panel Installation
REFRIGERATION
Award and Downpayment (OMNICO)
Ex-works by OMNICO
Shipping
Piping Works
Equipment Installation (Machine Room/Compressors)
Electrical Wirings and Controls
Testing and /Commissioning
Temperature Pull-down
ELECTRICAL
Substation
Transformer
MTS/Power Panel/MDP/LP
Genset
Cable/Cable tray
Power and Lighting wiring
40 ftr ref van outlet
WATER SYSTEM
Deepwell (250 gal/min)/Tank (100 cu.m)
Pumps and Pipings
Water Softener
FIRE FIGHTING
Pump/Engine/Sprinklers/Extinguisher
Hydrants/Piping
Design
Award
Delivery and Constraction
Testing/Commissioning
10
FISH RECEIVING
Design
Award for Construction
Delivery Time
Dumping Shoot
Transfer & Inclined Conveyor
Sorting Conveyor
Weighing Scale
6252015
APRIL 2015
MAY 2015
JUNE 2015
04.01
04.08
04.15
04.22
04.29
05.06
05.13
05.20
05.27
06.03
06.10
06.17
06.24
10
11
12
13
14
04.03
04.15
JOEL
04.15
04.15
DONE
DONE
DONE
DONE
JULY 2015
AUGUST 2015
SEPTEMBER 2015
07.01
07.08
07.15
07.22
07.29
08.05
08.12
08.19
08.26
09.02
09.09
09.16
15
16
17
18
19
20
21
22
23
24
25
26
09.23
NUM
27
FABRICATION : 8 WEEKS
SHIPMENT
on-site
DEL.
on-site
10
11
12
13
14
OCTOBER 2015
DECEMBER 2015
NOVEMBER 2015
10.21
10.28
11.04
11.11
11.18
11.25
12.02
12.09
12.16
12.23
31
32
33
34
35
36
37
38
39
40
15
16
17
18
19
20
21
0
JANUARY 2016
FEBRUARY 2016
MARCH 20
12.30
01.06
01.13
01.20
01.27
02.03
02.10
02.17
02.24
02.02
02.09
02.16
41
42
43
44
45
46
47
48
49
46
47
48
MARCH 2016
02.23
02.30
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
Program of Works
Fabrication of Rebars for Footing @ GL A-J/1-15
Footing & Column @ GL A,B,D,H & J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade@ GL A-C/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL I-J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Machine Room & EE Room
Slab-on-Grade @ C-D & G-I/1-15
Top Slab
Note:
Item VII will start after the trusses installed.
Item VIII will start after the insulation installed.
- Start of Installation of Anchor Bolts
Prepared by:
Engr. John Harris Z. Aring
DDBS
WORKING DAYS
MONTH 1
ESTIMATED DAYS
10
11
12
13
14
15
16
17
18
19
20
MONTH 2
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
MONTH 2
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
MONTH 3
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
MONTH 4
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
MONTH 5
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
MONTH 6
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
I.
II.
III.
IV.
V.
Program of Works
Temporary Fence (Perimeter Enclosure)
Layout & Staking
Fabrication of Rebars for Footing @ GL A-J/1-15
Footing & Column @ GL A,B,D,H & J/1-15
Excavation for Footing @ GL A-J/1-15
Installation of Forms for Footing @ GL A-J/1-15
Installation of Rebars Footing @ GL A-J/1-15
Pouring of Concrete @ Footing @ GL A-J/1-15
Installation of Formworks for 2nd Lift of Column GL D & H/1-15
Pouring of Concrete @ 2nd Lift of Column GL D & H/1-15
Installation of Formworks for 3nd Lift of Column GL D & H/1-15
Pouring of Concrete @ 3nd Lift of Column GL D & H/1-15
Installation of Anchor Bolt of Column @ GL A,B,D,H & J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade@ GL A-C/1-15
Excavation for Tie Beam
Installation of Forms forTie Beam & Ret. Wall
Installation of Rebars forTie Beam & Ret. Wall
Pouring of Concrete @ Tie Beam & Ret. Wall
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Tie Beam, Ret. Wall & Slab-on-Grade @ GL I-J/1-15
Excavation for Tie Beam
Installation of Forms forTie Beam & Ret. Wall
Installation of Rebars forTie Beam & Ret. Wall
Pouring of Concrete @ Tie Beam & Ret. Wall
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
Preparation of Gravel Base
Installation of Rebars for Slab-on-Grade
Pouring of Slab-on-Grade (Bottom Slab Level)
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Excavation for Tie Beam
Installation of Forms forTie Beam & Ret. Wall
Installation of Rebars forTie Beam & Ret. Wall
Pouring of Concrete @ Tie Beam & Ret. Wall
Preparation of Item 103 (Subgrade Preparation)
Installation of Vent Pipes
VI.
VII.
VIII.
Prepared by:
Engr. John Harris Z. Aring
DDBS
WORKING DAYS
MONTH 1
ESTIMATED DAYS
4
8
120
5
23
17
5
7
2
10
2
3
14
10
3
7
4
3
4
3
3
14
10
3
7
3
3
4
3
5
20
15
5
10
8
71
10
11
12
13
14
15
16
17
18
19
20
5
6
5
2
5
1
15
15
10
8
5
6
5
4
10
MONTH 2
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
MONTH 2
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
MONTH 3
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
MONTH 4
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
MONTH 5
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
MONTH 6
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
Program of Works
Fabrication of Rebars for Footing @ GL A-J/1-15
Footing & Column @ GL A,B,D,H & J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade@ GL A-C/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL I-J/1-15
Tie Beam, Ret. Wall & Slab-on-Grade @ GL D-H/1-15
Machine Room & EE Room
Slab-on-Grade @ C-D & G-I/1-15
Top Slab
Note:
Item VII will start after the trusses installed.
Item VIII will start after the insulation installed.
- Start of Installation of Anchor Bolts
Prepared by:
Engr. John Harris Z. Aring
DDBS
Start (Day)
Finish (Day)
8
8
59
69
79
36
127
57
101
111
143
73
ESTIMATED DAYS
120
51
43
43
65
38
34
14