0% found this document useful (0 votes)
192 views8 pages

Itp For Ipb Installation

ITP

Uploaded by

Ganga Daran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
192 views8 pages

Itp For Ipb Installation

ITP

Uploaded by

Ganga Daran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 8
105. 182.189/201208.27 1105 /0VORM pesctiesiaes Caety Mtoe Binh Thuan, Bia Sen, Quang Nash BEF economic zene, ‘F104 85 5618 900 #F to4.se3 618 059 2ajosri2 | Danny | HSOh | KulLim [Fortnfemation ate | orawn | checked | Approved Detals of Revision a Rew. Jowner : COMPANY LIMITED Ce AES-VCM MONG DUONG POWER Jowner's Engineer = (Contractor = (ifiiii-7- 0.4 Doosan Heavy Industries Vietnam Project lc: T10206 MONG DUONG II 2X S6OMW (NET) COAL FIRED POWER PROJECT |UAS : QEO1 lunit : PO litle T10206-QE01-POZEN__-040210 INSPECTION |xxs : zen AND TEST PLAN FOR eS OAODIO: ISOLATED PHASE BUSDUCT(IPB) cael INSTALLATION Revision + A Drawing No: Page-No 710206-QE01-POZEN-040210 ios Page 1 Copytign by Dosan Hear ndusiss Vietnam. Co.Lt. AU Rpts Rasered 105.182 158/ 201208270917) OvORM ZEEE pagina rrpsortre tovation — €Qazs-vew ‘roms cen- Pozen 1070 Detailed Legend NOTE: This note is only applicable for AES-VCM Mong Duong ‘Survetance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong ‘except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan. Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by ‘AES-VCM Mong Duong. ‘Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not. Hold Point / Downstream construction and other activities shall not proceed ‘without attendance or any written approval of AES-VCM Mong Duong. The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong. Page 2 Cope Coste HearyIndustes Via, Co,L. ALRs Reber. ‘SuoneapbedS Tose] ue uoTDadsuy as panaidde a Gyn Gouepsaane W/peULOned Oy WS UOTE oqgedsu OHH UoNDedSu| SsouNA MM —_ Mey HoHoy'y soURIHLMG's ConepUSUOSRT INCRE | ee pee Soansen uonemnsurse;Ayntonpuco seasng 38240 vin | poem pavenea ie mw] [ml [al cemingeeios porowos 9 sugep pUE YenP Ie esu3] OLA a "paqiea 5 anna we : ibaeemaeis - 7 a “voddns ansojous jonpsng awe ay] 99 a -sOumnesp Oy 300 3e Aud erate fre * ba = eve yea oy aseyd pue soseyd uaenyoq soueieaig| 88 rcopEpUSUTIADST ee etc se) ese) | ec eee ee] se patente pene oar -socoiurenmsaancepusy | jyo[ eq o44 jo endoyssounyBp ot ¥oet| od se Faoepuawnieoer uonejersuy Ssanpenve oof [a] fm) fa ‘emnsopus gal oto Guprm drayawareouo| 98 | ag aonepveunuese: ie natupatreeeage| =|) [ml |e volonpuco dl oun 0 Supram dr-y aul =uO] ga = BUATeS SOG PIRI his eee ee Mm “ 7 oy a1 spue eunsojoue yonpsnq ew ew ensus] YA ‘seme pause ‘SnO}o4 PUB JOXSEB 7800.0 04) Bulan ua eee st [sls -e1jo6oy proncn ove uonDes eunsopua enpsnal °8 paene “SFISOBG a bowie ee * * Wy ue soyonpUED geil 1480 303 yoyo) C8 aay ~ojsod pue saunas Ma ‘ paper oi ™ Me LW ‘Hoddns yanpsna jo jena] 1oau09 ay oeug| 8 cA toeonnazoa sree alee sy Suraed we eyoal ~bood-20z01408N) Supe “1000-9020 1.LSM Bupped | pue ‘sinu ‘sueqsng jo ojyPUOD jeoIsKyd ay yeUD| "pas WN 1s Burge ul fal fw vs Buyoeg 5138 Bupped » Oumesp syeinjeywew eueBe] Ly wauidinbo pojetoosse pue gal Avan Put ¥90U0 ac j Tse [es] ves Ty moe) vounca enwon [wosaY [wvso0G | vos] ss pn ow m0) een so Seay 1 9 wojeeduT | 9000 prow wena . ‘seqnsnpuy Assay uesoog er vom dpaceamiannee ce aad eee @ 1179 woRsodsuy bela 10.8102. 353/20120827 0.17 ovoR stots Cae Inspection Check List Fae TPB rtalaon Chet Rate Drawing Dae Syesife aan cueck mem eon © Agpov]——_Obseved Rest Ne Inspection cemens Ye [No | Nia Rema Motel Ree | __[ehes and veaty PB and assocntd equipment agabst manufactures crewing & packing its conect >| Check he pysieateondton of busbars, rus, an Bae 2 at packing iat TPB stllaon 7 [Eisai ore ivel of bust cuppa avucires an pasion. 2 [heck tor cantare of PS conductor and enclosure. > [tscet enclosure secon are coverd together using the proper gaskot and boone — [Enso tat the Gusev entnure endear Kol caveed ear couning. 3 __[thock te tun weting ofthe PB conductor 6 |eeck tne Mp woting ofthe IPS Enclosure. 7__[Ohesk he ighiness of he xe oint ots 7 [Serance been poses and paso fo oar arses per AFC drawings. | [eck tat te beac encionire 8 appar aac earths 10 [rau al ust and debi is removes eck by: (Sutconst)] DOOSAN Elica! Dep] DOOSAN QAIQC Dept. agswvem Nene iSigmuze _—_|Nane&'Siamwe | Nave@Sigmuve [Nano @ Signe Peion Psion Poston Poston Du Date Dac Dae mae Page 4 ‘cont Donen Haines Vieam. Co. Ale Rasen. Isolated Phase Lie) Dosen en stes c) AES-VCM Vielen Busduct (IPB) Electrical Inspection of IPB Certificate No. Systom Voltage: wv Drawing No, Rev: ‘Aroa/Unit No: te From To: 4 pusbar conductivity Test: Tester used! Tester SI. Not Gireut Designation Busbar conduciviy, ut ne From [70 i 2 B N E Notes: 1. Conductibility measurements shall be carried out between end to end. 2 ausbor Insulation Resistance Test: kV!__Mins) Testor used: Tester SI, No: L1-((2L3NE) Mohms 12 -(L1 L3 NE) Mohs L3-(L1 L2 NE) Mohms NE -(L1L2.N3) Mohms ‘3 Busbar High Voltage Test: Applied Voltage: ‘Tester used: Time Duration Tester SI. No Teakage Gurrent in| __GZiane Daan Gag aNE TSE uA 4 femer i Subcontractor DOOsAN AESVOM Name: Signature: ata: page 5) g.oted Ted raunyeusis| me wonsav nysooa sopenvosgns o 6 8 Z 8 | § + [es [= [oo Seam ESC MT oun to WSA-SAV @& (galsonpsng eseyg peyejos| BES givermome Igolated Phase Busduct(IPB) = AES-vcm Welding Visual Inspection we Oven suv [ ssn | see | moet | useno | wise | WOT [wren 1 2 a 5 ° ° ° © sebconctor 00s sven nrc: ov pase Doosan Heaw industries € ags.vem| PAGE: 8 OF 6 Vietnam L REBORTNO: TORQUE TEST REPORT LOCATION: [DRAWING NO > IKKS NO = MAKE = TORQUE TEST [Test equipment. [Serial no: ‘Calibration Due date: NO | BOLT LOCATION TORQUE SETTING BOLT SIZE RESULT | REMARK checked resut cade G Good NG: No good NA: Notappleabla caitey Tae Sas Date Fama sue IDHI hes

You might also like