Itp For Ipb Installation
ITP
Uploaded by
Ganga Daran
AI-enhanced title
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Itp for Ipb Installation For Later
Download
Save
Save Itp for Ipb Installation For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
155 views
Itp For Ipb Installation
ITP
Uploaded by
Ganga Daran
AI-enhanced title
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Itp for Ipb Installation For Later
Carousel Previous
Carousel Next
Save
Save Itp for Ipb Installation For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 8
Search
Fullscreen
105. 182.189/201208.27 1105 /0VORM pesctiesiaes Caety Mtoe Binh Thuan, Bia Sen, Quang Nash BEF economic zene, ‘F104 85 5618 900 #F to4.se3 618 059 2ajosri2 | Danny | HSOh | KulLim [Fortnfemation ate | orawn | checked | Approved Detals of Revision a Rew. Jowner : COMPANY LIMITED Ce AES-VCM MONG DUONG POWER Jowner's Engineer = (Contractor = (ifiiii-7- 0.4 Doosan Heavy Industries Vietnam Project lc: T10206 MONG DUONG II 2X S6OMW (NET) COAL FIRED POWER PROJECT |UAS : QEO1 lunit : PO litle T10206-QE01-POZEN__-040210 INSPECTION |xxs : zen AND TEST PLAN FOR eS OAODIO: ISOLATED PHASE BUSDUCT(IPB) cael INSTALLATION Revision + A Drawing No: Page-No 710206-QE01-POZEN-040210 ios Page 1 Copytign by Dosan Hear ndusiss Vietnam. Co.Lt. AU Rpts Rasered105.182 158/ 201208270917) OvORM ZEEE pagina rrpsortre tovation — €Qazs-vew ‘roms cen- Pozen 1070 Detailed Legend NOTE: This note is only applicable for AES-VCM Mong Duong ‘Survetance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong ‘except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan. Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by ‘AES-VCM Mong Duong. ‘Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not. Hold Point / Downstream construction and other activities shall not proceed ‘without attendance or any written approval of AES-VCM Mong Duong. The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong. Page 2 Cope Coste HearyIndustes Via, Co,L. ALRs Reber.‘SuoneapbedS Tose] ue uoTDadsuy as panaidde a Gyn Gouepsaane W/peULOned Oy WS UOTE oqgedsu OHH UoNDedSu| SsouNA MM —_ Mey HoHoy'y soURIHLMG's ConepUSUOSRT INCRE | ee pee Soansen uonemnsurse;Ayntonpuco seasng 38240 vin | poem pavenea ie mw] [ml [al cemingeeios porowos 9 sugep pUE YenP Ie esu3] OLA a "paqiea 5 anna we : ibaeemaeis - 7 a “voddns ansojous jonpsng awe ay] 99 a -sOumnesp Oy 300 3e Aud erate fre * ba = eve yea oy aseyd pue soseyd uaenyoq soueieaig| 88 rcopEpUSUTIADST ee etc se) ese) | ec eee ee] se patente pene oar -socoiurenmsaancepusy | jyo[ eq o44 jo endoyssounyBp ot ¥oet| od se Faoepuawnieoer uonejersuy Ssanpenve oof [a] fm) fa ‘emnsopus gal oto Guprm drayawareouo| 98 | ag aonepveunuese: ie natupatreeeage| =|) [ml |e volonpuco dl oun 0 Supram dr-y aul =uO] ga = BUATeS SOG PIRI his eee ee Mm “ 7 oy a1 spue eunsojoue yonpsnq ew ew ensus] YA ‘seme pause ‘SnO}o4 PUB JOXSEB 7800.0 04) Bulan ua eee st [sls -e1jo6oy proncn ove uonDes eunsopua enpsnal °8 paene “SFISOBG a bowie ee * * Wy ue soyonpUED geil 1480 303 yoyo) C8 aay ~ojsod pue saunas Ma ‘ paper oi ™ Me LW ‘Hoddns yanpsna jo jena] 1oau09 ay oeug| 8 cA toeonnazoa sree alee sy Suraed we eyoal ~bood-20z01408N) Supe “1000-9020 1.LSM Bupped | pue ‘sinu ‘sueqsng jo ojyPUOD jeoIsKyd ay yeUD| "pas WN 1s Burge ul fal fw vs Buyoeg 5138 Bupped » Oumesp syeinjeywew eueBe] Ly wauidinbo pojetoosse pue gal Avan Put ¥90U0 ac j Tse [es] ves Ty moe) vounca enwon [wosaY [wvso0G | vos] ss pn ow m0) een so Seay 1 9 wojeeduT | 9000 prow wena . ‘seqnsnpuy Assay uesoog er vom dpaceamiannee ce aad eee @ 1179 woRsodsuy bela10.8102. 353/20120827 0.17 ovoR stots Cae Inspection Check List Fae TPB rtalaon Chet Rate Drawing Dae Syesife aan cueck mem eon © Agpov]——_Obseved Rest Ne Inspection cemens Ye [No | Nia Rema Motel Ree | __[ehes and veaty PB and assocntd equipment agabst manufactures crewing & packing its conect >| Check he pysieateondton of busbars, rus, an Bae 2 at packing iat TPB stllaon 7 [Eisai ore ivel of bust cuppa avucires an pasion. 2 [heck tor cantare of PS conductor and enclosure. > [tscet enclosure secon are coverd together using the proper gaskot and boone — [Enso tat the Gusev entnure endear Kol caveed ear couning. 3 __[thock te tun weting ofthe PB conductor 6 |eeck tne Mp woting ofthe IPS Enclosure. 7__[Ohesk he ighiness of he xe oint ots 7 [Serance been poses and paso fo oar arses per AFC drawings. | [eck tat te beac encionire 8 appar aac earths 10 [rau al ust and debi is removes eck by: (Sutconst)] DOOSAN Elica! Dep] DOOSAN QAIQC Dept. agswvem Nene iSigmuze _—_|Nane&'Siamwe | Nave@Sigmuve [Nano @ Signe Peion Psion Poston Poston Du Date Dac Dae mae Page 4 ‘cont Donen Haines Vieam. Co. Ale Rasen.Isolated Phase Lie) Dosen en stes c) AES-VCM Vielen Busduct (IPB) Electrical Inspection of IPB Certificate No. Systom Voltage: wv Drawing No, Rev: ‘Aroa/Unit No: te From To: 4 pusbar conductivity Test: Tester used! Tester SI. Not Gireut Designation Busbar conduciviy, ut ne From [70 i 2 B N E Notes: 1. Conductibility measurements shall be carried out between end to end. 2 ausbor Insulation Resistance Test: kV!__Mins) Testor used: Tester SI, No: L1-((2L3NE) Mohms 12 -(L1 L3 NE) Mohs L3-(L1 L2 NE) Mohms NE -(L1L2.N3) Mohms ‘3 Busbar High Voltage Test: Applied Voltage: ‘Tester used: Time Duration Tester SI. No Teakage Gurrent in| __GZiane Daan Gag aNE TSE uA 4 femer i Subcontractor DOOsAN AESVOM Name: Signature: ata: page 5)g.oted Ted raunyeusis| me wonsav nysooa sopenvosgns o 6 8 Z 8 | § + [es [= [oo Seam ESC MT oun to WSA-SAV @& (galsonpsng eseyg peyejos|BES givermome Igolated Phase Busduct(IPB) = AES-vcm Welding Visual Inspection we Oven suv [ ssn | see | moet | useno | wise | WOT [wren 1 2 a 5 ° ° ° © sebconctor 00s sven nrc: ov paseDoosan Heaw industries € ags.vem| PAGE: 8 OF 6 Vietnam L REBORTNO: TORQUE TEST REPORT LOCATION: [DRAWING NO > IKKS NO = MAKE = TORQUE TEST [Test equipment. [Serial no: ‘Calibration Due date: NO | BOLT LOCATION TORQUE SETTING BOLT SIZE RESULT | REMARK checked resut cade G Good NG: No good NA: Notappleabla caitey Tae Sas Date Fama sue IDHI hes
You might also like
MOS For LV Cable Installation
PDF
No ratings yet
MOS For LV Cable Installation
9 pages
Itp For Earth Works
PDF
No ratings yet
Itp For Earth Works
12 pages
ITP For Cable Tray Installation
PDF
100% (5)
ITP For Cable Tray Installation
4 pages
ITP For Bench Calibration of Instruments Rev.A
PDF
No ratings yet
ITP For Bench Calibration of Instruments Rev.A
9 pages
ITP For Communication System Installation
PDF
100% (3)
ITP For Communication System Installation
5 pages
JX Nippon Oil & Gas Exploration Inspection Test Record (Itr) - A
PDF
100% (1)
JX Nippon Oil & Gas Exploration Inspection Test Record (Itr) - A
2 pages
ITP For UPS & Battery Charger Installation, Rev A
PDF
No ratings yet
ITP For UPS & Battery Charger Installation, Rev A
9 pages
ITP For Electrical Conduit Installation - Revb
PDF
100% (1)
ITP For Electrical Conduit Installation - Revb
3 pages
ITP For Lighting & Small Power
PDF
100% (1)
ITP For Lighting & Small Power
5 pages
JSA Material Handling
PDF
100% (4)
JSA Material Handling
11 pages
Hse Orientation Training & Topics
PDF
100% (1)
Hse Orientation Training & Topics
2 pages
NS2-DH01-P0ZEN-140011 - ITP For Cable Pulling and Termination - REV.C
PDF
No ratings yet
NS2-DH01-P0ZEN-140011 - ITP For Cable Pulling and Termination - REV.C
8 pages
IPB Inspection Report Unit 1
PDF
No ratings yet
IPB Inspection Report Unit 1
34 pages
Check List For Generator Synchronization
PDF
No ratings yet
Check List For Generator Synchronization
3 pages
WMS Infineon Project Tower (HT HV Cabling Work) - Rev-1
PDF
No ratings yet
WMS Infineon Project Tower (HT HV Cabling Work) - Rev-1
6 pages
CRS-2306-MS-01 Method Statement For AC &DC Wiring
PDF
No ratings yet
CRS-2306-MS-01 Method Statement For AC &DC Wiring
21 pages
Sheath Test Format
PDF
No ratings yet
Sheath Test Format
5 pages
MCCB Replacement in Switch Rack S-SB-115 and Verification of Voltage Testing.
PDF
No ratings yet
MCCB Replacement in Switch Rack S-SB-115 and Verification of Voltage Testing.
11 pages
IMS 448-EQCL - Transformer Installation Checklist Rev01
PDF
No ratings yet
IMS 448-EQCL - Transformer Installation Checklist Rev01
1 page
Arrester
PDF
No ratings yet
Arrester
1 page
002-Sample Method Statement Electrical
PDF
No ratings yet
002-Sample Method Statement Electrical
2 pages
110kv Cable-Specification
PDF
No ratings yet
110kv Cable-Specification
19 pages
Stamping Page - Redlines & Bluelines: Red-Line
PDF
No ratings yet
Stamping Page - Redlines & Bluelines: Red-Line
2 pages
Generator Set Installation Checklist-Open Generator Set
PDF
No ratings yet
Generator Set Installation Checklist-Open Generator Set
2 pages
QCP-S-000-5520-176 Rev A (Elect - Power & Control Cable)
PDF
No ratings yet
QCP-S-000-5520-176 Rev A (Elect - Power & Control Cable)
15 pages
Pre Com Check-Electrical & Instrumentation
PDF
No ratings yet
Pre Com Check-Electrical & Instrumentation
89 pages
Itp FBSB Moc Fibreoptic 005 Final
PDF
No ratings yet
Itp FBSB Moc Fibreoptic 005 Final
6 pages
Test Report (Revisi Fat)
PDF
100% (1)
Test Report (Revisi Fat)
5 pages
Very Low Frequency VLF Testing of HV Cables Manual HP 3651308 211216
PDF
No ratings yet
Very Low Frequency VLF Testing of HV Cables Manual HP 3651308 211216
45 pages
Blk-2 Fiber MSD
PDF
No ratings yet
Blk-2 Fiber MSD
26 pages
MST For 11KV Transformer Instalaltion
PDF
No ratings yet
MST For 11KV Transformer Instalaltion
17 pages
6-C2. Method Stament For Electrical Work
PDF
No ratings yet
6-C2. Method Stament For Electrical Work
22 pages
XLPE UGC Withstand Test
PDF
No ratings yet
XLPE UGC Withstand Test
6 pages
3M Cable Joints Terminations PDF
PDF
No ratings yet
3M Cable Joints Terminations PDF
116 pages
33 11 KV Checklist
PDF
0% (1)
33 11 KV Checklist
2 pages
Project Summary Report - HV Cable (Up To 33kV)
PDF
100% (1)
Project Summary Report - HV Cable (Up To 33kV)
10 pages
WMS For Cable Laying & Termination
PDF
100% (2)
WMS For Cable Laying & Termination
5 pages
Mechanical Completion L.V. Power, Control and Telecomm / Instrument Cables
PDF
No ratings yet
Mechanical Completion L.V. Power, Control and Telecomm / Instrument Cables
4 pages
Method of Statement-13.8KV
PDF
No ratings yet
Method of Statement-13.8KV
57 pages
Commissioning Service Department Commissioning Standard Test Formats Description: Functional Test - Feeder
PDF
No ratings yet
Commissioning Service Department Commissioning Standard Test Formats Description: Functional Test - Feeder
8 pages
Method Statement For Exposed Conduits Installation
PDF
No ratings yet
Method Statement For Exposed Conduits Installation
24 pages
MS For Installation of GCB
PDF
No ratings yet
MS For Installation of GCB
10 pages
Itr Ew 03b HV MV Switchboard
PDF
100% (1)
Itr Ew 03b HV MV Switchboard
6 pages
LV Cable Test Pre-Commissioning
PDF
No ratings yet
LV Cable Test Pre-Commissioning
1 page
Transformer 1 Mos
PDF
No ratings yet
Transformer 1 Mos
5 pages
Nosp Checklist
PDF
No ratings yet
Nosp Checklist
16 pages
Commissioning Service Department Commissioning Standard Test Formats Description: MVAJ101 - TRIP RELAY
PDF
No ratings yet
Commissioning Service Department Commissioning Standard Test Formats Description: MVAJ101 - TRIP RELAY
2 pages
M S Distribution Board
PDF
No ratings yet
M S Distribution Board
7 pages
ECA Safety Guidance Note E01 Safe Working Systems REV 2 May 2018
PDF
No ratings yet
ECA Safety Guidance Note E01 Safe Working Systems REV 2 May 2018
64 pages
Cable Pulling
PDF
100% (1)
Cable Pulling
9 pages
Sequence of Operations
PDF
No ratings yet
Sequence of Operations
8 pages
Electromechanical Work at 132kv Site
PDF
100% (1)
Electromechanical Work at 132kv Site
14 pages
Commissioning Steps
PDF
No ratings yet
Commissioning Steps
15 pages
Check List For Erection of Switch Gear-Field
PDF
100% (1)
Check List For Erection of Switch Gear-Field
3 pages
WI-NG-6460-002-36 Work Instruction-230kV and 380kV XLPE Cables Rev00
PDF
No ratings yet
WI-NG-6460-002-36 Work Instruction-230kV and 380kV XLPE Cables Rev00
7 pages
Lighting Control System Testing & Commissioning Procedure
PDF
100% (1)
Lighting Control System Testing & Commissioning Procedure
4 pages
PSK Checklist New Elec E01 - 18 HT Cabling
PDF
No ratings yet
PSK Checklist New Elec E01 - 18 HT Cabling
1 page
Method Statement For Installation - Electric Pump Motor
PDF
100% (2)
Method Statement For Installation - Electric Pump Motor
5 pages
Cable Laying Works Specification (MEW-13)
PDF
No ratings yet
Cable Laying Works Specification (MEW-13)
8 pages
Method Statement - Cable Jointing
PDF
No ratings yet
Method Statement - Cable Jointing
5 pages
Vt4e Gate Path For Power Receiving
PDF
No ratings yet
Vt4e Gate Path For Power Receiving
1 page
306792638-Inspection-and-Test-Plan-for-Grounding-and-Cad-Welding-System
PDF
No ratings yet
306792638-Inspection-and-Test-Plan-for-Grounding-and-Cad-Welding-System
7 pages
Lamco LA
PDF
No ratings yet
Lamco LA
9 pages
Inspection and Test Plan For Grounding and Cad Welding System
PDF
No ratings yet
Inspection and Test Plan For Grounding and Cad Welding System
3 pages
Hse Orientation Form
PDF
No ratings yet
Hse Orientation Form
1 page
Itp For Ipb Installation
PDF
No ratings yet
Itp For Ipb Installation
8 pages
MS For Lighting & Small Power Installation
PDF
0% (2)
MS For Lighting & Small Power Installation
17 pages
MS For Grounding and Cadwelding Work
PDF
100% (2)
MS For Grounding and Cadwelding Work
34 pages
ITP For Junction Box Installation
PDF
100% (3)
ITP For Junction Box Installation
4 pages
Atmospheric Test Report: Time Air Composition Oxygen Co H S
PDF
No ratings yet
Atmospheric Test Report: Time Air Composition Oxygen Co H S
2 pages
PR#12354332 - Decontamination Jobs - Sow 2016 OLE III TA
PDF
No ratings yet
PR#12354332 - Decontamination Jobs - Sow 2016 OLE III TA
11 pages
Safety Aspects
PDF
No ratings yet
Safety Aspects
14 pages
Itp of Electrical Works (Md2)
PDF
No ratings yet
Itp of Electrical Works (Md2)
2 pages
List of Attendant Confined Space Work
PDF
No ratings yet
List of Attendant Confined Space Work
1 page
Safety Nets
PDF
0% (1)
Safety Nets
13 pages
Combinationwireropesfoii Fishing Purposes-Specification: Indian Standard
PDF
No ratings yet
Combinationwireropesfoii Fishing Purposes-Specification: Indian Standard
10 pages
Notification of New Health and Safety Risks or Problems
PDF
No ratings yet
Notification of New Health and Safety Risks or Problems
1 page
Table of Ppes Required For Each Job Post: Ihs-1-004-R01 Edition 1
PDF
No ratings yet
Table of Ppes Required For Each Job Post: Ihs-1-004-R01 Edition 1
1 page
Employee: PPE Delivery, Usage and Maintenance Control Sheet
PDF
No ratings yet
Employee: PPE Delivery, Usage and Maintenance Control Sheet
1 page
Unit / Department / Centre Plan/Programme Head (Owner) Monitoring Head Preparation Date Validity Period
PDF
No ratings yet
Unit / Department / Centre Plan/Programme Head (Owner) Monitoring Head Preparation Date Validity Period
1 page
1.0 2.0 Gamesa 3.0 4.0 4.1 4.2 5.0 6.0 Drawings: Register Code
PDF
No ratings yet
1.0 2.0 Gamesa 3.0 4.0 4.1 4.2 5.0 6.0 Drawings: Register Code
4 pages
Analysis and Investigation of Accidents and Work-Related Illnesses Form
PDF
No ratings yet
Analysis and Investigation of Accidents and Work-Related Illnesses Form
1 page