Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
192 views
8 pages
Itp For Ipb Installation
ITP
Uploaded by
Ganga Daran
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Itp for Ipb Installation For Later
Download
Save
Save Itp for Ipb Installation For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
192 views
8 pages
Itp For Ipb Installation
ITP
Uploaded by
Ganga Daran
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Itp for Ipb Installation For Later
Carousel Previous
Carousel Next
Download
Save
Save Itp for Ipb Installation For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 8
Search
Fullscreen
105. 182.189/201208.27 1105 /0VORM pesctiesiaes Caety Mtoe Binh Thuan, Bia Sen, Quang Nash BEF economic zene, ‘F104 85 5618 900 #F to4.se3 618 059 2ajosri2 | Danny | HSOh | KulLim [Fortnfemation ate | orawn | checked | Approved Detals of Revision a Rew. Jowner : COMPANY LIMITED Ce AES-VCM MONG DUONG POWER Jowner's Engineer = (Contractor = (ifiiii-7- 0.4 Doosan Heavy Industries Vietnam Project lc: T10206 MONG DUONG II 2X S6OMW (NET) COAL FIRED POWER PROJECT |UAS : QEO1 lunit : PO litle T10206-QE01-POZEN__-040210 INSPECTION |xxs : zen AND TEST PLAN FOR eS OAODIO: ISOLATED PHASE BUSDUCT(IPB) cael INSTALLATION Revision + A Drawing No: Page-No 710206-QE01-POZEN-040210 ios Page 1 Copytign by Dosan Hear ndusiss Vietnam. Co.Lt. AU Rpts Rasered105.182 158/ 201208270917) OvORM ZEEE pagina rrpsortre tovation — €Qazs-vew ‘roms cen- Pozen 1070 Detailed Legend NOTE: This note is only applicable for AES-VCM Mong Duong ‘Survetance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong ‘except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan. Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by ‘AES-VCM Mong Duong. ‘Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not. Hold Point / Downstream construction and other activities shall not proceed ‘without attendance or any written approval of AES-VCM Mong Duong. The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong. Page 2 Cope Coste HearyIndustes Via, Co,L. ALRs Reber.‘SuoneapbedS Tose] ue uoTDadsuy as panaidde a Gyn Gouepsaane W/peULOned Oy WS UOTE oqgedsu OHH UoNDedSu| SsouNA MM —_ Mey HoHoy'y soURIHLMG's ConepUSUOSRT INCRE | ee pee Soansen uonemnsurse;Ayntonpuco seasng 38240 vin | poem pavenea ie mw] [ml [al cemingeeios porowos 9 sugep pUE YenP Ie esu3] OLA a "paqiea 5 anna we : ibaeemaeis - 7 a “voddns ansojous jonpsng awe ay] 99 a -sOumnesp Oy 300 3e Aud erate fre * ba = eve yea oy aseyd pue soseyd uaenyoq soueieaig| 88 rcopEpUSUTIADST ee etc se) ese) | ec eee ee] se patente pene oar -socoiurenmsaancepusy | jyo[ eq o44 jo endoyssounyBp ot ¥oet| od se Faoepuawnieoer uonejersuy Ssanpenve oof [a] fm) fa ‘emnsopus gal oto Guprm drayawareouo| 98 | ag aonepveunuese: ie natupatreeeage| =|) [ml |e volonpuco dl oun 0 Supram dr-y aul =uO] ga = BUATeS SOG PIRI his eee ee Mm “ 7 oy a1 spue eunsojoue yonpsnq ew ew ensus] YA ‘seme pause ‘SnO}o4 PUB JOXSEB 7800.0 04) Bulan ua eee st [sls -e1jo6oy proncn ove uonDes eunsopua enpsnal °8 paene “SFISOBG a bowie ee * * Wy ue soyonpUED geil 1480 303 yoyo) C8 aay ~ojsod pue saunas Ma ‘ paper oi ™ Me LW ‘Hoddns yanpsna jo jena] 1oau09 ay oeug| 8 cA toeonnazoa sree alee sy Suraed we eyoal ~bood-20z01408N) Supe “1000-9020 1.LSM Bupped | pue ‘sinu ‘sueqsng jo ojyPUOD jeoIsKyd ay yeUD| "pas WN 1s Burge ul fal fw vs Buyoeg 5138 Bupped » Oumesp syeinjeywew eueBe] Ly wauidinbo pojetoosse pue gal Avan Put ¥90U0 ac j Tse [es] ves Ty moe) vounca enwon [wosaY [wvso0G | vos] ss pn ow m0) een so Seay 1 9 wojeeduT | 9000 prow wena . ‘seqnsnpuy Assay uesoog er vom dpaceamiannee ce aad eee @ 1179 woRsodsuy bela10.8102. 353/20120827 0.17 ovoR stots Cae Inspection Check List Fae TPB rtalaon Chet Rate Drawing Dae Syesife aan cueck mem eon © Agpov]——_Obseved Rest Ne Inspection cemens Ye [No | Nia Rema Motel Ree | __[ehes and veaty PB and assocntd equipment agabst manufactures crewing & packing its conect >| Check he pysieateondton of busbars, rus, an Bae 2 at packing iat TPB stllaon 7 [Eisai ore ivel of bust cuppa avucires an pasion. 2 [heck tor cantare of PS conductor and enclosure. > [tscet enclosure secon are coverd together using the proper gaskot and boone — [Enso tat the Gusev entnure endear Kol caveed ear couning. 3 __[thock te tun weting ofthe PB conductor 6 |eeck tne Mp woting ofthe IPS Enclosure. 7__[Ohesk he ighiness of he xe oint ots 7 [Serance been poses and paso fo oar arses per AFC drawings. | [eck tat te beac encionire 8 appar aac earths 10 [rau al ust and debi is removes eck by: (Sutconst)] DOOSAN Elica! Dep] DOOSAN QAIQC Dept. agswvem Nene iSigmuze _—_|Nane&'Siamwe | Nave@Sigmuve [Nano @ Signe Peion Psion Poston Poston Du Date Dac Dae mae Page 4 ‘cont Donen Haines Vieam. Co. Ale Rasen.Isolated Phase Lie) Dosen en stes c) AES-VCM Vielen Busduct (IPB) Electrical Inspection of IPB Certificate No. Systom Voltage: wv Drawing No, Rev: ‘Aroa/Unit No: te From To: 4 pusbar conductivity Test: Tester used! Tester SI. Not Gireut Designation Busbar conduciviy, ut ne From [70 i 2 B N E Notes: 1. Conductibility measurements shall be carried out between end to end. 2 ausbor Insulation Resistance Test: kV!__Mins) Testor used: Tester SI, No: L1-((2L3NE) Mohms 12 -(L1 L3 NE) Mohs L3-(L1 L2 NE) Mohms NE -(L1L2.N3) Mohms ‘3 Busbar High Voltage Test: Applied Voltage: ‘Tester used: Time Duration Tester SI. No Teakage Gurrent in| __GZiane Daan Gag aNE TSE uA 4 femer i Subcontractor DOOsAN AESVOM Name: Signature: ata: page 5)g.oted Ted raunyeusis| me wonsav nysooa sopenvosgns o 6 8 Z 8 | § + [es [= [oo Seam ESC MT oun to WSA-SAV @& (galsonpsng eseyg peyejos|BES givermome Igolated Phase Busduct(IPB) = AES-vcm Welding Visual Inspection we Oven suv [ ssn | see | moet | useno | wise | WOT [wren 1 2 a 5 ° ° ° © sebconctor 00s sven nrc: ov paseDoosan Heaw industries € ags.vem| PAGE: 8 OF 6 Vietnam L REBORTNO: TORQUE TEST REPORT LOCATION: [DRAWING NO > IKKS NO = MAKE = TORQUE TEST [Test equipment. [Serial no: ‘Calibration Due date: NO | BOLT LOCATION TORQUE SETTING BOLT SIZE RESULT | REMARK checked resut cade G Good NG: No good NA: Notappleabla caitey Tae Sas Date Fama sue IDHI hes
You might also like
MOS For LV Cable Installation
PDF
No ratings yet
MOS For LV Cable Installation
9 pages
ITP For Cable Tray Installation
PDF
100% (6)
ITP For Cable Tray Installation
4 pages
ITP For Bench Calibration of Instruments Rev.A
PDF
No ratings yet
ITP For Bench Calibration of Instruments Rev.A
9 pages
6th Central Pay Commission Salary Calculator
PDF
100% (436)
6th Central Pay Commission Salary Calculator
15 pages
ITP For Communication System Installation
PDF
100% (3)
ITP For Communication System Installation
5 pages
Work Method Statement For 132kV Cable Pulling
PDF
No ratings yet
Work Method Statement For 132kV Cable Pulling
1 page
ITP For UPS & Battery Charger Installation, Rev A
PDF
No ratings yet
ITP For UPS & Battery Charger Installation, Rev A
9 pages
ITP For Electrical Conduit Installation - Revb
PDF
100% (1)
ITP For Electrical Conduit Installation - Revb
3 pages
ITP For Lighting & Small Power
PDF
100% (1)
ITP For Lighting & Small Power
5 pages
JSA Material Handling
PDF
100% (4)
JSA Material Handling
11 pages
Hse Orientation Training & Topics
PDF
100% (1)
Hse Orientation Training & Topics
2 pages
IPB Inspection Report Unit 1
PDF
No ratings yet
IPB Inspection Report Unit 1
34 pages
Method Statement For Erectiion of Transformer
PDF
No ratings yet
Method Statement For Erectiion of Transformer
3 pages
Abstract of Is 1255
PDF
No ratings yet
Abstract of Is 1255
6 pages
MOS Low Voltage Conductors & Cables System
PDF
No ratings yet
MOS Low Voltage Conductors & Cables System
14 pages
MS Cable Tray Installation
PDF
No ratings yet
MS Cable Tray Installation
10 pages
WMS Infineon Project Tower (HT HV Cabling Work) - Rev-1
PDF
No ratings yet
WMS Infineon Project Tower (HT HV Cabling Work) - Rev-1
6 pages
Very Low Frequency VLF Testing of HV Cables Manual HP 3651308 211216
PDF
No ratings yet
Very Low Frequency VLF Testing of HV Cables Manual HP 3651308 211216
45 pages
Cable Pulling
PDF
100% (1)
Cable Pulling
9 pages
Method of Statement for Capacitor Bank.(N IMS NTT P ME 32 19)
PDF
100% (1)
Method of Statement for Capacitor Bank.(N IMS NTT P ME 32 19)
7 pages
Dokgoro K1785 Method Statement
PDF
No ratings yet
Dokgoro K1785 Method Statement
6 pages
Project Summary Report - HV Cable (Up To 33kV)
PDF
100% (1)
Project Summary Report - HV Cable (Up To 33kV)
10 pages
002-Sample Method Statement Electrical
PDF
No ratings yet
002-Sample Method Statement Electrical
2 pages
25045-A1000-18-ITP-E-004r004 - ITP For Underfloor Raceway
PDF
No ratings yet
25045-A1000-18-ITP-E-004r004 - ITP For Underfloor Raceway
8 pages
High Voltage Xlpe Cables
PDF
No ratings yet
High Voltage Xlpe Cables
3 pages
Installation Procedure For HV Cables
PDF
No ratings yet
Installation Procedure For HV Cables
3 pages
NJS-DEC-QAC-ITP-007-01 - ITP For Substation Steel Structure
PDF
No ratings yet
NJS-DEC-QAC-ITP-007-01 - ITP For Substation Steel Structure
9 pages
Electrical Safety Standards For LV-MV-HV Part-1)
PDF
No ratings yet
Electrical Safety Standards For LV-MV-HV Part-1)
12 pages
Transformer 1 Mos
PDF
No ratings yet
Transformer 1 Mos
5 pages
Method Statement For Cable & Termination
PDF
No ratings yet
Method Statement For Cable & Termination
6 pages
Method Statement of Installation for Scada System (29!01!2025)
PDF
No ratings yet
Method Statement of Installation for Scada System (29!01!2025)
18 pages
Method Statement of Substation - Sample
PDF
No ratings yet
Method Statement of Substation - Sample
17 pages
LV Cable Test Pre-Commissioning
PDF
No ratings yet
LV Cable Test Pre-Commissioning
1 page
Rsae-Frm-216 Rev 00 Inspection Check List LV Bus Duct
PDF
50% (2)
Rsae-Frm-216 Rev 00 Inspection Check List LV Bus Duct
1 page
LPDB Commissioning Protocol: 1. Pre Commissioning Checks
PDF
No ratings yet
LPDB Commissioning Protocol: 1. Pre Commissioning Checks
3 pages
Installation, Testing and Jointing of LT and HT Power Cables Up To 33 KV
PDF
No ratings yet
Installation, Testing and Jointing of LT and HT Power Cables Up To 33 KV
7 pages
16126
PDF
No ratings yet
16126
13 pages
Arun M S PDF
PDF
No ratings yet
Arun M S PDF
164 pages
MS For Installation of GCB
PDF
No ratings yet
MS For Installation of GCB
10 pages
Job Procedure 05 For CABLE LAYING & TERMINATION
PDF
No ratings yet
Job Procedure 05 For CABLE LAYING & TERMINATION
6 pages
N0579-TJN-ET-SI0006 - R01 ITP For Lighting System Installation
PDF
No ratings yet
N0579-TJN-ET-SI0006 - R01 ITP For Lighting System Installation
12 pages
Abb Unipack Datasheet Mercury 1250kva
PDF
No ratings yet
Abb Unipack Datasheet Mercury 1250kva
2 pages
MS For Installation of Cable Tray Support-048
PDF
100% (1)
MS For Installation of Cable Tray Support-048
3 pages
Transformer & Cable Specs
PDF
No ratings yet
Transformer & Cable Specs
297 pages
CRS-2306-MS-01 Method Statement For AC &DC Wiring
PDF
No ratings yet
CRS-2306-MS-01 Method Statement For AC &DC Wiring
21 pages
Checklist Regarding Completion Reports of 66 KV Underground Cables
PDF
No ratings yet
Checklist Regarding Completion Reports of 66 KV Underground Cables
2 pages
QCP-S-000-5520-176 Rev A (Elect - Power & Control Cable)
PDF
No ratings yet
QCP-S-000-5520-176 Rev A (Elect - Power & Control Cable)
15 pages
MST For 11KV Transformer Instalaltion
PDF
No ratings yet
MST For 11KV Transformer Instalaltion
17 pages
Method Statement For Cable Tray Installation
PDF
100% (1)
Method Statement For Cable Tray Installation
4 pages
007 LV & Control Cable Pre-Commissioning
PDF
No ratings yet
007 LV & Control Cable Pre-Commissioning
6 pages
QCP - Quality Control Procedure For Medium Voltage Cable Splicing and Termination
PDF
No ratings yet
QCP - Quality Control Procedure For Medium Voltage Cable Splicing and Termination
25 pages
IMS 448-EQCL - Transformer Installation Checklist Rev01
PDF
No ratings yet
IMS 448-EQCL - Transformer Installation Checklist Rev01
1 page
Cable Tray
PDF
No ratings yet
Cable Tray
7 pages
HV Power Cable Test
PDF
100% (1)
HV Power Cable Test
9 pages
Method of Statement-13.8KV
PDF
No ratings yet
Method of Statement-13.8KV
57 pages
Auxiliary Transformer
PDF
No ratings yet
Auxiliary Transformer
9 pages
WMS For Cable Laying & Termination
PDF
100% (2)
WMS For Cable Laying & Termination
5 pages
Cable Tray Fill Area
PDF
No ratings yet
Cable Tray Fill Area
20 pages
KP-00+++-CQ712-G0006 - Rev.1 - ITP For Electrical Works (UnderGround Earthing Works)
PDF
No ratings yet
KP-00+++-CQ712-G0006 - Rev.1 - ITP For Electrical Works (UnderGround Earthing Works)
3 pages
19-JMS - Installation Cable Tray or Cable Ladder and Support Installatio...
PDF
No ratings yet
19-JMS - Installation Cable Tray or Cable Ladder and Support Installatio...
10 pages
JMC Format For Transmission Line Strining
PDF
0% (1)
JMC Format For Transmission Line Strining
7 pages
306792638-Inspection-and-Test-Plan-for-Grounding-and-Cad-Welding-System
PDF
No ratings yet
306792638-Inspection-and-Test-Plan-for-Grounding-and-Cad-Welding-System
7 pages
Lamco LA
PDF
No ratings yet
Lamco LA
9 pages
Inspection and Test Plan For Grounding and Cad Welding System
PDF
No ratings yet
Inspection and Test Plan For Grounding and Cad Welding System
3 pages
306792638 Inspection and Test Plan for Grounding and Cad Welding System
PDF
No ratings yet
306792638 Inspection and Test Plan for Grounding and Cad Welding System
3 pages
Itp For Ipb Installation
PDF
No ratings yet
Itp For Ipb Installation
8 pages
Ar Oxygen Acetyleneuseandsafety 141013030455 Conversion Gate01 PDF
PDF
No ratings yet
Ar Oxygen Acetyleneuseandsafety 141013030455 Conversion Gate01 PDF
36 pages
Hse Orientation Form
PDF
No ratings yet
Hse Orientation Form
1 page
Atmospheric Test Report: Time Air Composition Oxygen Co H S
PDF
No ratings yet
Atmospheric Test Report: Time Air Composition Oxygen Co H S
2 pages
MS For Lighting & Small Power Installation
PDF
0% (2)
MS For Lighting & Small Power Installation
17 pages
ITP For Junction Box Installation
PDF
100% (3)
ITP For Junction Box Installation
4 pages
MS For Grounding and Cadwelding Work
PDF
100% (3)
MS For Grounding and Cadwelding Work
34 pages
Safety Aspects
PDF
No ratings yet
Safety Aspects
14 pages
Analysis and Investigation of Accidents and Work-Related Illnesses Form
PDF
No ratings yet
Analysis and Investigation of Accidents and Work-Related Illnesses Form
1 page
Safety Nets
PDF
0% (1)
Safety Nets
13 pages
List of Attendant Confined Space Work
PDF
No ratings yet
List of Attendant Confined Space Work
1 page
Employee: PPE Delivery, Usage and Maintenance Control Sheet
PDF
No ratings yet
Employee: PPE Delivery, Usage and Maintenance Control Sheet
1 page
Combinationwireropesfoii Fishing Purposes-Specification: Indian Standard
PDF
No ratings yet
Combinationwireropesfoii Fishing Purposes-Specification: Indian Standard
10 pages
PR#12354332 - Decontamination Jobs - Sow 2016 OLE III TA
PDF
No ratings yet
PR#12354332 - Decontamination Jobs - Sow 2016 OLE III TA
11 pages
Notification of New Health and Safety Risks or Problems
PDF
No ratings yet
Notification of New Health and Safety Risks or Problems
1 page
Itp of Electrical Works (Md2)
PDF
No ratings yet
Itp of Electrical Works (Md2)
2 pages
Table of Ppes Required For Each Job Post: Ihs-1-004-R01 Edition 1
PDF
No ratings yet
Table of Ppes Required For Each Job Post: Ihs-1-004-R01 Edition 1
1 page
Unit / Department / Centre Plan/Programme Head (Owner) Monitoring Head Preparation Date Validity Period
PDF
No ratings yet
Unit / Department / Centre Plan/Programme Head (Owner) Monitoring Head Preparation Date Validity Period
1 page