Quantity Calculation of Isolated Footilngs (Upto Plinth LVL.)

The document provides a calculation of the quantity of concrete needed for isolated footings up to the plinth level of a structure. It calculates the quantity in three stages and gives the total as 0.8697668694 cubic meters for a single footing. For 13 such identical footings, the total concrete quantity required is 11.306969302 cubic meters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views

Quantity Calculation of Isolated Footilngs (Upto Plinth LVL.)

The document provides a calculation of the quantity of concrete needed for isolated footings up to the plinth level of a structure. It calculates the quantity in three stages and gives the total as 0.8697668694 cubic meters for a single footing. For 13 such identical footings, the total concrete quantity required is 11.306969302 cubic meters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

QUANTITY CALCULATION OF ISOLATED FOOTILNGS ( UPTO PLINTH LVL.

)
P.L.

0.9

0.05

0.25

0.15
2

0.55

0.33

0.23

0.725
0.45
0.585

1.5

QUANTITY

3rd stage =

0.093

m3

2nd stage =

0.327

m3

1st stage =

0.45

m3

TOTAL QUANTITY OF
SINGLE FOOTING = 0.8697668694

m3

No. of such footings =

13

TOTAL QUANTITY OF
ALL FOOTING =
11.306969302

m3