FIDIC Quality Control Checklist
FIDIC Quality Control Checklist
Aspects related to Risk Management have been inserted and highlighted in light blue
The aspects that are required by CESA to be complied with by Single Practitioners are highlighted in yellow
The aspects that are required by CESA to be complied with additionally by all other non-ISO certified members
are highlighted in pink
The aspects should be checked at the relevant level to indicate compliance or not
1
2
3
4
Aspect
Quality Management System
Does a Quality Manual exist which specifies who does what, when and where?
Does the Quality Manual include standard operating procedures for controlling and
assuring quality in:
Customer relationships?
Staff relationships?
Procurement?
Customer satisfaction?
Does a quality plan exist for each area of organisational activity or for each assignment?
1
2
3
4
1
2
3
4
Have the requisite quality control, quality assurance and continuous process
improvement and training programmes been identified and are they in place?
Are risk and quality management guidelines included in the Organisational Plan?
Are significant risks at system, process and product levels identified and addressed?
Are the house rules in the FIDIC Risk Management Manual 1997 implemented and
maintained in the organisation?
Are the standards and procedures given in the CESA Advisory Notes observed?
Strategic & Business Planning
Are the internal and external organisational critical success factors including legal
requirements identified and prioritised?
Are the management processes to be controlled and/or improved to satisfy the relevant
interested parties, identified?
Are the processes modeled into a cohesive management system?
Are arrangements to ensure legal compliance in place?
11
Compliance
Yes
No
Item
Aspect
Management Responsibility
1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
Leadership
Have the leaders developed and documented the organisations vision and mission?
Do the leaders facilitate achievement of the vision and mission?
Have the leaders developed and documented the organisations values for long term
success?
Have the leaders implemented these values by appropriate action and behaviour?
Are the leaders involved in the implementation of the business management system?
Commitment
Does the organisation have a policy or policies demonstrating its commitment to meeting
requirements and to establish an overall sense of direction and principles of action?
Do the policies provide a framework for setting the organisations various objectives and
targets?
Are all employees aware of the quality policy?
20
21
22
23
Do the planning arrangements for the operational processes include actions for achieving
operational objectives and targets?
Are the arrangements for communication within the organisation and to/from external
sources in place?
Is an Operational Procedures Manual for implementation by Functional Managers
developed and documented?
Are control measures needed to implement and maintain control of revenue generating
processes, operational processes and product risk assessment included in the
Operational Procedures Manual?
12
Compliance
Yes
No
24
25
26
27
28
29
30
31
32
33
34
35
36
Are arrangements to manage Joint Ventures with other consultants and to manage
Construction Contract processes and procedures (including tendering, evaluation
and supervision controls, quality systems, health and safety, environmental controls,
commissioning, documentation, etc) included in the Operational Procedures Manual?
Is the management of documents that are essential to the successful implementation and
operation of the management system (including authority, issue, review, backup, record
keeping, etc) included in the Operational Procedures Manual?
Organisational Responsibility and Authority
Are the responsibility, authority and interrelationships of all who manage, perform and
verify work, clearly defined?
Is a responsible person(s) to identify and take action on quality problems appointed?
Is an authorised person(s) to develop improvement systems appointed?
Is a clearly defined way to verify the implementation and results of the proposed systems
for improvement available?
Is an authorised person(s) to standardise successful improvement systems appointed?
Verification Resources and Personnel
Are verification requirements identified?
Has a quality leader been appointed to be responsible for the quality management
system?
Does the quality leader report directly to senior management or serve as part of the
senior management team?
Control of Documents
39
40
41
Are documented procedures for controlling all documents and data required for the
quality management system, including output documents available?
Are all documents required for the quality management system reviewed and approved
by authorised personnel prior to issue?
Are current copies of appropriate documents available at all locations where operations
require their use?
13
42
43
44
Have personnel who review and approve document changes access to pertinent data
upon which to base their decisions?
Where sets of preliminary or status documents are submitted do these documents have
a unique identification?
Is there a master control list that identifies the current version of documents?
Quality Records
45
46
47
48
49
50
Are documented procedures for the identification, collection, indexing, filing, storage,
maintenance, and disposition of quality records available?
Are quality records being generated and maintained?
Do these records demonstrate achievement of the required quality and the effective
operation of the quality system?
Are quality records easily accessible?
Have retention times of quality records been defined and recorded and agreed to by
client?
Where necessary are quality records available for evaluation by customers?
Management Review
51
52
53
54
55
Are the organisations requirements to monitor and measure customer perception and
critical processes and procedures included in the review process?
Resource Management
Employees
1
2
3
4
5
6
7
8
9
10
11
Do employees, whose activities affect quality, have appropriate education, training and
experience for the assigned tasks?
Does compensation and recognition for groups and individuals reinforce work
effectiveness and quality assurance?
Does each employee know and understand what is expected in his/her job?
IT Equipment
14
Item
1
2
3
4
5
Aspect
Financial Management
Does the firm manage its finances properly and assure adequate cash flow?
Does the firm have project specific accounting information?
Does the firm share accounting information with its department and project managers?
Is accurate accounting information in the form of profit and loss statements made
available within days of closing regular accounting cycles?
Does the firm submit its accounts and operations to an independent outside financial
audit once a year?
Product/Service Realisation
1
2
3
4
5
6
7
8
9
Have the service providing processes, which directly affect quality, been identified?
Have the primary process characteristics, which affect quality, been identified?
Are documented procedures for each of these processes available and do they address
these primary process characteristics?
Are the procedures up to date and in use?
Do the procedures ensure that personnel have adequate resources and equipment to
adequately perform their jobs?
Are formal documented criteria for output requirements and processes available?
Are documented checklists for the following project phases ensuring completeness and
compliance with all risk remedies available?
Feasibility phase
Appointment phase
Implementation phase
10
11
12
13
14
15
16
Proposals/Contract Review
15
Compliance
Yes
No
Item
17
18
19
20
Aspect
Planning
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Are organisational and technical interfaces between different groups identified and
coordinated?
Are effective lines of communication established between different internal groups and
with external parties?
Are regular, documented project meetings held?
Input
Are the conflict resolutions coordinated with those responsible for establishing the
requirements?
Output
Appointment phase
16
Compliance
Yes
No
Design phase
Implementation phase
38
39
Changes
Are all changes or modifications of the services provided reviewed and approved?
Is documentation that changes, or modifications that are made known to all parties
affected available?
Purchasing
40
41
42
Are subcontractors and suppliers evaluated and selected on the basis of their ability to
meet contract requirements, including quality?
Is the result of this evaluation of subcontractors and suppliers documented?
Is the risk assessment and availability of professional liability insurance part of the
selection criteria for purchasing?
Measurement, Analysis and Continuous Improvement
1
2
3
Client Satisfaction
4
5
6
7
8
9
10
11
12
13
14
15
Are audit results brought to the attention of the responsible personnel in the area
audited?
Are audit results documented?
Are audit result brought to the attention of the appropriate management so that corrective
action may be taken?
Is corrective action taken on the deficiencies found in the audits?
Corrective Action/Control of Non-Conformances
17
16
17
18
Can it be demonstrated that the service quality and the effectiveness/efficiency of the
complete operation is continuously improved?
Does management review the system to ensure its continuing suitability, adequacy and
effectiveness and does management instruct improvements and new directions when
found necessary?
18