Excel de Checklist+ISO9001
Excel de Checklist+ISO9001
100%
90%
80%
70%
60%
Score 50%
Column S
40%
30%
20%
10%
0%
4 5 6 7 8 Total
Process Group
ISO9001-2000 Score by Paragraph
TOTAL
8.5
8.4
8.3
8.2
8.1
7.6
7.5
7.4
7.3
7.2
Paragraph
7.1
6.4
6.3 Column P
6.2
6.1
5.6
5.5
5.4
5.3
5.2
5.1
4
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Score
Checklist para analizar nivel de Implementacion de la norma ISO9001:2000
Company/Organization
Prepared by
5.4.2 QMS Planning 0% Interview management and review records to assess management's
5.4.2 a) Has Top Management caried out plans to meet QMS 0 commitment to carrying out and updating plans to met QMS Corporate resource 4.2.3
requirments and obkectives for improving the QMS, and requirements defined in clause 4.1 and achieve objectives defined allocation plan and
5.4.2 b) Maintained QMS integrity during periods of significant change? 0 in clause 5.4.1 especially during periods of significant change (I.e major related provisions or .
organizational, process and product changes.) procedures regarding its
development and update
7 Product Realization
7.1 Planning of product realization processes 0%
7.1 Is the planning of product realization processes consistent with 0 Note: documentation defining how QMS processes are applied Quality plans 4.2.3
other requirements of the QMS and suitably documented? to a specific product, project or contract may be referred to as
Specifically: a quality plan.
a) Does the quality plan contain quality objectives and 0 Review quality plans for consistency with the QMS and verify that Quality plans, production ###
requirements for products? appropriate quality objectives are established. plans, work orders, ###
b) Does the quality plan define appropriate realization processes 0 Review quality plans, production plans, work orders and other. process sheets, etc.
and identify documentation and resource requirements appropriate documentation to verify that realization processes,
specific to products? and documentation and resource requirements are
defined
Note: operations control is discussed in clause 7.5.1.
c) Does the quality plan identify required verification and 0 Review quality plans, production plans, work orders, process Quality plans, production ###
validation, monitoring, inspection & test activities specific to the sheets, inspection procedures or instructions and other plans, work orders, 4.10
product and the criteria for acceptance? appropriate documentation to verify that: process sheets, etc. ###
d) Does the quality plan identify the records that are necessary to 0 Verification and validation activities and criteria for
provide evidence that the realization processes and resulting acceptance, and related record requirements are defined.
product meet requirements? Note: process and product monitoring activities are discussed in
clauses7.4.3, 8.2.3 and 8.2.4, and validation requirements (for special
processes) are discussed in clause 7.5.2
Has the organization determined & implemented effective Review the quality manual and/or other appropriate . Quality manual,
arrangements for communication with the customer regarding: documentation to verify that responsibilities for internal
a) product information? 0 communications with the customer are clearly defined Organization charts,
b) inquiries, contracts or order handling, including 0 Interview customer service or other contact personnel to verify job descriptions, etc.
amendments? communications system are effectively implemented.
c) customer feedback, including customer complaints? 0 Review customer complaints for any evidence that
communications were ineffective.
Review design & development plan and design project files for
evidence that verification/validation activities are performed as
7.3.6 Is validation performed in accordance with planned arrangements 0 planned.
(see 7.3.1) to ensure that resulting product is Review design project files for evidence that design stage Design stage docs: .
capable of fulfilling requirements for the specified or known intended documents have been verified and approved, that other i.e. feasibility studies, 4.4.7
use prior to delivery/implementation? appropriate records are established and controlled, and that prelim. drawings,
Are validation results and subsequent follow-up 0 appropriate follow-up actions are taken to address failures. calculations, etc
actions recorded and controlled (per Clause 4.2.4)? Validation and testing
procedures 4.4.8
Quality Records
Control Procedure
Are design & development changes documented, reviewed, verified 0 Verify that design changes are evaluated and approved prior to Design and /or 4.4.9
& validated before implementation? implementation. development Change
is the effect of changes on parts and delivered product evaluated? 0 Verify that the effect of changes on parts & delivered Control Procedure or Process
Are results of the review of changes and subsequent follow-up 0 product are evaluated. Quality Records Control
actions documented (per Clause 4.2.4)? Verify that required records are established and controlled. Procedure
Is product identified by suitable means throughout production? 0 Review for adequacy the system of assigning, documenting & Product Identification ###
Is product identified with respect to measuring & monitoring 0 recording product identification numbers, including part numbers, procedures and related
requirements? serial numbers, or other unique identification as appropriate for bills of material, parts
Where traceability is a requirement is the unique identification of the 0 raw materials and other purchased products, in-process lists, etc.
product controlled and recorded? materials and finished goods.
Verify that all materials, components, Product identification
and products in all areas and at all stages of production are tags, labels
identified with appropriate markings, labels, tags etc.
Verify that product inspection & acceptance status is Inspection status docs ###
identified throughout production travelers, stamps
Review traceability plans or other documents for inclusion of all Traceability plans ###
applicable requirements; verify plans are authorized, available &
used in receiving, storage and production areas, and that all
required records are maintained.
Does the organization identify the monitoring & measurements to be 0 Verify that required measurements and applicable inspection, Quality control plans, 4.11.1
made and the M+M devices required to assure product measuring and test equipment (IM&TE) are identified; see IM&TE Control
conformity (including software used for product verification)? clause 7.1 for related planning activities & 7.2.1 for product review processes and/or
activities. procedures and relevant
work instructions
Are measuring and monitoring devices used and controlled to 0 Review for adequacy methods for determining how the Gage R&R studies 4.11.2.a
ensure that measurement capability is consistent with requirements? required accuracy of measurements is known and documented,
how M+M equipment capability is recorded, and how the influence of
differing environmental conditions and other factors is
accounted for.
When applicable, are measuring and monitoring devices: Review a sample of calibration procedures; verify M+M equipment was
a) calibrated or verified periodically or prior to use against 0 appropriately and accurately calibrated and that personnel
devices traceable to international or nationalmeasurment standards or performing calibrations know how to use calibration procedures /
other recorded basis? instructions.
b) adjusted/re-adjusted as necessary 0 Verify that M+M equipment found in production and inspection areas is Calibration control 4.11.2 b - i
c) identified & calibration status recorded? 0 properly identified, maintained, stored, and safeguarded against processes, procedures
d) safeguarded from adjustments that would invalidate 0 unauthorized adjustments, and that current calibration results and relevant work
the calibration? are recorded and calibration status is known. instructions
e) protected from damage and deterioration during handling, 0
maintenance and storage? 0 Review applicable records to verify that appropriate actions,
including customer notification, are taken on product and process
f) validity of previous results re-assessed if they are subsequently 0 when IM&TE is found to be out of calibration.
found to be out of calibration, and corrective action taken?
8 Measurement, analysis and improvement
8.1 Measurement, analysis and improvement - Planning 0%
Has the organization identified and planned the measurement 0 Review for adequacy the procedures or processes for Measurement, 4.10.1
and monitoring activities needed identifying methods, techniques and data used to measure, monitoring, inspection,
a) to demonstrate conformity of the product 0 monitor or improve products, processes, customer satisfaction . & improvement
b) ensure conformity of the QMS 0 or organizational performance processes, plans,
c) continually improve QMS effectiveness 0 procedures and relevant
Have the methods of measuring, analysis and improvement, including 0 work instructions.
staistical techniques & the extent of their use been determined? 0 4.20
8.2.1 Does the organization monitor information relating 0 Review for adequacy the process for obtaining and using customer Processes or procedures
to customer perception as to whether it has fulfilled satisfaction information to monitor, measure and improve the quality for requesting,
customer requirements? And management system measuring, & monitoring
customer feedback,
Are the methods for obtaining and using information on 0 including complaints,
customer satisfaction defined? surveys, etc.
8.2.2 Are internal audits conducted at planned intervals to determine 0 Review the documented internal audit procedures for adequacy Documented Internal ###
whether the QMS a) conforms to planned arrangements, to in explaining all aspects of the auditing system. Quality Audit Procedure
ISO9001-2000 requirements & the QMS requirments established by
the organization and Review internal audit plan to verify that it includes all applicable Internal Audit Plan
b) has been effectively implemented? 0
Is there an internal audit plan and does it consider the status and requirements and addresses all appropriate considerations.
importance of audit activities and areas and the results of
previous audits? Review internal audit reports to:
Is the critieria scope, frequency and methodologies of internal audits 0 verify that the scope, frequency, and methodologies are defined Internal audit
defined? and clearly communicated . notifications, relevant
Are audits conducted by personnel who are objective, independent 0 verify that internal auditors are trained and independent of the work instructions and/or
of the activity being audited and not assigned to audit their own work? activities/areas audited. checklists
Is there a documented procedure identifying 0 verify that results are recorded, processed and evaluated by Internal audit reports
responsibilities/requirements for planning and conducting audits, management per procedure.
recording results and reporting to management?
Does management of audited area take timely action to eliminate 0 verify that corrective actions are implemented and followed-up in
nonconformities and their causes. a timely manner and that all results are recorded.
Are follow-ups performed to verify implementation of 0
actions taken and are related results recorded?(see 8.5.2)
8.2.3 Are suitable methods applied for measurement and monitoring 0 Review the implementation of process controls (including Measurement, monitoring,
of QMS processes? statistical techniques) identified per clause 8.1 to verify they are inspection, and
used to assess process capability of product conformity. improvement processes, ###
Do these methods confirm the continuing ability of each process 0 Verify that employees were trained to perform measurement plans, procedures and 4.10.1
to achieve planned results? and monitoring assignments (including inspection activities and relevant work instructions. 4.20.2
When planned results are not achieved, is appropriate correction 0 tasks requiring the use of statistical techniques) and that they
and corrective action taken to ensure product conformity? are properly using them as an aid in assessing the need for
corrective/preventive ancions or improvement activities.
Review records to verify receiving inspections are performed Receiving inspection 4.10.2
Is there assurance that no product is released or service completed 0 as planned, and: process, procedures
until all planned arrangements have been completed, unless otherwise and/or relevant work
approved by a relevant authority and. Where applicable, the customer. Products with different status are adequately segregated and instructions
appropriately labeled. Quality plans
Inspectors are qualified, and required supplier submittals Supplier submittals
are on file.
Verify that inspection personnel are trained and that procedures In-process inspection 4.10.3
are available and followed. process, procedures
Review records to verify that uninspected or and/or relevant work
nonconforming products are prevented from being used in the instructions
next processing stage; and, to verify that inspection status is Process sheets
maintained throughout all stages of production. and/or Quality plans
Review records to verify that all activities specified in the Final inspection process,4.10.4
quality plan / procedures are satisfactorily completed, procedures and/or
associated data and documents are available / authorized; and relevant work instructions
product released as authorized
Verify that inspectors are qualified, and that procedures are Quality plans; final
available and followed. audit checklists, etc.
3 Is there a documented procedure defining the controls and related 0 Review the documented procedure for adequacy. Nonconforming Product 4.13.1
responsibilities and authorities for dealing with nonconforming product? Control procedure and 4.13.2
Specifically, Through observation, verify that all nonconforming products, relevant work instructions
Are products that do not conform to product requirements identified 0 wherever they are found, are clearly identified and segregated; and/or inspection
and controlled per the established procedure to prevent their and, verify that nonconformity reports are being established and procedures
unintended use or delivery? further processed to document disposition decisions and inform
Does the organization deal with the nonconforming product by one other functions concerned.
of the following ways?" Review nonconformity reports to verify that dispositions are
a) By taking action to eliminate the detected nonconformity 0 appropriate, authorized at the appropriate level and that reworked
b) By authorizing its use, release or acceptance under concession by 0 product is re-verified.
a relevant authority and, where applicable, by the customer Verify that proposed actions are reported and that concessions are
c) By taking action to preclude its original intended use or application 0 recorded and performed as required.
Does the organization continually improve the effectiveness of the 0 Verify that a procedure or established process is in place to identify Improvement process
QMS through the use of the: and manage improvement projects based on information re: or procedure
(1) quality policy, (2) quality objectives, (3) audit results, 0 The continuing suitability of the quality policy (clause 5.3) and Quality manual 4.1.1
(4) analysis of data, (5) corrective and preventive actions quality objectives (clause 5.4.1)
and (6) management reviews? Internal audit results (clause 8.2.2) Internal Audit Procedure ###
Output from data analysis, including customer satisfaction, Data Analysis process ###
supplier performance, product conformance, and process or procedure
performance trends (clause 8.4)
Corrective and Preventive action results (clauses 8.5.2 and 8.5.3) Corrective and Preventive###
Action procedures ###
Management review actions (clause 5.6.3) Management review
process or procedure
Is there a documented procedure to ensure appropriate 0 Verify that the documented procedure adequately explains and Documented Corrective 4.14.1
corrective actions are taken to eliminate the causes of defines responsibilities for the corrective action process. Action procedure
nonconformity and prevent their recurrence? Specifically, Review customer complaints, nonconforming material reports,
a) are nonconformities (including customer complaints) reviewed? 0 outputs from management review, internal audit reports, and
b) are causes of the nonconformity determined? 0 outputs from data analysis to verify that corrective action
c) are evaluations conducted to identify actions that will 0 requests are initiated when nonconformities are identified. 4.14.2
prevent recurrence?
d) are needed corrective actions defined and implemented? 0 Review corrective action records to verify that root causes are
e) are records of actions taken & results recorded? (see 4.2.4) 0 identified, that actions aimed at preventing recurrence are
f) are follow-up reviews of actions taken performed to verify their 0 recorded and implemented in a timely manner, and that follow–up
effectiveness? reviews are performed.
Is there a documented procedure to determine & initiate appropriate 0 Verify that the documented procedure adequately explains and Documented Preventive 4.14.1
preventive actions to eliminate the causes of potential defines responsibility for the preventive action process. Action procedure
nonconformity to prevent their occurrence? Specifically,
a) are potential nonconformities and their causes determined? 0 Review for adequacy the methods used to identify potential
b) are evaluations conducted to determine the need for preventive 0 nonconformities and their causes. 4.14.3
action?
c) are actions identified, implemented and appropriate to the effects 0 Review preventive action records to verify that potential
of potential problems nonconformance and their causes are identified, that actions
d) are results of action taken recorded? 0 aimed at preventing occurrence are recorded and implemented
e) are follow-up reviews of actions taken performed to verify their 0 in a timely manner, and that follow–up reviews are performed.
effectiveness?