Magnetic Particle Inspection Report
Magnetic Particle Inspection Report
Revision No: 02
Client
Client Address
:
:
Report No.
Procedure No.
: RPT/SPT/UMW-N7/MPI/001
: SPT-OP-NDT-001
Location of Inspection
Refer to PO
Date of Inspection
Due Inspection
: -
Drawing No.
Material spec.
Light type
Contrast paint
Batch no. of
:
:
:
:
:
Welding process
Test Specification
Light intensity
Particle Ink
:
:
:
:
:
MPI equipment
Yoke
Prods
Coil
Type of current
AC
Permanent
HWDC / HWAC
Others
Type of Inspection
Dry
Wet
Fluorescent
Method examination
Continuous
Residual
Non
Fluorescent
As forged
As Rolled
Others (As
Cast)
Pole Spacing
Others (After
clean)
Lifting Block
Surface condition
Ferromagnetic
Natural
WCP-2
1365002
As welded
Surface preparation
Brushing
Machining
Blasting
Time of inspection
After weld
After hydrotest
After PWHT
Scope of inspection
Base metal
Edge prep
Back chipping
Weld part
Repair weld
Others (
Description
Area Inspected
Accepted
- 10 LBS
- S/N: 15656
- Cal Due: April 2017
Rejected
Remarks
Pictures:
Date :
Except for cases of proven negligence of fraud by SIAPTEK, the Client agrees to hold harmless and indemnify SIAPTEK and its inspectors, technicians, officers, employees, agents or subcontractors against all claims (actual or threatened) by them and by any third party for loss,
damage or expense of whatsoever nature including all legal expenses and related costs and however arising relating to the performance, purported performance or non-performance of the services or out of or in connection with Clients product, process or service the subject of the
certification including, without limitation, product liability claims. The total liability of SIAPTEK to the Client in respect of any claims for loss, damage or expense of any nature and howsoever arising shall be limited, in respect of any one event or series of connected events, to an
amount equal to US$ 1,000 (excluding Value Added Tax thereon).
www.siaptek.com
E-mail: [email protected]