Iec College of Engineering & Technology (Gr. Noida)
Iec College of Engineering & Technology (Gr. Noida)
IEC - CET
DEPARTMENT OF ELECTRONICS AND INSTRUMENTATION
ENGINEERING
IEC COLLEGE OF ENGINEERING AND TECHNOLOGY, GR. NOIDA
UPTU, GR. NOIDA, JUNE, 2015
ACKNOWLEDGEMENT
First, I would like to express our best regards to our training guide Mr. A. K. TRIPATHI,
whose valuable guidance, encouragement, and provision of necessary facilities made this
work possible.
We are also thankful to our respected Head of the Department of DR. RANJIT SINGH EI
(HOD), IEC COLLEGE OF ENGINEERING AND TECHNOLOGY, GR..NOIDA,whose
help and shared knowledge was the main support to complete our training. Many thanks are
owed to our classmates for their useful discussion and timely suggestions. Their technical
support and encouragement helped us to finalize our training.
Our special thanks to MR. SANTOSH (CEO CREST Chandigarh) & MR.
RAVINDER(Project director at CREST Chandigarh), who helped us a lot through the
problems, we came across. We are absolutely grateful to all non-teaching staff for their
assistance which is key factor behind our success. We would also like to express our gratitude
towards the college for providing us with the best facilities and proper environment to work
on our project.
Finally we offer our great thanks and regards to our family for their support which helped us
through the difficulty and hardships of life to earn this achievement.
PREFACE
With the ongoing telecom revolution where innovations are taking place at the blink of an
eye, it is impossible to keep the pace with the emerging trends. In organization where Making
Things Right in the first instance is the driving motto, perfection and accuracy are inevitable.
Excellence is an attitude that the whole of the human race is born with. It is the environment
that makes sure that whether the result of this attitude is visible or otherwise. A well planned,
properly executed and evaluated industrial training helps a lot in inculcating a professional
attitude. It provides a linkage between the student and industry to develop an awareness of
industrial approach to problem solving, based on a broad understanding of process and mode
of operation of organization.
During this period, the students get the real, first-hand experience for working in the actual
environment. Most of the theoretical knowledge that has been gained during the course of
their studies is put to test here. Apart from this, the students get an opportunity to learn the
latest technology, which immensely helps them in building their career.
I had the opportunity to have a real experience on many ventures, which increased my sphere
of knowledge to a great extent. I was entrusted with a real life project, working on which had
finally made me step into the ongoing telecom revolution and gradually become a part of it.
And all the credit goes to organization wind tech. which in true self made the telecom
revolution happen.
CONTENTS:
1.Solar resource
2.Site selection
3.Roof top solar PV components
o Solar PV module
o Mounting and tracking systems
o Inverter
o Electrical designing of SPV plant
4.Permits and licensing
5. Commissioning
6. Operation and maintenance
7. Application of solar PV
8. Comparison between different renewable methods
9. Most preferred solar companies in India
10. Conclusion
11. Reference
SOLAR RESOURCES:
Quantifying the Resource:
Site selection
resource data
irradiance , at
usually defined
irradiation and
and planning
of
PV power plants requires reliable solar
. Power
production depends linearly on the plane of array
least to a first approximation . The solar resource of a location is
by the values of global horizontal irradiation [27] , direct normal
diffuse horizontal irradiation as defined below.
SITE SELECTION:
Selecting a suitable site is a crucial component of developing a viable solar PV project.
There are no clear cut rules for site selection. Viable projects have been developed in
locations that may seem unlikely on first look, such as on high gradient mountain
slopes, within wind farms and on waste disposal sites. In general, the process of site
selection must consider the constraints and the impact they will have on the cost
of the electricity generated. The main constraints that need to be assessed include:
Solar resource.
Local climate.
Available area.
Land use.
Topography.
Geotechnical.
Accessibility.
Grid connection.
Module soiling.
Water availability.
2.Area:
The area required per kWp of installed power varies with the technology chosen. The
distance between rows of modules (the pitch) required to avoid significant inter -row
shading varies with the site latitude. Sites should be chosen with sufficient area to
allow the required power to be installed without having to reduce the pitch to levels that
cause unacceptable yield loss. Depending on the site location (latitude) and the type of PV
module selected (efficiency), a well-designed PV power plant with a capacity of 1
MWp developed in India is estimated to require between one and two hectares (10,000
to 20,000 m2) of land. A plant using lower efficiency CdTe thin film modules
may require approximately 40 to 50% more space than a plant using poly-crystalline
modules. Figure 15 shows a large ground mounted plant.
3.Climate:
In addition to a good solar resource, the local climate should not suffer from extremes
of weather that will increase the risk of damage or downtime. Weather events that may need
consideration include:
Flooding May increase the risk of erosion of support structure and foundation depending
on geo-technical conditions.
High wind speeds The risk of a high wind event exceeding the plant
specifications should be assessed. Locations with a high risk of damaging wind speeds
should be avoided. Fixed systems do not shut down at high wind speeds, but tracking
systems must shut down in safe mode when speeds of 16-20 m/s are exceeded.
Snow Snow settling on modules can significantly reduce annual energy yield if mitigating
measures are not taken. If the site is prone to snow, then one has to consider factors such
as extra burden on the mounting structures, the loss in energy production and the
additional cost of higher specification
modules or support structures. The cost of removing the snow needs to be weighed
against the loss in production and the likelihood of further snowfall. The effects of snow can
be mitigated by a design with a high tilt angle and frameless modules. The design should
also ensure that the bottom edge of the module is fixed higher than the average snow
level for the area. A site that has regular coverings of snow for a long period of time
may not be suitable for developing a solar PV plant.
Temperature The efficiency of a PV power plant reduces with increasing
temperature. If a high temperature site is being considered, mitigating measures should be
included in the design and technology selection. For instance, it would be better to choose
modules with a low temperature coefficient for power.
4.Topography:
Ideally, the site should be flat or on a slight south facing ( in the northern
hemisphere) slope. Such topography makes installation simpler, and reduces the cost of
technical modifications required to adjust for undulations in the ground. With additional
cost and complexity of installation, mounting structures can be designed for most
locations. In general, the cost of land must be weighed against the cost of designing a
mounting structure and installation time.
5.Geotechnical:
A geotechnical survey of the site is recommended prior to final selection. The purpose is
to assess the ground conditions in order to take the correct design approach , and to
ensure that the mounting structures will have adequate foundations. The level of the
geotechnical survey required will depend on the foundation design that is envisaged.
6.Access:
The site should allow access for trucks to deliver plant and construction material . This may
require upgrading existing roads or building new ones. At a minimum, access roads should
be constructed with a gravel chip finish or similar. The closer the site is to a main access
road, the lower the cost of adding this infrastructure. Safe packaging of the modules and
their susceptibility to damage in transport must also be carefully considered. The site
should be in a secure location where there is little risk of damage from either people or
wildlife. It should ideally be in a location where security and maintenance personnel can
respond quickly to any issue and this requirement should be stipulated in the maintenance
contract.
7.Grid Connection:
A grid connection of sufficient capacity is required to enable the export of power. The
viability of grid connection will depend on three main factors: capacity, availability and
proximity. These factors should be considered thoroughly at an early stage of a
project; otherwise, the costs could become prohibitive if the site is later found to be
in an unfavourable area for grid connection.
Capacity The capacity for the grid to accept exported power from a solar plant will
depend on the existing network infrastructure and current use of the system. The rating
of overhead lines, cables and transformers will be an important factor in assessing the
connection capacity available. Switchgear fault levels and protection settings may also be
affected by the connection of a generation plant. In cases where a network does not have
the existing capacity to allow connection, there are two options available:
1.To reduce peak power export to the allowable limits of the network
2.To upgrade the network to allow the desired export capacity. Network upgrade
requirements will be advised by the network operator. But some aspects of that
upgrade can be carried out by contractors other than the network operator. Initial
investigation into network connection point capacity can often be carried out by reviewing
published data.
Proximity A major influence on the cost of connecting to the grid will be the
distance from the site to the grid connection point. Sites should be at locations where
the cost of grid connection does not adversely affect project economics. Besides, a
higher connection voltage will entail increased cost of electrical equipment such
as switchgear and transformers, as well as a higher conductor specification. A higher
voltage is also likely to increase the time taken to provide the connection resulting in a
longer development period.
Availability The grid availability describes the percentage of time that the network
is able to export power from the solar PV plant.
8.Land Use:
Solar PV power plants will ideally be built on low value land. If the land is not already
owned by the developer, then the cost of purchase or lease needs to be considered. The
developer must purchase the land or rights for the duration of the project. Besides access to
the site, provision of water, electricity supplies and the rights to upgrade access roads must be
considered along with relevant land taxes. Since government permission will be required to
build a solar plant, it is necessary to assess the site in line with the local conditions imposed
by the relevant regulatory bodies. If the land is currently used for agricultural purposes, then
it may need to be re-classified for industrial use with cost and time implicationsand the
possibility of outright rejection. The future land use of the area must also be taken into
account. It is likely that the plant will be in operation for at least 25 years. As such,
extraneous factors need to be considered to assess the likelihood of their impact on energy
yield. For example, the dust associated with building projects could have significant impact
on the energy yield of the plant. Locating the plant in an environmentally sensitive area
should be avoided. Government stipulated environmental impact assessments or
plant/wildlife studies will slow down and potentially stop the development of a project. Any
trees on the project site and surrounding land may need to be felled and removed, with
associated cost.
9. Module Soiling:
If the modules are soiled by particulates, then the efficiency of the solar plant could be
significantly reduced. It is , therefore, important to take into account local weather,
environmental, human and wildlife factors while determining the suitability of a site for a
solar PV plant. The criteria should include:
Dust particles from traffic, building activity, agricultural activity or dust storms. Module
soiling from bird excreta. Areas close to nature reserves, bird breeding areas and lakes
should be carefully assessed. Soiling of modules may require an appropriate maintenance
and cleaning plan at the site location.
2. TRACKING SYSTEMS:
In locations with a high proportion of direct irradiation including some regions of India,
single or dual-axis tracking systems can be used to increase the average total annual
irradiation. Tracking systems follow the sun as it moves across the sky. They are generally
the only moving parts employed in a PV power plant.
Single-axis trackers alter either the orientation or tilt angle only, while dual-axis tracking
systems alter both orientation and tilt angle. Dual-axis tracking systems are able to track the
sun more precisely than single-axis systems. Depending on the site and precise characteristics
of the solar irradiation, trackers may increase the annual energy yield by up to 27% for
single-axis and 37% for dual-axis trackers. Tracking also produces a smoother power output
Plateau.
Substation.
Earthing and surge protection.
COMMISSIONING:
Commissioning should prove three main criteria:
The power plant is structurally and electrically safe.
The power plant is sufficiently robust (structurally and electrically) to operate
the specified project lifetime.
for
Vegetation control.
Routine balance of plant servicing / inspection.
Common unscheduled maintenance requirements include:
Tightening cable connections that have loosened.
Replacing blown fuses.
Repairing lightning damage.
Repairing equipment damaged by intruders or during module cleaning.
Rectifying supervisory control and data acquisition (SCADA) faults.
of
Providing
centralised
CONCLUSION:
Solar SPV certification by both MNRE (New Delhi) & CREST Chandigarh validates the
knowledge and skills required for ICT industry entry level knowledge and complete
broader overview. The SPV curriculum includes:
REFERENCES:
o Mnre.gov.in
o Crestchd.org.in
o Wikipedia.org