FM. DMS/ Op-2 Abu Dhabi Distribution Company Power Network Division
FM. DMS/ Op-2 Abu Dhabi Distribution Company Power Network Division
DMS/ op-2
ABU DHABI DISTRIBUTION COMPANY
POWER NETWORK DIVISION
TR
SWG
CABLE
T&P
RTU
COMM
OHL
Nature of extent of work to be done: RECTIFYING THE SNAG LIST FOR THE ATTACHED SUBSTATION
LAMP CHECK, SLD FIXING, ETC,.,
Points of Isolation at:
_____
_____
Yes
No
___________________________________
From
To
Date
No
Time
Work Requested by: SPACEAGE GEN. CO.W.L.L_____Consultant Approval: MOTT MAC DONALD_____
Name: PRITHIVIRAJ MUTHU ____________________Name: HARRIS JOE______________
Signature: __________________________________
Signature: ______________________________________
Date: 09/04/2016 ___ Tel No.: 055-3141257 ________ Date: 09/04/2016___ Tel No.: _____________________
This section to be filled by Project Division:
Work Approved:______________________________
Work Approved:_________________________________
Name: _____________________________________
Name: _________________________________________
Signature: __________________________________
Signature: ______________________________________
Work Approved:______________________________
Work Approved:_________________________________
Name: _____________________________________
Name: _________________________________________
Signature: __________________________________
Signature: ______________________________________
Eastern Region
_________________________________
Date:
Name:
_________________________________
Signature: _____________________________
Comments:
_________________________________
Western Region
_____________________________
Signature: _____________________________
Comments: __________________________________________________________________________________
For DMS Division use only
Type of Document to be Issued:
LAP
PTW
SFT
Comments: __________________________________________________________________________________