100% found this document useful (8 votes)
16K views

Dye-Penetrant Test Report Form-1

The inspection report summarizes the results of a liquid penetrant examination performed on an unspecified component. The examination found no defects, as the stage of examination, type of penetrant used, development process, and judgement were all reported as satisfactory. The report documents the job number, client, project details, welding details like joint and welder numbers, types of penetrant, developer and cleaner used, and is signed by the PEC quality control inspector and client representative to verify the results.

Uploaded by

sudhavel
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (8 votes)
16K views

Dye-Penetrant Test Report Form-1

The inspection report summarizes the results of a liquid penetrant examination performed on an unspecified component. The examination found no defects, as the stage of examination, type of penetrant used, development process, and judgement were all reported as satisfactory. The report documents the job number, client, project details, welding details like joint and welder numbers, types of penetrant, developer and cleaner used, and is signed by the PEC quality control inspector and client representative to verify the results.

Uploaded by

sudhavel
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PEC LTD

21 Shipyard road Singapore 628144

INSPECTION REPORT FOR


LIQUID PENETRANT EXAMINATION
Job No

: __________

Client

Project

: __

_
Report No: ________

Stage of Examination
Surface Preparation

_______

Others

As Welded

After Hydro Test

Grinding

Machining

Others (As Weld)

Color Contrast

Fluorescent

Spraying

Others (Brushing)
Penetrant Time 15 Min

Temperature
Ambient Temperature.
Water Washable Penetrants
Dry Developer
Post emulsifier Penetrants
Developing
Wet Developer
Solvent Removable Penetrants
Satisfactory
Acceptance Criteria:
Unsatisfactory
ASME Sec. VIII Div. 1 Appendix 8

Brand of PT Set
NO

__

After PWHT

Application of Penetrant

Judgement

Prepared edge

Type of Penetrant

Removal

Date

Penetrant

ISO Drawing
No.

TASETO FP-S

Line No.

Joint
No

Developer

Welder No.
Root

Cleaner

TASETO FD-S

Capping

Result

SIGNATURE:

SIGNATURE:

PEC QC

Client Rep.

Name & Date


ASNT Level II

PCS-WP-QAC-002-F008

TASETO FR-Q

Remarks

Name & Date


Witness / Reviewed

You might also like