Light Engineering (Nut, Bolt, Washer, Rivets, Etc.)

The document discusses establishing a machining unit to manufacture simple fastening components like bolts, nuts, washers, and rivets. These items have good demand from transportation, construction, and other industries. The manufacturing process would involve using machines like lathes and drills to cut and shape metal pieces according to specifications. Financially, the proposed unit would rent a building and purchase machinery like lathes and drilling machines. It estimates raw material costs of around Rs. 1.62 lakhs per month and a staff of 4 people costing Rs. 28,500 per month. Other expenses are estimated at Rs. 8,000 per month.

Uploaded by

pradip_kumar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views

Light Engineering (Nut, Bolt, Washer, Rivets, Etc.)

The document discusses establishing a machining unit to manufacture simple fastening components like bolts, nuts, washers, and rivets. These items have good demand from transportation, construction, and other industries. The manufacturing process would involve using machines like lathes and drills to cut and shape metal pieces according to specifications. Financially, the proposed unit would rent a building and purchase machinery like lathes and drilling machines. It estimates raw material costs of around Rs. 1.62 lakhs per month and a staff of 4 people costing Rs. 28,500 per month. Other expenses are estimated at Rs. 8,000 per month.

Uploaded by

pradip_kumar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

LIGHT ENGINEERING

(NUT, BOLT, WASHER, RIVETS, etc.)


1. Introduction
The project is envisaged for establishing a machining unit for the
manufacture of simple fastening components such as screws, bolts, nuts, washers, car
clips, rivets and so on. These items are required by all types of industries including
automobiles.
2. Market:
The products have a good demand in local market. Transportation industries like
bicycles, automobiles, body builders, aircrafts etc, building activities such as construction
areas, electrical industries and other heavy and

light industries are the common

customers. Hence the marking of these products will not be a tough


. 3. Manufacturing Process
An unfinished work piece requiring machining will need to have some
material cut away to create a finished product. A finished product would be a work piece
that

meets

the

specifications

set

out

for

that

work

piece

by engineering

drawings or blueprints. A lathe is a machine tool that can be used to create that diameter
by rotating a metal workpiece, so that a cutting tool can cut metal away, creating a
smooth, round surface matching the required diameter and surface finish. A drill can be
used to remove metal in the shape of a cylindrical hole. Other tools that may be used for
various types of metal removal are milling machines, saws, and grinding machines. Many
of these same techniques are used in woodworking.the "traditional" machining processes,
such

as turning, boring, drilling, milling, broaching, sawing,shaping, planing, reaming,

and tapping, or sometimes to grinding.


FINANCIAL ASPECTS
1.

Land

Free hold

2.

Building

Rented

3.
Sl.N
o
1
2
3
4
5
6
7
8
9
10

4
.
1
2
3

5
.
1
2
3

Plant & Machinery


Item
Qt
Lathe Machine
1y
No
Tread rolling
machine
11.
Stand
Drill
N0
No
Hand Grinders
2
.
No
Hand Driller
3.
No.
Hammer & Tools
LS1.
Rivette Machine
No
Cutting
1
Machine
No
Sheet
Cutters
2.
No
Transportation, Errection,Sales Tax etc. .
.
Total

Rs.
97,500
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

125,000.00
Rs.
9,500.00
13,000.00
16,000.00
6,000.00
8,000.00
8,000.00
3,750.00
3,250.00

Rs.

3,00,000.00

Rs.
Rs.
Rs.

56,250.00
33,750.00
10,000.00

Rs.

1,62,225.00

Raw Material Required per month


M S
Rods Sheet
Metal
55/= items
Other

1675 kg & Rs. 55/=


1100 kg & Rs.
LS
750 Kg Kg

Total
Man Power per month
Manager
Skilled Workers

1
2

Helper

Total

N
o
N
o.
N.
o
.

Rs.
Rs.

8,000.00
16,000.00

Rs.

4,500.00

Rs.

28,500.00

6
.
1
2
3

Other Expenese per month


Power
Rent
Postage & Telephone

Rs.
Rs.
Rs.

2,000.00
3,000.00
500.00

Miscellenious expenses

Rs.

2,500.00

Total

Rs.

8,000.00