Contoh Power Point Ojt Presentation 1
Contoh Power Point Ojt Presentation 1
AT
DEPARTMENT OF ELECTRICAL
COMMUNICATION
UNIVERSITY TENAGA NASIONAL
Company background
PROPEL NETWORK
being
Cluster Drive..
Time
Shall be conducted on normal
working
day from 9am-7pm.
2. Speed
. The speed limit shall be constantly
maintain at 70km/h.
3. Test measurement tool
. Shall be done using specified tools.
1.
.
Example...
Rigger...
Work done:
1. Site audit
2. Site tuning
3. Measure towers height
Tilt
To cause to slope by raising or
lowering the antenna.
Riggers picture..
Antenna installed
Tools
Work environment
Job scope
Engineer responsibility
Communication skills
Social skills
Time management
Decision making
Think creatively
Conclusion