F01 Rev.1 Inspection Checklist 1

This inspection checklist documents the electrical cable works for Khabat Thermal Power Plant Units 1&2. It includes 7 items to check: 1) cable routes are ready, 2) correct cables are installed, 3) cables are properly terminated and tagged, 4) insulation and continuity checks are completed, 5) high pot tests are performed, 6) bolt torques are satisfactory, and 7) cable installation is proper. The checklist records the subcontractors and inspectors who checked each item and includes spaces for remarks.

Uploaded by

kamil
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
348 views

F01 Rev.1 Inspection Checklist 1

This inspection checklist documents the electrical cable works for Khabat Thermal Power Plant Units 1&2. It includes 7 items to check: 1) cable routes are ready, 2) correct cables are installed, 3) cables are properly terminated and tagged, 4) insulation and continuity checks are completed, 5) high pot tests are performed, 6) bolt torques are satisfactory, and 7) cable installation is proper. The checklist records the subcontractors and inspectors who checked each item and includes spaces for remarks.

Uploaded by

kamil
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Electrical Works(Cable Pulling,Termination and

Jointing)
Inspection Checklist
Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Area / Unit

SEE ATTACHED
DRAWING/CABLE LIST

Item Name / Item No


/ Description

ITP No

KP-00+++-CQ712-G0012

ITP Item

Report No

Date

Drawing No

Rev.

Approximate Date/Time of Related Activity:


No.

ITEM DESCRIPTION

Subcontractor

Cable route is ready for cable installation.

Correct type and size and undamaged cable is installed.

Cable glanding and termination are completed as per the cable lists with numbered tags.

Insulation resistance and continuity checkings are completed and recorded on the
attached checklist for cable insulation test results sheet after glanding&lugging are
completed.

High pot test is completed as per the related specifications and test results are recorded
on the attached sheet.

Bolt torque results are satisfactory.

Cable installation is completed properly.

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-G0012-F01, Rev.1