100% found this document useful (1 vote)
628 views1 page

KP-00+++-CQ712-B7907 - F01 - Rev.0 - MV Switchgear Installation Inspection Checklist1

This inspection checklist is for the MV switchgear installation at Khabat Thermal Power Plant Units 1&2. It verifies that the installed MV switchgear and accessories match the shipping lists, are installed according to approved drawings, and that cable connections are properly tested according to approved method statements and inspection test plans. The checklist also confirms that earth continuity is checked and all connections are properly torqued and marked.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
628 views1 page

KP-00+++-CQ712-B7907 - F01 - Rev.0 - MV Switchgear Installation Inspection Checklist1

This inspection checklist is for the MV switchgear installation at Khabat Thermal Power Plant Units 1&2. It verifies that the installed MV switchgear and accessories match the shipping lists, are installed according to approved drawings, and that cable connections are properly tested according to approved method statements and inspection test plans. The checklist also confirms that earth continuity is checked and all connections are properly torqued and marked.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Electrical Works(MV Switchgear Installation)

Inspection Checklist - 1

Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Area / Unit

SEE ATTACHED
DRAWING/CABLE LIST

Item Name / Item No


/ Description

ITP No

KP-00+++-CQ712-B7907

ITP Item

Report No

1,1 /1,2 / 2 / 3,1 / 3,2 / 3,3

Date
Rev.0

Drawing No
Approximate Date/Time of Related Activity:
No.

ITEM DESCRIPTION

Subcontractor

MV Switchgear and all accessories match with the shipping/delivery list

Floor civil works are done by civil discipline in accordance with the approved drawings

MV Switchgear and all accessories are installed in accordance with the approved
drawings

Cable connections and test are done in accordance with the approved MS and ITP for
Cable Pulling Termination and Jointing

Earth continuity is checked

All connections are done with torque wrench and marked.

Overall insulation measurement and continuity test is done (optional)

GAMA

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-B7907-F01, Rev.0