ERICSSON Node B Commissioning and Integration
ERICSSON Node B Commissioning and Integration
1.1.
1.2.
1.3.
1.4.
Test Phone
Any phone which is capable of the displaying the cell information (eg: TEMS, Phones
with Netmon)
2. Node B Commissioning Process Summary
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11.
2.12.
Format DUW
Install Basic package P7.1.6
Restart the Node B in the basic software
Run Cabinet Equipment Wizard
Run OAM Wizard
Run Site Equipment wizard
Run Iub_Scripts.mo Script
Activate integration unlock
Run HS_EUL_Parameters.mo Script
Changing the RUW power to 60 Watts
Installing the license key file
Creating a Configuration Version.
3. Node B Commissioning
This section explains in detail the steps mentioned in the previous section.
3.1.
Format DUW
Connect the serial cable to the LMT A port of DUW and run Tera Term software.
Make sure that you see the command prompt $
Since the /c2 is not automatically mounted, we will have to manually mount the drive by issuing the
following command.
mount_c2
vols
Now we will proceed with the formatting of the hard drives /c2 and /d. The
commands to do
the format is given below.
formathd /c2
formathd /d
Once the format is done, reload the RBS. After this is done, we again move to the
back up mode to start the configuration. This is done by issuing a reload command
The next step is to proceed with setting the IP address in the nodeB. The command
issued is
ifconfig le0 169.254.1.1 netmask 255.255.0.0
3.2.
Make sure you select the root directory / at the RBS side.
Transfer /c2 and /d directories to the RBS as shown below.
Once the transfer is completed make sure the size of /c2 is 129M and /d is 39M. This
can be done by issuing the vols command
3.3.
We login to the RBS using the element manager software. The local maintenance IP
address of the RBS 6201 is always 169.254.1.1.
3.4.
The RBS is configured with the cabinet type when we run the Cabinet equipment
wizard. Also some basic sector and IP definitions are done in the Cabinet equipment
configuration. The script to be run is 1_Cabinet.xml.
From the tools menu, select Cabinet Equipment configuration. We can choose the
wizard or the scripts option. Since cabinet equipment configuration is quite simple,
we will be running the wizard manually. Please follow the screenshots below.
Click Next
Since we are running the wizard manually click Next. The RBS will proceed with a
restart and it is a normal behaviour. Wait for the restart to complete.
Once the restart is completed, you will see a screen as mentioned below. Click Next
In the next screen you will select the RBS cabinet type, key in the cabinet
information and select the Radio Building blocks for the sectors. We will be using the
radio building block RBB12_1A. In this example we will be configuring two sectors.
Click next once done.
In the next page you will see the power supply and the battery configuration. Key in
the number of PSUs and the battery backup in Ampere Hour if applicable. Click next
once done.
The next page shows the Local maintenance IP address and the subnet mask. The
default IP address for the RBS is 169.254.1.1 and netmask is 255.255.0.0. Click next
once done.
Please confirm the parameters and select the option to restart the RBS after cabinet
equipment configuration.
3.5.
To run the OAM wizard, from the tools menu select OAM access configuration.
Since we will be using the 2_OAM_Script.xml select Use Configuration file and browse
the file from the folder where the OAM file is stored.
The following screens show the parameters that have been defined through
our scripts.
This screen shows the Local Maintenance IP address and the subnet mask.
The next screen shows the OAM IP, OAM VLAN, OAM Gateway and OAM subnet mask configuration.
Also we select the Transmission type (TNB). TNB is used for Optical Gigabit Ethernet through SFP and is
required for IPRAN sites.
This screen shows the Iub IP address, Iub VLan, Iub Gateway,Iub Subnet mask and the IP Sync Ref IP
addresses.
The next screen shows the next HOP IP address which s required for OAM access. The
next hop IP address will be the OAM Gateway IP address.
The next screen shows the Server configuration inside the Singtel network and they
are standard values. Click next once done.
RBS.
The next screen shows the NTP servers for the time setting in the
Confirm the parameters that have been entered in the OAM script.
Click Finish
3.6.
This screen shows the Site name and the logical name.
The next screen shows the SAU and the PSU configuration. SAU is currently used
only for the 6102 sites.
The next screen shows the Sector Data info including the latitude and longitude.
The next screen shows the Carrier configuration on per sector basis.
The next screen defined the band at which the RUs will operate.
The following screen shows the parameter numhscoderesources and numeulresources. Set the parameters
according to the requirement.
Once the Site Equipment configuration is done, you will see the following screen.
3.7.
From the screen below select the Iub script by clicking Browse.
Make sure you select Halt on Errors and Verbose logging before clicking the Start
button.
3.8.
Teraterm) is
$ license iu status
Please see the screenshots below for details.
3.9.
Click on Halt on Errors and Verbose Logging and click Start. You should
3.10.
Most of Singtel RBS sites require that the each carrier supports 30 Watts. Since we
have configured 2 carriers per RUW, we will have to set the total power of RUW to 60
Watts. Thus each carrier will have a power of 30 Watts.
We will have to set the power for all the RUWs in the RBS.
From the MOM view in the Element Managed, browse to the following
path
ManagedElement -> Equipment->RbsSubrack->RbsSlot->
AuxPlugInUnit>RruDeviceGroup->TpaDeviceSet->TpaDevice
In the MO properties window set
maxTotalOutputPower = 60
Click on Apply to confirm the settings.
3.11.
installation.
Now in the following page, key in the following details of the FTP Server(our Laptop).
Username, Password, IP address and the License File Name. It is shown in the screen
shot below.
3.12.
Before proceeding with the creation of CV make sure that there are no
alarms in the RBS.
Go to the CV tab.
Once the CV name and the operator comments are keyed in click Create.
Make sure that the created CV is visible in the CV list. If it is not click refresh. Set the
CV to startable and restart the RBS with the CV.