Material Balance Calculation For Laundry WWTU

This document presents a process flow diagram and material balance for a laundry wastewater treatment unit. It includes design data such as influent and effluent flow rates, solid concentrations, and a 15 day sludge retention time. Calculations determine the waste activated sludge flow rate of 0.11 cubic meters per day and effluent flow rate of 23.89 cubic meters per day. The total solids output is calculated to be 1.51 kilograms per day.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
260 views2 pages

Material Balance Calculation For Laundry WWTU

This document presents a process flow diagram and material balance for a laundry wastewater treatment unit. It includes design data such as influent and effluent flow rates, solid concentrations, and a 15 day sludge retention time. Calculations determine the waste activated sludge flow rate of 0.11 cubic meters per day and effluent flow rate of 23.89 cubic meters per day. The total solids output is calculated to be 1.51 kilograms per day.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PT BANYU BIRU SEJATI

Water and Waste Water Treatment Contractor


Bumi Satria Kencana, Block C No. 9
Jln. KH Noer Ali, Bekasi 17144
Tel. 021-8841762 Fax. 021-8856176

PROCESS FLOW DIAGRAM WITH MATERIAL BALANCE


FOR LAUNDRY WASTEWATER TREATMENT UNIT
BANYU URIP EPC 5
PROJECT NAME

INFRASTRUCTURE FACILITY PROJECT


BOJONEGORO

DOCUMENT NO.

PURCHASE ORDER NO.

CLIENT / END USER NAME

IDBC-BS-VDPRC-C00003

IDBC-RH-MXXEP-C00975-090

MOBIL CEPU LTD.

A. Design Data
01. Primary influent flow rate (Q0)

3
24 m /day

02. Volume Collection Pit


03. TSSin concentration (X0)

95.94 m /day

200 mg/L

04. Waste activated sludge SS concentration (Xw)

3000 mg/L

05. Effluent SS concentration (Xe)

50 mg/L

Laundry WWTU Flow Diagram & Paramaters

IDBC-BS-VDPRC-C00003 Process Flow Diagram with Material Balance for Laundry WWTU_Rev.C

Page 1

PROCESS FLOW DIAGRAM WITH MATERIAL BALANCE


FOR LAUNDRY WASTEWATER TREATMENT UNIT
BANYU URIP EPC 5
PROJECT NAME

INFRASTRUCTURE FACILITY PROJECT


BOJONEGORO

DOCUMENT NO.

PURCHASE ORDER NO.

CLIENT / END USER NAME

IDBC-BS-VDPRC-C00003

IDBC-RH-MXXEP-C00975-090

MOBIL CEPU LTD.

B. Design Calculation of Material Balance for Laundry WWTU


V

3
24 m

01. Waste activated sludge flow rate (Qw)

0.11 m /day

02. Sludge retention time (also called sludge age), SRT


03. Effluent Flow Rate (Qe)

15 days
3
23.89 m /day

Qw = (V*X0)/(SRT*Xw)
Qw

3
0.11 m /day

SolidsOut = (Qe*Xe)+(Qw*Xw)
Where:
Qe = Q0-Qw
Qe
SolidOut

3
23.89 m /day

1.51 kg/day

Prepared by :

PT BANYU BIRU SEJATI

IDBC-BS-VDPRC-C00003 Process Flow Diagram with Material Balance for Laundry WWTU_Rev.C

Page 2