Project Implementation Plan
Project Implementation Plan
OCTOBER 1, 2013
[Company address]
Version History
Version #
Date
Revised By
Document
Approvals
Approver Name
Project Role
Signature/Electronic
Approval
Date
Page | 1
TABLE OF CONTENTS
1.0 Introduction ............................................................................................................................... 3
2.0 Method of preparation of Schedules and Networks .................................................................. 3
2.1 Designated milestones for all project schedules: ...................................................................... 3
2.2 Roles and responsibilities for schedule development: .............................................................. 4
3.0 Method of preparation of Estimates and Cost plans ................................................................. 4
3.1 Cost Management Approach..................................................................................................... 5
3.2 Cost Variance Response Process .............................................................................................. 6
4.0 Quality Plans ............................................................................................................................. 6
5.0 Configuration Management System ......................................................................................... 7
6.0 Work Breakdown Structure (WBS) .......................................................................................... 9
6.1 Outline view of the MCCP WBS .............................................................................................. 9
6.2 Tree Structure View of the MCCP WBS ................................................................................ 10
7.0 Management Reporting System .............................................................................................. 11
Page | 2
1.0 Introduction
The Minna City Centre Project (MCCP) Project Implementation Strategy/Plan details the
project management techniques and tools that will be applied to the project. The objective of
this implementation plan will be to reduce the risk of implementation failure during the
execution of the MCCP. Specifically, it gives a summary of the following:
Method of preparation of; schedules and networks, estimates and cost plans, quality
plans and safety plans.
Work Breakdown Structure (WBS) and operational links to cost management systems.
Project kick-off
Project implementation
If the Schedule Performance Index or Cost Performance Index has a variance of between
0.1 and 0.2 the Project Manager must report the reason for the exception. If the SPI or CPI
has a variance of greater than 0.2 the Project Manager must report the reason for the
exception and provide management a detailed corrective plan to bring the projects
performance back to acceptable levels.
Page | 5
Yellow
Red
than 1.2
than 1.2
The Project Sponsor will be responsible for approving all quality standards for the
MCCP. The Project Sponsor will review all project tasks and deliverables to ensure
Page | 6
compliance with established and approved quality standards. Additionally, the Project
Sponsor will sign off on the final acceptance of the project deliverable.
The Project Manager will be responsible for quality management throughout the
duration of the project. The Project Manager is responsible for implementing the
Quality Management Plan and ensuring all tasks, processes, and documentation are
compliant with the plan. The Project Manager will work with the projects approved
quality specialists to establish acceptable quality standards. The Project Manager is
also responsible for communicating and tracking all quality standards to the project
team and stakeholders.
The approved Quality Specialists for the MCCP will be responsible for working with
the Project Manager to develop and implement the Quality Management Plan. The
Quality Specialists will recommend tools and methodologies for tracking quality and
standards to establish acceptable quality levels. The Quality Specialists will also create
and maintain Quality Control and Assurance Logs throughout the project. Metrics will
be established and used to measure quality throughout the project life cycle for the
product and processes. The Quality Group Manager will be responsible for working
with the project team to define these metrics, conduct measurements, and analyze
results. These product and process measurements will be used as one criterion in
determining the success of the project and must be reviewed by the project sponsor
The remaining members of the project team, as well as the stakeholders will be
responsible for assisting the Project Manager and Quality Specialists in the
establishment of acceptable quality standards. They will also work to ensure that all
quality standards are met and communicate any concerns regarding quality to the
Project Manager.
Page | 7
scope of the project and becomes the vehicle against which change can be established. The
Project Manager will work with a configuration or change control committee which will
be responsible for considering change requests in the context of the project as a whole in
order to allow a decision to be made as to whether or not to proceed with the change. The
following steps constitute the procedure that will be utilized by the change control
committee in the consideration of any change request:
Step 1: Identify the need for a change (put forward by any Stakeholder)
Step 2: Log change in the change request register (a register of all change requests
for the duration of the project)
Step 3: Conduct an evaluation of the change requested for (the change control
committee will conduct an evaluation of the impact of the change to cost, risk,
schedule, and scope).
Step 4: Submit change request to the project manager.
Step 5: Change Control Committee decision (the change control committee will
discuss the proposed change with the project manager and decide whether or not it
will be approved based on all submitted information.
Step 6: Implement change- if a change is approved by the change control
committee, the project manager will update and re-baseline project documentation
as necessary, as well as ensure all changes are communicated to the team and
stakeholders.
Page | 8
Minna City
Center Project
1
Project
conception/initiatio
n
Project Planning
1.2
1.1
Briefing process
(Business case and
investment appraisals
Project
development/Execu
tion
Project
implementation/Co
ntrol
Project
termination/Closeo
ut
1.3
1.4
1.5
Create Preliminary
Scope Statement
Project Kickoff
Meeting
1.2.1
1.3.1
Determine Project
Team
1.2.2
1.3.2
Develop Project
Charter
Conceptual Design
Construction stage
1.1.3
1.2.3
1.3.3
1.4.3
1.5.3
Project Sponsor
Reviews Project
Charter
Detail design
1.2.4
1.3.4
Project Status
Meetings
1.4.4
Gain Formal
Acceptance/Commissi
oning
Production
information stage
Update Project
Management Plan
1.3.5
1.4.5
Handing
Over/Signoff
1.5.5
1.1.1
Feasibility studies
1.1.2
1.1.4
Project Charter
Signed/Approved
1.1.5
Procurement Process
Audit Procurement
1.4.1
1.5.1
Contract award
Document Lessons
Learned
1.4.2
1.5.2
1.5.4
Milestone: Project
Plan Approved
1.2.6
Page | 10
BCWS
CV
SV
EAC
VAR
The CAVAR report would summarise performance for the MCCP as a whole and for each layer
of component WBS elements. It would also specifically identify WBS elements where cost or time
overruns are occurring. Negative variances would be traced back until an origin point can be
identified. Appropriate investigations would then be carried out to isolate the precise reasons for
the bad performance and appropriate corrective action would be recommended by the project
manager as part of the CAVAR report.
Page | 11
Page | 12