Requirements
150 0.2
Height of mould, mm
150 0.2
Angle between adjacent interior faces and between interior faces and top and
bottom plates of mould.
280
215
0.03
0.05
8
90 0.5 0
10
materials
a) Side plate
b) Base plate
TAMPING ROD
0.03
Cast iron
Cast iron
As per IS:10086-1982, the tamping rod shall be 160.5 mm dia and 6002 mm long with a rounded working end
and shall be made of mild steel.
COMPRESSION TESTING MACHINE:
The compression testing machine shall be as per IS:14858-2000. The machine shall be capable of applying the
load at the specified rate, uniformly without shock using manual or automatic control. The percentage of error
shall not exceed 1.0 percent of the indicated load.
On regular basis the machine should be calibrated with in a period not exceeding 12 months from previous
verification. The machine is required to be calibrated on original installation or relocation, subject to major repairs
or adjustment and whenever there is reason to doubt the accuracy of the results, without regard to the time
interval since the last verification.
The accuracy of the testing machine shall be verified by applying five test loads in four approximately equal
increaments in ascending order. The difference between any two successive loads shall not exceed one third of
the difference between the maximum and minimum test loads. The load as indicated by the testing machine and
the applied load computed from the readings of the verification devices shall be recorded at each test point.
Calculate the error, E, and the percentage of error, EP for each point from these data as follows:
E = A B
Ep=[E/B]x100
A = load in N indicated by the machine being verified and
B = applied load in N as determined by the calibrating device
(such as proving ring, load cell, calibrating cylinder etc.)
For checking further accuracy of testing machine concrete cubes of the same grade, batch, age in SSD condition
should be tested on the machine being checked and on a already calibrated standard compression testing
machine and find the difference. Proper and regular calibration of testing machines is essential.
SAMPLE OF CONCRETE
Sample of concrete for test specimen shall be taken at the mixer or in the case of ready mixed concrete from the
transportation vehicle discharge. Such samples shall be obtained by repeatedly passing a scoop or pail through
the discharge stream of the concrete. The samples thus obtained shall be mixed on a non-absorbent base with
shovel until it is uniform in appearance.
Sampling should be spread over the entire period of concreting and the frequency of sampling of concrete of
each grade shall be as following:
Quantity of concrete in the work
(m3)
Number of samples
1-5
6-15
16-30
31-50
51 and above
Note:- Frequency of sampling may be agreed upon internally by supplier and purchaser.
CASTING OF CUBES:
The cube mould plates should be removed, properly cleaned assembled and all the bolts should be fully tight. A
thin layer of oil then shall be applied on all the faces of the mould. It is important that cube side faces must be
parallel.
After taking concrete samples and mixing them, the cubes shall be cast as soon as possible. The concrete
sample shall be filled into the cube moulds in layers approximately 5 cm deep. In placing each scoopful of
concrete, the scoop shall be moved around the top edge of the mould as the concrete slides from it, in order to
ensure a symmetrical distribution of the concrete with in the mould. Each layer shall be compacted either by
hand or by the vibration as described below.
COMPACTION BY HAND:
Each layer of the concrete filled in the mould shall be compacted by not less than 35 strokes by tamping bar.
The strokes shall be penetrate into the underlying layer and the bottom layer shall be rodded throught its depth.
Where voids are left by the tamping bar the sides of the mould shall be tapped to close the voids.
COMPACTION BY VIBRATION:
When compacting by vibration each layer shall be vibrated by means of an electric or pneumatic hammer or
vibrator or by means of a suitable vibrating table until the specified condition is attained.
CURING :
The casted cubes shall be stored under shed at a place free from the vibration at a temperature 220C to 330C
for 24 hours covered with wet straw or gunny sacking.
The cube shall be removed from the moulds at the end of 24 hours and immersed in clean water at a
temperature 240C to 300C till the 7 or 28-days age of testing. The cubes shall be tested in the saturated and
surface dry condition.
For the true representation of actual strength of concrete in the structure, extra cubes shall be cast, stored and
curded as per the identical conditions of that structure, and tested at required age.
TESTING OF CONCRETE CUBES:
The dimensions of the specimens to the nearest 0.2 mm and their weight shall be noted before testing. The
bearing surfaces of the testing machine shall be wiped clean and any loose sand or other materials removed
from the surface of the specimen which are to be in contact with the compression platens. The cube shall be
placed in the machine in such a manner that the load shall be applied to opposite sides of the cubes as cast that
is not to the top and bottom. The axis of the specimen shall be carefully aligned with the centre of the thrust of
the spherically seated platen. No packing shall be used between the faces of the test specimen and the steel
platen of the testing machine. As the spherically seated block is brought to bear on the specimen, the movable
portion shall be rotated gently by hand so that uniform seating may be obtained. The load shall be applied
without shock and increased continuously at a rate of approximately 140 kg/sq cm/min until the resistance of the
specimen to the increasing load breaks down and no greater load can be sustained. The maximum load applied
to the specimen shall then be recorded and the appearance of the concrete and any unusual features in the type
of failure shall be noted, see fig-1and fig-2. The compressive strength of concrete shall be calculated
from:Maximum load/Cross-Sectional area of cube
To be reported to the nearest 0.5N/mm 2
ACCEPTANCE:
For the acceptance, both the conditions should be met with:
a) The mean strength determined from any group of four-non overlapping consecutive test results should comply
with the appropriate limits as given in table-2
b) Any individual test result complies with in the appropriate limit as given in table-2
Table-2 : Characteristic Compressive Strength Compliance Requirement:
Specified
grade
M-15
>=fck 3 N/mm2
Note: In absence of established standard deviation, the values given in Table-8 of IS:456-2000 may be assumed.
INTERPRETATIONS-EXAMPLE FOR M-25 GRADE OF CONCRETE
For a pour of 31-50 m3 4 samples (each sample having 3 cubes) are mandatory.
1. The average value of set of three cubes (one sample) should have strength with in the limits of 15% of the
average value. Otherwise the result of that sample will be invalid.
2. The mean value of 4 samples (4 average values obtained from each sample of 3 cubes) should meet the
criteria as given in table-2. For M-25 grade of concrete the mean value of these 4 samples should not be less
than either 29 N/mm2 or 25 N/mm2 plus 0.825 times the standard deviation whichever is the greater.
3. Any individual test result of a cube out of the above should not have value less than 21 N/mm 3.
In case of doubt regarding the grade of concrete used either due to poor workmanship or based on results of
cube strength test further tests should be conducted such as non-destructive test by Concrete Test Hammer,
Ultrasonic Concrete Tester etc. Partial destructive test by drilling cores and testing them in compression. In no
case fewer than three cores be tested. The final test include the load testing on structure.
DURABILITY OF CONCRETE:
Cube testing alone is not the criteria for the durability of concrete structure. A durable concrete is one that
perform satisfactorily in the working environment during its anticipated exposure conditions during service. The
materials and mix proportions specified and used should be such as to maintain its integrity and if applicable, to
protect embedded metal from corrosion.
It is essential that every concrete structure should continue to perform its intended functions, that is maintained
its required strength and serviceability, during the specified or traditionally expected service life. It follows that
concrete must be able to withstand the processes of deterioration to which it can be expected to be exposed.
Such concrete is said to be durable.
Both strength and durability have to be considered explicitly at the design stage. The emphasis is on the word
both because it would be a mistake to replace overemphasis on strength by overemphasis on durability.
REFERENCES:
1
IS:4562000
IS:100861982
Specification for Moulds for use in Testing of Cement and Concrete, BIS, New Delhi
IS:148582000
Compression Testing Machine used for testing of Concrete and Mortar Requirements,
BIS, New Delhi.
IS:5161959
kishore
kaushal
kishore
kaushal
Corrosion Damaged Concrete Civil Engineering and Construction Review, New Delhi,
January, 1991, PP:27-31
kishore
kaushal
Durability and Corrosion of Steel in concrete. The Institution of Engineers (India) All
India Seminar on Durability of Concrete and Cement Products, Nagpur, 22-23 Sept, 1990
kishore
kaushal
Durability of Concrete Indian Concrete Institute Bulletin No. 54, Jan-Mar, 1996,
PP: 11-13
kishore
kaushal
Concrete Cube Testing Civil Engineering and Construction April, 1995, PP:33
10
kishore
kaushal
Concrete Cube Testing Bulletin of Indian Concrete Institute No. 51, April-June, 1995
11
kishore
kaushal
12
kishore
kaushal
Non-Destructive Testing of Concrete Builders Friend, Lucknow, Feb, 1992, PP: 3-4