0% found this document useful (0 votes)
1K views

Dopet / Black Cat: Pump Alignment Inspection Report

The pump alignment inspection report summarizes measurements taken of a flare upgrade project pump for Qatar Petroleum. It includes dimensions such as the elevation of suction and discharge nozzles, distance between couplings, levelness, and horizontal and vertical alignment readings. The report finds the pump meets specified dimensions according to the drawings and specifications.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Dopet / Black Cat: Pump Alignment Inspection Report

The pump alignment inspection report summarizes measurements taken of a flare upgrade project pump for Qatar Petroleum. It includes dimensions such as the elevation of suction and discharge nozzles, distance between couplings, levelness, and horizontal and vertical alignment readings. The report finds the pump meets specified dimensions according to the drawings and specifications.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

DOPET / BLACK CAT

D. B. C. CONSORTIUM

GTC118/2000-DUKHAN FLARE UPGRADE PROJECT

PUMP ALIGNMENT INSPECTION REPORT


REPORT No.

CUSTOMER

TAG No.

PROJECT No.

SYSTEM:

LOCATION:

DISCIPLINE

Mechanical

Qatar Petroleum
GTC 118/2000

JOB No.

DWG.No:

J7400

P & ID No.

Specified Dim.
As per
Drg/Spec.

Measured Dim.
Actual

Difference

REMARKS

Elevation of Suction
Nozzle
Elevation of Discharge
Nozzle
Distance between
couplings-D
Flange
Levelness- X

N/A

Horizontal Alignment

N/A

Vertical Alignment

N/A

Horizontal Alignment Readings(Face)


00
2700

900

2700

1800

CHECKED BY

Vertical alignment Readings(Rim)


00
900
180 0

DBC

QP

COMPANY
NAME
SIGNATURE
DATE:
Form pumpIR