75% found this document useful (4 votes)
1K views54 pages

A Case Study-Delhi Metro Phase III - Balanced Cantilever Bridge

Project Engineer : Piyush Kumar Santhalia A Case Study on Balanced Cantilever Delhi Metro Phase III - Balanced Cantilever Bridge- - Midas Civil

Uploaded by

Khaled Elbanna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
1K views54 pages

A Case Study-Delhi Metro Phase III - Balanced Cantilever Bridge

Project Engineer : Piyush Kumar Santhalia A Case Study on Balanced Cantilever Delhi Metro Phase III - Balanced Cantilever Bridge- - Midas Civil

Uploaded by

Khaled Elbanna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54

A Case Study on Balanced Cantilever

Bridges Delhi Metro Phase III


Piyush Santhalia Project Engineer

Case Studies
Sl.
No

Span
Project
Arrangement (m)

Client

Contractor Status

34 + 60 + 34

CC28
Delhi Metro
Phase III, Line 7

Delhi
Metro

L&T

Completed

60 + 60

CC28
Delhi Metro
Phase III, Line 7

L&T

Superstructure
partly
completed

37 + 69 + 67 + 55
+ 34

CC26R
Delhi Metro
Phase III, Line 7

ITD

Foundation
and Substructure
completed

CC28 Balanced Cantilever Bridge

i) 34 + 60 + 34 m

ii) 60 + 60 m

CC28 Balanced Cantilever Bridge


I. 34 + 60 + 34 m

II. 60 + 60 m

CC28 Balanced Cantilever Bridge


I. 34m + 60m + 34m
Structure Type : Cast-in-Situ PSC Box Girder

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34m Span - General Arrangement

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Cross Sections

Overall Width of Deck = 8.844 m


Depth of the Box Girder: Varies from 5m at intermediate Piers to 2.1m at Mid-Span

Area (m2)

8.890

Iyy (m4)

28.79

Area (m2)

4.980

Iyy (m4)

2.63

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Foundation & Sub - structure

Intermediate Piers P122 and P123 are integral Piers.


Twin Piers, each leaf of dimension 1000 X 3400 mm

Free Bearings at P121 and P124.


Circular Piers with 2100 mm diameter
Pile Foundation

1000 mm dia. , cast-in-situ bored piles.

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Construction Sequence

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Construction Sequence contd

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Construction Sequence contd

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Construction Sequence contd

Casting of Segment S8 (one just before stitch segment)

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Construction Sequence contd

Casting of Stitch Segment

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Midas Civil has been used for numerical modelling and Structural Analysis
- Super Structure (Box Girder) Piers and Piles have been modelled as Line Element
- Pile Cap has been modelled as plate element.
- Point Spring Supports to take the effect of soil.

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

- Concrete

Analysis & Design

has been modelled with time dependent properties in Midas Civil

- Creep and Shrinkage and compressive strength gain behaviour has been defined as
per CEB-FIP

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

- Internal Prestressing
- 19T15 and 12T15 anchorages

Analysis & Design

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Simulation of exact Construction Sequence in Midas.


- Able to check stresses at intermediate steps in all construction stages.

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Maximum Stress (Tension) at top Fibre Envelope (during construction)

- Maximum Compression at Top Fibre Envelope (during construction)

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Maximum Tension at Bottom Fibre Envelope (during construction)

- Effect of stressing Tendons one by one

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Results: Stress Check for Service Loads: Normal Case

Stresses at Top Fibre due to Combination G I (N/mm2)

Stresses at Bottom Fibre due to Combination G I (N/mm2)

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Pre-camber: Day of commissioning as the critical day

- Precision: Only 6mm of difference between the theoretical value and the
observed value of deflection at the cantilever tips, just before stitching.

CC28 Balanced Cantilever Bridge


I.

34 + 60 + 34

Analysis & Design

- Deformation, including the effect of creep after 120 years

Deformation due to Normal Case after 120 years (mm)

CC28 Balanced Cantilever Bridge


II. 60m + 60m
Structure Type : Cast-in-Situ PSC Box Girder

CC28 Balanced Cantilever Bridge


II. 60 + 60m Span - General Arrangement

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Cross Sections

Overall Width of Deck = 8.844 m


Depth of the Box Girder: Varies from 5m at intermediate Piers to 2.868m at Mid-Span

Area (m2)

8.890

Iyy (m4)

28.79

Area (m2)

5.71

Iyy (m4)

5.86

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Foundation & Sub - structure

Intermediate Piers P217 is integral Piers.


2300mm Diameter circular Pier

Free Bearings at P216 & P218.


Circular Piers with 2100 mm diameter
Pile Foundation

1000 mm dia. , cast-in-situ bored piles.

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Analysis & Design

- Midas Civil has been used for numerical modelling and Structural Analysis
- Super Structure (Box Girder) Piers and Piles have been modelled as Line Element
- Pile Cap has been modelled as plate element.
- Point Spring Supports to take the effect of soil.

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Construction Sequence & Analysis

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Construction Sequence contd

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Construction Sequence contd

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Construction Sequence contd

CC28 Balanced Cantilever Bridge


II. 60 + 60m
- Internal Prestressing
- 19T15 and 12T15 anchorages

Analysis & Design

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Analysis & Design

- Maximum Stress (Tension) at Top Fibre Envelope (during construction)

- Maximum Compression at Top Fibre Envelope (during construction)

Sign Convention: +ve Value of Stresses denote Tension


-ve Values denote compression

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Analysis & Design

- Maximum Tension at Bottom Fibre Envelope (during construction)

- Maximum Compression at Bottom Fibre Envelope (during construction)

Sign Convention: +ve Value of Stresses denote Tension


-ve Values denote compression

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Analysis & Design

- Results: Stress Check for Service Loads: Normal Case

Stresses at Top Fibre due to Combination G I (N/mm2)

Stresses at Bottom Fibre due to Combination G I (N/mm2)


Sign Convention: +ve Value of Stresses denote Tension
-ve Values denote compression

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Analysis & Design

- Pre-camber: Day of commissioning as the critical day

CC28 Balanced Cantilever Bridge


II. 60 + 60m

Analysis & Design

- Deformation, including the effect of creep after 120 years

Deformation due to Normal Case after 120 years (mm)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m Span - General Arrangement

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Cross Sections

Overall Width of Deck = 8.844 m


Depth of the Box Girder: Varies from 4.7m at intermediate Piers to 2.8m at Mid-Span

Area (m2)

10.01

Iyy (m4)

28.73

Area (m2)

5.90

Iyy (m4)

6.13

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence

Intermediate Piers
P235:
Free Pier
P236:
Integral Pier
P237:
Integral Pier
P238:
Free Pier

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

Stresses at Bottom Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

Stresses at Bottom Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

Stresses at Bottom Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

Stresses at Bottom Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Construction Sequence contd

Stresses at Top Fibre due to DL + PS + CR + SH (N/mm2)

Stresses at Bottom Fibre due to DL + PS + CR + SH (N/mm2)

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Pile Arrangement at P235


Intermediate Piers
P235:
Free Pier
P236:
Integral Pier
P237:
Integral Pier
P238:
Free Pier

Foundation & Sub - structure

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Pile Arrangement at P236


Intermediate Piers
P235:
Free Pier
P236:
Integral Pier
P237:
Integral Pier
P238:
Free Pier

Foundation & Sub - structure

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Pile Arrangement at P237


Intermediate Piers
P235:
Free Pier
P236:
Integral Pier
P237:
Integral Pier
P238:
Free Pier

Foundation & Sub - structure

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

- Internal Prestressing
- 19T15 and 12T15 anchorages

Analysis & Design

CC26R Balanced Cantilever Bridge


I.

37 + 69.9 + 67 + 55 + 34m

Analysis & Design

Stress Check for Service Loads: Normal Case

Stresses at Top Fibre due to Combination G I (N/mm2)

Stresses at Bottom Fibre due to Combination G I (N/mm2)

Sign Convention: +ve Value of Stresses denote Tension


-ve Values denote compression